OPERATIONS_SECURITY_(OPSEC)_QUESTIONNAIRE.pdf
PDF 191 KB Posted
- Attached to
- Disposal of concrete blocks Federal contract opportunity
- Solicitation number
- N32253-22-Q-0069
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers 2.pdf | ||
| Questions and Answers.pdf | ||
| APPENDIX II Enviromental 16 Oct 19.pdf | ||
| PWS DISPOSAL OF CIF Shield Blocks.pdf | ||
| APPENDIX I SAFETY 08 July 21.pdf | ||
| APPENDIX III CIA June 21.pdf | ||
| N32253-22-Q-0069 Disposal of Concrete Blocks.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI (when filled in)
Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility Tracking Number
Operations Security (OPSEC)
Assessment Questionnaire for Contracts v - .22 • .3 Completing this form will help determine if the contractor could be exposed to, use, or produce, U.S.
Government critical information (Cl), and determine if the contract needs an OP SEC plan.
la. NAME OF PHNSY&IMF REQUIRING ACTIVITY REPRESENTATIVE lb. CODE i le. PHONE OR IP EXTENSION Stacie Young Smith 987 x5445
2. SELECT REQUESTING CONTRACT TYPE - CLASSIFIED CONTRACT UNCLASSIFIED CONTRACT
EXISTING or EXTENDING CONTRACT - YES NO IF YES, PLACE PREVIOUS TRACKING NUMBER HERE
3a. NAME OF ASSIGNED CONTRACT REPRESENTATIVE 3b. EMAIL ADDRESS
Jeffrey Philipp jeffrey.philipp@navy.mil
4. NAME OF CONTRACTING OFFICE OR GOVERNMENT CONTRACTING ACTIVITY (GCA)
Pearl Harbor Naval Shipyard IZJ NAVFAC Other GCA
3c. PHONE or IP EXTENSION NO
5. TODAY'S DATE 3/7/2022 6. PERFORMANCE START DATE 7. PERFORMANCE END DATE
App lic abi lity and DoD Requirement
This form is only completed by Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY&IMF) (UIC
32253) requiring activity representative requesting contract work on board PHNSY&IMF. When submitting a requirement for a contract, this questionnaire shall be completed prior to solicitation or sole source award by the requirement activity representative, with the assistance from the assigned contracting representative or Government Contracting Activity
(GCA).
The requiring activity representative, assigned contracting representative or GCA must work with the PHNSY&IMF OPSEC
PM to identify the scope of work to be performed and determine security provisions for Critical Information (Cl) if disclosed in the Statement of Work (SOW), Request for Proposal (RFP) or Performance Work Statement (PWS).
Before the contracting representative submits to the supporting contracting company, the OPSEC PM is required to conduct an OPSEC review of the SOW, RFP or PWS prior to the release to contract bidders. As a publicly released document, the SOW, RFP or PWS may reveal Cl or indicators of Cl.
What is an OPSEC Security Plan?
An OPSEC Plan is used to identify and monitor a contractor's OPSEC activities during the performance of a contract. It is intended to be a living document that will require periodic updates throughout the life of the contract. The OPSEC plan;
(l)Describes the OPSEC environment to include identification of Cl, the OPSEC threat and vulnerabilities an adversary might exploit to acquire Cl, (2) Documents the OPSEC risk analysis, (3) Identifies proposed and actual OPSEC measures,(4)Defines and assigns specific OPSEC responsibilities and ties the OPSEC Plan to the contractor's corporate
OPSEC Program, and (5) Serves as a repository of the OPSEC history of the contract.
If an OPSEC plan is determined, the requirement activity representative, assigned contract representative or GCA will forward the PHNSY&IMF's OPSEC Plan to the potential awardee by encrypted email, through Department of Defense Safe
(DoD Safe) Secure Access File Exchange (https://safe.apps.mil). After award but prior to availability start date, the OPSEC plan must be signed by the Prime contractor and forwarded back to the assigned contracting official or the requirement activity representative by encrypted email. In other cases, the contractor may only simply be required to receive the basic
OPSEC contract requirements, which means no OPSEC Plan is required.
Controlled by: DoN, PHNSY&IMF
Controlled by: Code 1122, OPSEC Program M anager
CUI Category: OPSEC
LDC: DL ONLY
POC: Angelo McDuffie, 808-473-8000 ext.3327
Ass essment Questionnaire for Contracts
CUI (when filled in)
| Controlled by DoN PHNSYIMF Controlled by Code 1122 OPSEC Program Manager CUI Category OPSEC LDC DLONLY POC Angelo McDuffie 8084738000 ext3327: |
| Assessment Questionnaire for Contracts: |
| CUI when filled in: |
| 1 contract solicitation and the resulting contracts in sufficient detail to ensure complete contractor understanding of all: |
| Assessment Questionnaire: |
| LJ: |
| undefined: |
| undefined_2: |
| Examples are but not limited classified materials sub safe equipment computer parts etc: |
| 0: |
| undefined_3: |
| Add comments or any other additional procurement job work that needs protecting not addressedRow1: |
| Assessment Questionnaire for Contracts cont: |
| Assessment Questionnaire for Contracts_2: |
| Defense Federal Acquisition Regulation Supplement DFARS Clauses: |
| Please include the DFARS clauses for all service support contracts that are appropriate: |
| Location of Work Mark N A if it does not apply: |
| na: |
| na_2: |
| na_3: |
| Contractors involved with CUI in pursuant to contractual requirements must: |
| Certification and Concurrence: |
| Date: |
| Assessment Questionnaire for Contracts_3: |
| Text1: 6/1/2022 |
| Text2: 12/16/2022 |
File details come from the government source that posted it. Updated .