P039 YOKOSUKA AM-0003 DRAFT SPECIFICATIONS.pdf
PDF 3 MB Posted
- Attached to
- P039 Ship Handling and Combat Training Facilities Federal contract opportunity
- Solicitation number
- W912HV-23-Z-0018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P039 AM-0007 DRAFT DRAWINGS.pdf | ||
| P039 YOKOSUKA AM-0003 DRAFT DRAWINGS.pdf | ||
| P039 YOKOSUKA AM-0006 DRAFT Drawings.pdf | ||
| P039_YOKOSUKA_DRAFT_PART 1 OF 3 DRAWINGS.pdf | ||
| P039-YOKOSUKA_DRAFT Specifications.pdf | ||
| P039_YOKOSUKA_DRAFT_PART 2 OF 3 DRAWINGS.pdf | ||
| P039_YOKOSUKA_DRAFT_PART 3 OF 3 DRAWINGS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 88 PAGES
YOKOSUKA P039 TRAINING FACILITY
01 11 00.00 10 SD-01 Preconstruction Submittals
1.10Initial Site Conditions Photos
1.6 GKey Personnel Qualifications
SD-07 Certificates
1.10Monthly Progress Photos
01 20 00 SD-07 Certificates
3.2 GBill Of Lading
3.2 GBill Of Lading
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
1.8.1 GSubmittal Register Monthly
Update
01 33 29 SD-01 Preconstruction Submittals
1.4.3 GHigh Performance and
Sustainable Building Checklist
3.1.2 GHigh Performance and
Sustainable Building Checklist
SD-11 Closeout Submittals
1.4.3 GHigh Performance and
Sustainable Building Checklist;
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 1
(AM-0003)
DRAFT
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 88 PAGES
01 33 29 3.1.2 GHigh Performance and
Sustainable Building Checklist;
01 35 26 SD-01 Preconstruction Submittals
1.7.2.2 GStandard Lift Plan
1.7 GAccident Prevention Plan (APP)
1.7.2.3 GCritical Lift Plan
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.3 GCrane Operators/Riggers
1.7.2.3 GNaval Architecture Analysis
1.8 GActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 88 PAGES
01 45 35 SD-06 Test Reports
3.1.1Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Certificate of Compliance
1.5.17 GSpecial Inspector of Record
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.1Interim Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
3.3.2 GTemporary Utility Connections
Plan
01 57 19 SD-01 Preconstruction Submittals
1.6 G PWDEEnvironmental Protection Plan
1.6 G PWDEEnvironmental Protection Plan
1.11 G PWDEEnvironmental Protection Plan
1.11 G PWDEEnvironmental Protection Plan
1.10.3 G PWDEEnvironmental Manager
Qualifications
1.6 G PWDEEnvironmental Brief Checklist
1.6 G PWDEEnvironmental Manager
Designation Letter
1.6 G PWDEEmployee training records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 88 PAGES
01 57 19 1.6 G PWDEConstruction/excavation drawings
1.6 G PWDEContractor Hazardous Material
Inventory Log
1.6 G PWDESafety Data Sheets (SDS)
1.6 G PWDESolid Waste Management Plan
1.6 G PWDETransportation and disposal
permits/licenses for solid waste
1.6 G PWDETransportation and disposal
permits/licenses
1.6 G PWDEContractor Hazardous Waste
Accumulation Point (HWAP)
Documentation Form
SD-06 Test Reports
3.8.2.1 G PWDESolid Waste Management Report
3.7.2 G PWDENonhazardous Solid Waste
Diversion Report
1.6 G PWDELaboratory analysis and analytical
reports
1.6 G PWDESampling and analysis data
reports/records
1.6 G PWDEInspection reports/records
SD-07 Certificates
1.8.1.2 G PWDEECATTS Certificate Of
Completion
1.9.1 G PWDEAsbestos Certification
1.9.2 G PWDELead Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 88 PAGES
01 57 19 3.11 G PWDEWritten Assessment Of Friable
Asbestos Disturbance
1.6 G PWDEEmployee training records
including ECATTS certificate of completion
1.6PCB-Free Certificate
SD-11 Closeout Submittals
3.8.3.4 G PWDEDisposal Documentation for
Hazardous and Regulated Waste
1.10.4 G PWDEAssembled Employee Training
Records
3.8.2.1 G PWDESolid Waste Management Report
3.8.3.1 G PWDEHazardous Waste/Debris
Management
1.13 G PWDEEnvironmental Records Binder
1.6 G PWDEStatement that no prohibited
materials were used
1.6 G PWDEContractor Hazardous Material
Inventory Log
1.6 G PWDEWaste
determination/characterization records/documentations
1.6 G ROCFAY Solid Waste Tonnage
Report
1.6 G RODRMS Form 2016 (Freon-Free
Certification)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 88 PAGES
01 57 19 1.6 G PWDDisposal documentations for solid waste
1.6 G PWDEDisposal documentations for
hazardous waste
1.6 G PWDEHWAP Weekly Inspection
Checklist
1.6 G PWDEDrawings and blue prints of
modifications made to POL storage containers, USTs, and their appurtenances
1.6 G ROClosure reports for POL storage
containers and USTs
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 78 00 SD-03 Product Data
1.7.1 GWarranty Management Plan
1.7.5Warranty Tags
3.8Final Cleaning
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 6
(AM-0003)
DRAFT
j2ee9gsg Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 88 PAGES
01 78 00 SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
1.7.1 GAs-Built Record of Equipment
and Materials
3.6 GAs-Built Record of Equipment
and Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
3.9 GInterim DD FORM 1354
3.9 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.15 10 SD-01 Preconstruction Submittals
1.7 GCommissioning Firm
1.7.1Lead Commissioning Specialist
1.7.2Technical Commissioning
Specialists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 7
(AM-0003)
DRAFT
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 88 PAGES
01 91 00.15 10 1.7Commissioning Firm's Contract
SD-06 Test Reports
3.1.3 GDesign Review Report
3.1.2.1 GInterim Construction Phase
Commissioning Plan
3.1.2.2 GFinal Construction Phase
Commissioning Plan
3.1.5.2 GBuilding Envelope Inspection
Checklists
3.1.5.3 GPre-Functional Checklists
1.8Issues Log
3.2 GCommissioning Report
3.3.1 GPost-Construction Trend Log
Report
SD-07 Certificates
1.9 GCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.6 GTraining Plan
3.1.6Training Attendance Rosters
3.1.7 GSystems Manual
3.1.8Maintenance and Service Life
Plans
SD-11 Closeout Submittals
3.1.2.1 GConstruction Phase
Commissioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 8
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 88 PAGES
01 91 00.15 10 3.2 GFinal Commissioning Report
02 61 13 SD-01 Preconstruction Submittals
1.3 G PWDEWork Plan
SD-02 Shop Drawings
3.1Surveys
SD-06 Test Reports
3.8.1Compaction
3.10 G PWDEClosure Report
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 G PWDEHazardous Waste Management
Plan
3.2 G PWDEOnsite Hazardous Waste
Management
SD-06 Test Reports
3.7 G PWDERecordkeeping
3.7 G PWDEException Report
3.8Spill Response
SD-07 Certificates
1.4.1 G PWDETransportation and Disposal
Coordinator
1.4.2 G PWDETraining
3.3.3 G PWDEShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 9
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 88 PAGES
02 81 00 3.6Waste Minimization
02 82 00 SD-03 Product Data
1.2.2Amended Water
1.3.9Safety Data Sheets (SDS) for All
Materials
2.1Encapsulants
3.1.2.1Respirators
3.1.7Local Exhaust Equipment
3.1.7Pressure Differential Automatic
Recording Instrument
3.1.8Vacuums
3.1.10Glovebags
SD-06 Test Reports
1.5.6Air Sampling Results
1.5.7Pressure Differential Recordings for Local Exhaust System
3.2.10.5Clearance Sampling
3.3.3.2Asbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5Notifications
1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11Testing Laboratory
1.3.12Landfill Approval
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 10
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 88 PAGES
02 82 00 1.3.12Delivery Tickets
1.3.12 GWaste Shipment Records
1.3.13Transporter Certification
1.3.14Medical Certification
1.5.2 GPrivate Qualified Person
Documentation
1.5.3 GCompetent Person
1.5.4Worker's License
1.5.5Contractor's License
2.1Encapsulants
3.1Equipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3Water Filtration Equipment
3.1.8Vacuums
3.1.8Ventilation Systems
SD-11 Closeout Submittals
1.3.5Permits and Licenses
1.3.5Notifications
1.3.7.1Respirator Program Records
1.5.9Protective Clothing
Decontamination Facility
Notification
1.7.1Rental Equipment
1.3.12.1Records
02 83 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 11
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 88 PAGES
02 83 00 1.5.2.3Occupational and Environmental
Assessment Data Report
1.5.2.4Medical Examinations
1.5.2.8 GLead, Cadmium, Chromium
Waste Management Plan
1.5.4Licenses, Permits and
Notifications
1.5.5Occupant Protection Plan
3.4.1.1Initial Sample Results
3.5.2.1Written Evidence of TSD
Approval
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan
3.1.1.4 GLead, Cadmium, Chromium
Compliance Plan
SD-03 Product Data
1.6.1Respirators
1.6.4Vacuum Filters
1.6.7Negative Air Pressure System
2.1Materials and Equipment
2.1.1Expendable Supplies
3.1.1.3Local Exhaust Equipment
3.1.1.3Pressure Differential Automatic
Recording Instrument
3.1.1.4Pressure Differential Log
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 12
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 88 PAGES
02 83 00 1.5.2.3Occupational and Environmental
Assessment Data Report
1.5.2.3Sampling Results
1.5.3Pressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
3.5.2.1 GTurn-In Documents or Weight
Tickets
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.8 GLaboratory Accreditation
SD-02 Shop Drawings
2.1Formwork
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.1Formwork Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.6.2Mechanical Reinforcing Bar
Connectors
1.6.3.2Pumping Concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 13
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 88 PAGES
03 30 00 1.6.3.3Finishing Plan
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1Concrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.10.2.1Tolerance Report
3.14.2.3Compressive Strength Tests
3.14.2.5Unit Weight of Structural
Concrete
3.14.2.6Chloride Ion Concentration
3.14.2.4Air Content
3.14.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
1.6.3.4VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.5Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 14
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 88 PAGES
03 30 00 SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
05 05 20.00 27 SD-01 Preconstruction Submittals
1.5.1.1 GInstaller Qualifications
1.5.1.2 GPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 GMechanical Anchors in Concrete
2.1.1.4 GAdhesive Anchor System in
Concrete
2.1.1.5 GMechanical and Adhesive
Anchors in Masonry
3.1.3 GNon-Shrink, Non-Metallic Grout
SD-06 Test Reports
3.3.4 GPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 GPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2 GManufacturer's Printed
Installation Instructions
3.1.3 GNon-Shrink, Non-Metallic Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 15
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 88 PAGES
05 05 20.00 27 1.5Manufacturer's Material Safety
Data Sheets
05 05 23.13 10 SD-01 Preconstruction Submittals
1.4.1 GPersonnel Qualification
2.1.1 GProcedure description
SD-03 Product Data
2.1.1Equipment and accessories
SD-06 Test Reports
1.4.5Equipment Qualifications
3.4.1Inspection Test Reports
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 16
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 88 PAGES
05 12 00 1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
SD-06 Test Reports
2.6.2Class B Coating
3.7.1.2Weld Inspection Reports
3.7.2.1Bolt Testing Reports
3.7.3Embrittlement Test Reports
SD-07 Certificates
1.3MLIT Structural Steel Fabricator
Quality Certification
1.3MLIT Structural Steel Erector
Quality Certification
3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 17
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 88 PAGES
05 30 00 1.3.2Welder Qualifications
1.3.2Welding Procedures
1.3.3.1Fire Safety
1.3.3.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
05 50 13 SD-02 Shop Drawings
2.4 GCover Plates and Frames
2.5 GExpansion Joint Covers
2.6Floor Gratings
2.7 GBollards/Pipe Guards
2.9 GAngles and Plates
SD-03 Product Data
2.3Corner Guards
2.4Cover Plates and Frames
2.5Expansion Joint Covers
2.6Floor Gratings
SD-04 Samples
2.5Expansion Joint Covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 18
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 88 PAGES
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.4.1 GStructural Steel Plates, Shapes, and Bars
2.4.2 GStructural Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.3.2 GPost-Installed Concrete Anchors
2.2.4 GProtective Coating
2.2.2 GSteel Pan Stairs
2.3.1 GSteel Stairs
SD-07 Certificates
1.3 GWelding Procedures
1.3 GWelder Qualifications
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 19
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 88 PAGES
05 51 00 2.4.1 GStructural Steel Plates, Shapes, and Bars
2.4.2 GStructural Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.2.4 GProtective Coating
2.3.2 GPost-Installed Concrete Anchors
05 51 33 SD-02 Shop Drawings
2.3Ladders
2.3.3 GShip's Ladder
SD-03 Product Data
2.3Ladders
2.3.3Ship's Ladder
2.3.2Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 20
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 88 PAGES
05 52 00 1.2.1 GFabrication Drawings
3.2Steel Shapes, Plates, Bars and
Strips
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
3.2.1 GNailers
SD-03 Product Data
2.2.3Adhesives
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
2.2.3Indoor Air Quality for Aerosol
Adhesives
2.2.3Indoor Air Quality for Non-aerosol
Adhesives
06 41 16.00 10 SD-02 Shop Drawings
2.10Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.10.9.3Finish Schedule
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 21
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 88 PAGES
06 41 16.00 10 2.3Plastic Laminates
2.6Cabinet Hardware
SD-07 Certificates
1.4Quality Assurance
1.4.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
1.5.2 GDetail Fabrication Drawings
3.1 GInstallation
SD-03 Product Data
2.1.1 GSolid Polymer
2.3Fabrications
2.2.2Indoor air quality for solid surface seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.4 GCounter Tops
SD-06 Test Reports
2.1.1Test Report Results
2.1.2Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
2.1.1Indoor Air Quality for solid surface fabrication products
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 22
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 88 PAGES
06 61 16 3.2Clean-up
2.1.1 GSolid Polymer
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
1.6.4 GAir Leakage Test Report
3.5.7 GAir Leakage Test Report
1.6.4 GDiagnostic Test Report
3.6.5 GDiagnostic Test Report
07 13 25 SD-03 Product Data
2.1 GPre-Applied Sheet Membrane
Waterproofing
3.2.1 GPre-Applied Sheet Membrane
Waterproofing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 23
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 88 PAGES
07 13 25 3.3.1 GPre-Applied Sheet Membrane
Waterproofing
2.2 GSelf-Adhering Sheet Membrane
Waterproofing
2.2 GSelf-Adhering Sheet Membrane
Waterproofing
3.2.2 GSelf-Adhering Sheet Membrane
Waterproofing
3.3.3 GSelf-Adhering Sheet Membrane
Waterproofing
2.2.1 GPrefabricated Drainage
Composite
SD-04 Samples
2.1 GPre-Applied Sheet Membrane
Waterproofing
3.2.1 GPre-Applied Sheet Membrane
Waterproofing
3.3.1 GPre-Applied Sheet Membrane
Waterproofing
2.2 GSelf-Adhering Sheet Membrane
Waterproofing
2.2 GSelf-Adhering Sheet Membrane
Waterproofing
3.2.2 GSelf-Adhering Sheet Membrane
Waterproofing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 24
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 88 PAGES
07 13 25 3.3.3 GSelf-Adhering Sheet Membrane
Waterproofing
2.2.1 GPrefabricated Drainage
Composite
SD-08 Manufacturer’s Instructions
2.1 GPre-Applied Sheet Membrane
Waterproofing
3.2.1 GPre-Applied Sheet Membrane
Waterproofing
3.3.1 GPre-Applied Sheet Membrane
Waterproofing
2.2 GSelf-Adhering Sheet Membrane
Waterproofing
2.2 GSelf-Adhering Sheet Membrane
Waterproofing
3.2.2 GSelf-Adhering Sheet Membrane
Waterproofing
3.3.3 GSelf-Adhering Sheet Membrane
Waterproofing
2.2.1 GPrefabricated Drainage
Composite
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.1 GBoard Insulation
2.3 GPressure Sensitive Tape
1.4 GProtection Board or Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 25
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 88 PAGES
07 21 13 2.5 GAccessories
2.1.4Recycled Content for Block or
Board Insulation
SD-07 Certificates
2.1 GBoard Insulation
2.4 GProtection Board or Coating
3.4.4 GProtection Board or Coating
1.8 GSpecial Warranties
1.8 GSpecial Warranties
2.1.5Indoor Air Quality For Board
Insulation
SD-08 Manufacturer’s Instructions
2.1Board Insulation
2.5.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2Recycled Content for Insulation
Materials
SD-07 Certificates
2.1.4Indoor Air Quality for Insulation
Materials
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 26
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 88 PAGES
07 22 00 SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
2.4 GFasteners
2.3 GMoisture Control
2.1.2Recycled Content For Insulation
2.1.5Cants and Tapered Edge Strips
SD-06 Test Reports
1.7.1 GFlame Spread Rating
SD-07 Certificates
1.6 GInstaller Qualifications
2.1.3Indoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions
2.4 GFasteners
2.1 GInsulation
07 27 10.00 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 GAir Barrier System Product Data
SD-04 Samples
3.1.2 GMock-Up
SD-05 Design Data
1.8 GDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 27
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 88 PAGES
07 27 10.00 10 1.8 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.7 GAir Barrier Inspector
07 57 00 SD-03 Product Data
2.2 GUrethane Topcoat
SD-02 Shop Drawings
1.4 GRoof Plan Layout
1.4 GInstallation Details
SD-04 Samples
2.2 GUrethane Topcoat
2.3 GVentilation Sheet
2.3 GVentilation Device
SD-06 Test Reports
2.2 GPerformance Requirements
SD-07 Certificates
2.2Urethane Elastomeric Roofing
Material
2.2Protective Coating
SD-08 Manufacturer’s Instructions
2.2 GInstallation
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.13 GDownspouts
3.1.19 GExpansion Joints
3.1.17 GSplash Pans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 28
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 88 PAGES
07 60 00 3.1.14 GFlashing for Roof Drains
3.1.10 GBase Flashing
3.1.11 GCounterflashing
3.1.20 GFlashing at Roof Penetrations
and Equipment Supports
3.1.15 GScuppers
3.1.22 GCopings
3.1.16 GConductor Heads
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 71 00 SD-03 Product Data
2.1.1 GColor
SD-04 Samples
2.1.1 GSamples
SD-06 Test Reports
1.4.1 GTest Reports
SD-07 Certificates
1.4.1 GCertifications
SD-08 Manufacturer’s Instructions
3.2.1 GInstallation Guide
SD-11 Closeout Submittals
1.7 GWarranty;
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 29
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 88 PAGES
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
SD-06 Test Reports
3.1 GField Adhesion
SD-07 Certificates
2.1.1Indoor Air Quality For Interior
Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.7 GFrames
2.7 GFrames
08 31 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 30
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 88 PAGES
08 31 00 1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
2.2.8 GAccessories
1.3.1 GPower Transfer Components
2.1Recycled Content
SD-04 Samples
2.5 GFinishes
SD-06 Test Reports
1.3.1 GFire-rating(s) of Assemblies
1.3.1 GAcoustical Ratings of Assemblies
08 34 73 SD-02 Shop Drawings
2.1Fabrication Drawings
SD-03 Product Data
2.1 GHollow Metal Sound Retardant
Doors
2.1 GDoor Frames
2.1 GDoor Hardware
2.3.2 GDoor Frame Sound Infill
2.1 GVision Panels
2.1 GSeals and Gasketing
2.1 GThresholds
2.1 GAstragals
SD-06 Test Reports
2.4.4 GWind Loading Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 31
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 88 PAGES
08 34 73 2.4.4 GWater Leakage Tests
2.4.4 GAcoustical Tests
2.4.4 GAir Infiltration Tests
2.4.4 GPositive Pressure Tests
SD-07 Certificates
2.1 GHollow Metal Sound Retardant
Doors
2.1 GDoor Frames
2.1 GDoor Hardware
2.1 GVision Panels
1.3.1.3 GSeals,Gasketing and Door
Bottoms
2.1 GThresholds
2.1 GAstragals
3.3.1Assembly Test Reports
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1List of Product Installations
SD-02 Shop Drawings
3.3 GInstallation Drawings
2.2 GFabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
2.2.3 GFinish
2.1.1.2Recycled Content of Aluminum
Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 32
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 88 PAGES
08 41 13 SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports
1.2.1 GCertified Test Reports
3.4.3Deflection
3.4.1Air Infiltration
3.4.4Condensation Resistance and
Thermal Transmittance
3.4.5Water Infiltration
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
SD-11 Closeout Submittals
3.6Manufacturer's Product Warranty
08 44 00 SD-02 Shop Drawings
1.5 GGlazed Curtain Wall System
1.5Installation Drawings
2.4.2 GShop-Painting Aluminum
SD-03 Product Data
1.5 GGlazed Curtain Wall System
2.2 GMetals For Fabrication
2.3 GNonskinning Sealing Compound
2.4.1 GMetal Accessories
2.5 GCurtain-Wall Framing Members
2.8.4 GMasonry Anchorage Devices
1.7.1 GWarranties
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 33
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 88 PAGES
08 44 00 2.4.4 GAnodic Finish
2.4.4 GExposed-to-View Aluminum
Finish
1.5.5 GSeismic Calculations
1.3.4.1 GStructural Calculations for
Deflection
SD-06 Test Reports
1.4.1 GAir Infiltration Test Results
SD-07 Certificates
1.3.4.3 GEnergy Performance Certificates
1.3.2 GQualifications for the Curtain-Wall
Installer
SD-08 Manufacturer’s Instructions
1.5 GGlazed Curtain Wall System
3.3.10 GInsulating Glass
3.6.2 GPreventive Maintenance and
Inspection
SD-11 Closeout Submittals
1.7 GWarranty
08 56 19 SD-02 Shop Drawings
2.2 GDetail Drawings
SD-03 Product Data
1.5Warranty
2.3Pass Windows
3.2 GInstallation
3.3Cleaning
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 34
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 88 PAGES
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.9 GKeying System
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
1.7.1 GInsulating Laminated Glass
2.3.3Sealants
2.3.4Joint Backer
1.3Glazing Accessories
SD-04 Samples
1.7.1 GInsulating Laminated Glass
SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulating Laminated Glass Units
2.2Insulating Laminated Glass Units
08 91 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 35
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 88 PAGES
08 91 00 1.4Wall Louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.5Wall Louver Samples
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
09 29 00 SD-03 Product Data
2.1.5Cementitious Backer Units
2.1.4Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.3Water-Resistant Gypsum Backing
Board
2.1.10Accessories
2.1.1Gypsum Board
2.1.6Voc Content Of Joint Compound
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 36
(AM-0003)
DRAFT
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 88 PAGES
09 30 10 SD-03 Product Data
2.1 GTile
2.1 GMortar, Grout, and Adhesive
2.3 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1 GTransition Strips
2.1 GEpoxy Resin Grout
SD-07 Certificates
1.3.1.1Indoor Air Quality for Adhesives and sealants
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 51 00 SD-02 Shop Drawings
2.1 GApproved Detail Drawings
SD-03 Product Data
1.8 GAcoustical Ceiling Systems
2.2.1.1Recycled Content for Type III
Ceiling Tiles
SD-04 Samples
2.2.1.1 GAcoustical Ceiling Tiles
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 37
(AM-0003)
DRAFT
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 88 PAGES
09 51 00 2.1.1 GCeiling Attenuation Class and
Test
2.1.1 GCeiling Attenuation Class and
Test
SD-07 Certificates
2.2.1.1Indoor Air Quality for Type III
Ceiling Tiles
2.7Indoor Air Quality for Sealants
09 62 38 SD-03 Product Data
2.1 GStatic-Control Resilient Flooring
2.3 GAccessories
2.2 GAdhesives
1.9Warranty
SD-04 Samples
2.1 GStatic-Control Resilient Flooring
1.3.1.2 GSpecial Treatment Materials
2.3 GAccessories
SD-06 Test Reports
2.6Fire Resistance
3.2Moisture, Alkalinity and Bond
3.6Testing
SD-07 Certificates
2.1.1.1Indoor Air Quality for
Static-Dissipative Vinyl Tile
2.2Indoor Air Quality for Adhesives
1.6Qualifications of Applicator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 01 33 00-B Page 38
(AM-0003)
DRAFT
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 88 PAGES
09 62 38 SD-08 Manufacturer’s Instructions
2.1 GStatic-Control Resilient Flooring
2.3 GAccessories
SD-10 Operation and Maintenance
Data
2.1 GStatic-Control Resilient Flooring
2.3 GAccessories
09 65 00 SD-02 Shop Drawings
2.11 GResilient Flooring and
Accessories
SD-03 Product Data
2.11 GResilient Flooring and
Accessories
2.7Adhesives
1.4.1Luxury Vinyl Tile
1.4.1Solid Vinyl Tile
1.4.1Wall Base
2.4Wall Base
2.5Stair Treads, Risers and
Stringers
SD-04 Samples
2.11 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R…
This is the start of the file's text. The full file is on GovTribe.