Over Haul Description - 12-390-8935.pdf
PDF 18 KB Posted
- Attached to
- ION EXCHANGE COMPOUND
- Solicitation number
- 70Z08521Q39019B00
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR Clauses.pdf | ||
| JOTFOC.pdf | ||
| 2121401B4200RJ037_REPAIR SPECS.doc | DOC document | |
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME ION EXCHANGE COMPOUND
STOCK NUMBER 6810-12-390-8935
PART NUMBER 213731
USED ON TRS-3D 75 RADAR; RACK 5
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
NIIN: 12-390-8935
PN: 213731
ITEM: ION EXCHANGE COMPOUND (CANISTER)
CAGE: 7XTL4
REPAIR FACILITY: SOLWAVE
QTY PER HULL: 1
ESTIMATED REPAIR LEAD TIME: 1 MONTH
DI-IONIZING TANK NEEDS TO BE RE-BEDDED QUARTERLY ONCE DEPLOYED. REBUILD
INCULDES SERVICE INSPECTION OF THE TANK AND ASSEMBLIES INSIDE & OUT, REMOVAL
AND DISPOSAL OF EXISTING GLYCOL/WATER MIXTURE, REMOVAL AND DISPOSAL OF RESIN,
INSTALLATION OF NEW RESIN, REASSEMBLY AND RETURN GROUND FREIGHT.
REPAIR REQUIREMENTS: REFER TO REPAIR SPECS DOCUMENT; A COPY WILL BE PROVIDED
TO THE OEM BY THE KS / KO
PACKAGING SPECS:
1.) REFERENCE MIL-STD-20731E DOC; METHOD 10. PACKAGING SHOULD BE APPROPRIATE
TO PART SIZE, WEIGHT, AND MUST WITHSTAND MULTIPLE WORLDWIDE SHIPMENTS IN
VARIOUS SHIPPING CONDITIONS / CLIMATES. PART MUST BE APPROPRIATELY SECURED,
AND CUSHIONED BY FOAM OR BUBBLE WRAP TO PREVENT EXCESSIVE MOVEMENT AND DAMAGE
DURING SHIPPING.
1.A) ELECTROSTATIC DISCHARGE (ESD) ITEMS TO COMPLY WITH METHOD 41,
PARAGRAPH3.7, 5.2.4.1 & TABLE J-IA IAW MIL-PRF-81705E **ONLY IF** APPLICABLE
TO PART
2.) INDIVIDUALLY PACKAGED AND LABELED IAW MIL-STD-129P CH.4, REQUIRED ID
MARKING EX: PAR 4.1 FIGURE 1, MARKINGS SHALL COMPLY WITH PACK TYPE /
MATERIALS AS REFERENCED IN DOCUMENT.LABELS: IAW MIL-STD-129P W/ CHANGE 4, PAR
4.1 IDENTIFICATION MARKINGS(PG.21).
2.A) VISIBLY MARK / LABEL ALL ELECTRONIC EQUIPMENT WITH "STORE INDOORS
ONLY"WARNING. ITEMS THAT ARE NOT INDIVIDUALLY PACKAGED, AND / OR LABELED WITH
THEREQUIRED FORMAT WILL BE RETUREND TO THE VENDOR FOR REPACKAGING.
END USE: WMSL TRS-3D RADAR; RACK 5
TECH / KS / KO INFO:
REPAIRS ARE FIX FIRM PRICE THROUGH SOL WAVE, HOWEVER THERE MAY BE EXTRA
CHARGES DUE TO UNKNOWN ISSUES WITH DAMAGED OR MISSING PARTS.
SHELF LIFE CD 0
NIIN: 12-390-8935
PN: 213731
ITEM: ION EXCHANGE COMPOUND (CANISTER)
CAGE: 7XTL4
REPAIR FACILITY: SOLWAVE
QTY PER HULL: 1
ESTIMATED REPAIR LEAD TIME: 1 MONTH
DI-IONIZING TANK NEEDS TO BE RE-BEDDED QUARTERLY ONCE DEPLOYED. REBUILD
INCULDES SERVICE INSPECTION OF THE TANK AND ASSEMBLIES INSIDE & OUT, REMOVAL
AND DISPOSAL OF EXISTING GLYCOL/WATER MIXTURE, REMOVAL AND DISPOSAL OF RESIN,
INSTALLATION OF NEW RESIN, REASSEMBLY AND RETURN GROUND FREIGHT.
REPAIR REQUIREMENTS: REFER TO REPAIR SPECS DOCUMENT; A COPY WILL BE PROVIDED
TO THE OEM BY THE KS / KO
PACKAGING SPECS:
1.) REFERENCE MIL-STD-20731E DOC; METHOD 10. PACKAGING SHOULD BE APPROPRIATE
TO PART SIZE, WEIGHT, AND MUST WITHSTAND MULTIPLE WORLDWIDE SHIPMENTS IN
VARIOUS SHIPPING CONDITIONS / CLIMATES. PART MUST BE APPROPRIATELY SECURED,
AND CUSHIONED BY FOAM OR BUBBLE WRAP TO PREVENT EXCESSIVE MOVEMENT AND DAMAGE
DURING SHIPPING.
1.A) ELECTROSTATIC DISCHARGE (ESD) ITEMS TO COMPLY WITH METHOD 41,
PARAGRAPH3.7, 5.2.4.1 & TABLE J-IA IAW MIL-PRF-81705E **ONLY IF** APPLICABLE
TO PART
2.) INDIVIDUALLY PACKAGED AND LABELED IAW MIL-STD-129P CH.4, REQUIRED ID
MARKING EX: PAR 4.1 FIGURE 1, MARKINGS SHALL COMPLY WITH PACK TYPE /
MATERIALS AS REFERENCED IN DOCUMENT.LABELS: IAW MIL-STD-129P W/ CHANGE 4, PAR
4.1 IDENTIFICATION MARKINGS(PG.21).
2.A) VISIBLY MARK / LABEL ALL ELECTRONIC EQUIPMENT WITH "STORE INDOORS
ONLY"WARNING. ITEMS THAT ARE NOT INDIVIDUALLY PACKAGED, AND / OR LABELED WITH
THEREQUIRED FORMAT WILL BE RETUREND TO THE VENDOR FOR REPACKAGING.
END USE: WMSL TRS-3D RADAR; RACK 5
TECH / KS / KO INFO:
REPAIRS ARE FIX FIRM PRICE THROUGH SOL WAVE, HOWEVER THERE MAY BE EXTRA
CHARGES DUE TO UNKNOWN ISSUES WITH DAMAGED OR MISSING PARTS.
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
OVERHAUL DESCRIPTION
PACKAGING AND MARKING FOR SHIPMENT:
X
A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
6810-12-390-8935
ION EXCHANGE COMPOUND
213731
PRESERVATION / PACKAGING:
A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
X B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"