OMA Paint SOW 2020.pdf

PDF 6 MB Posted

Attached to
Installation Paint Requirements Fort Leavenworth DPW
Solicitation number
W91QF4-20-B-0003
Issued by

View the file

Other files

File Type Posted
Sol_Amend-01_Paint Requirement_W91QF4-20-B-0003.pdf PDF
17-architectural.pdf PDF
CONS_WD_KS20200053_dtd_5-15-2020.pdf PDF
45-wooden-porche.pdf PDF
47-Maintaining-Exterior.pdf PDF
OMA Paint Bid_Sheet_Req_20-B-0003.xlsx XLSX spreadsheet
Submittal Register.pdf PDF
10-paint-problem.pdf PDF
SOL_Paint_20-B-0003 BetaSAM.pdf PDF
37-lead-paint-hazard.pdf PDF
OMA Paint Specs 2020.doc.pdf PDF
9-wooden-windows.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

OPERATIONS & MAINTAINENCE ARMY EXTERIOR PAINT AND REPAIRS TO OMA BUILDINGS

PROJECT # M 0007348

FORT LEAVENWORTH, KANSAS

24 January 2019

SW-1 DESCRIPTION OF WORK

1) Work to be Done: The work to be done consists of furnishing all plant, labor, equipment, and materials as well as performing all work in strict accordance with the plans and specifications for Operations & Maintenance Army (OMA) Exterior Paint and Repairs, at Fort Leavenworth, Kansas. All work performed by the Contractor shall result in a complete and functional system.

SW-2 PRINCIPAL FEATURES.

The project is to repair and paint various OMA buildings throughout Fort Leavenworth, Kansas. Paint all previously and minor repairs to interior surfaces. Prime and paint all previously painted and new replacement items and exterior surfaces to include, but not limited to:

1) There are approximately 140 buildings that fall under this project. This number could vary as buildings are constructed or demolished. Building size varies dramatically from building no. 45 a three story masonry building with wood porches and trim, to building

no. 814 a 4’ X 4’ X 8’ trap house at Brunner Skeet Range. There are approximately 19 buildings with wood porches 10 of those have wood handrails and spindles.

2) Exterior wood items: facias, soffits, frieze boards, wrap boards, pilaster/column, pilaster/column cap or cap boards, balustrade, wood windows & frames, porches (and their components), steps, and handrails.

3) Exterior metal items: gutters & down spouts, doors, door frames, column bases, louvers, standing seam roofs, flashing, exterior piping, conduit, electrical panel boxes, balustrade, railing, security screen/bars, & lintels.

4) Concrete items: previously painted window & door sills, column bases, foundation and foundation caps, and lintels.

5) Replace damaged window putty around glass panes and caulk.

6) Repair or replace all deteriorated or damaged exterior wood and metal items and surfaces, as ordered by the Government Representative. Building components to be repaired or replaced include, but is not limited to, exterior wood items (dimensional lumber, hardboard, millwork, trim, columns, etc.), glass & glazing, gutters, down spouts.

1) All buildings will be occupied during construction.

2) Some of the existing paint contains lead. Lead-based paint is to be handled as described in the attached specification 02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH

LEAD.

SW-3 APPROVAL OF MATERIALS AND EQUIPMENT

a. Within 10 calendar days of receipt of Notice to Proceed, and before installation, the Contractor shall submit for approval all items listed or specified on attached SUBMITTAL REGISTER in the specifications. The government has 10 days to review and return submittals once they are received. If the Contractor submits an item for reapproval, the Government has 10 days to review and return once it is received. It is acceptable for Contractor to bring submittals to the pre-construction conference to expedite work. The submittals shall be mailed or carried directly to the addressee shown below, as directed.

Submittals shall be made on TRADOC Form 928-R.

MICC – DOC Leavenworth 535 Kearney Ave Fort Leavenworth, KS 66027

b. Submittal procedures are contained in Section 013300, SUBMITTAL PROCEDURES. Specific submittal requirements are contained in each section of the technical specifications. Submittals required by the CONTRACT CLAUSES and other non-technical parts of the contract are not included in this section. The Contractor shall submit three (3) copies of each required submittal. Only one (1) transmittal form shall be provided with each set of submittals. See attachment 4, Submittal Register for list of submittals requested for this project.

c. The Contractor shall submit an Accident Prevention Plan prior to start of work. Material Safety Data Sheets shall be provided when hazardous chemicals are used. The Accident Prevention Plan shall be prepared in accordance with the required and advisory provisions of COE EM-385-1-1 including Appendix A, "Minimum Basic Outline for Preparation of Accident Prevention Plan." The Safety Plan shall be prepared as required by 29 CFR 1910.120 and COE EM-385-1-1.

d. The Government Representative may request submittals in addition to those listed when deemed necessary to adequately describe the work covered in this section.

SW-4 GENERAL INFORMATION

a. General: The Contractor shall make every effort to avoid damage to vegetation, buildings and private and personal property. When work cannot proceed without damage, it shall be brought to the attention of the Government Representative. Anything, damaged by the Contractor’s negligence shall be restored to original condition without additional cost to the Government.

b. Debris and Rubbish: The Contractor shall leave the work site clean and free of debris when the workday ends. The Contractor shall dispose of all debris and rubbish in an off-post site at no additional cost to the Government. The Government landfill, dumpsters or containers shall not be used for property disposal. All waste shall be disposed of in accordance with applicable Federal, State, and local laws.

c. Normal Working Hours: The Contractor shall schedule his working hours to coincide with the working hours of the military reservation, 7:30 a.m. to 4:00 p.m., a normal 5-day, 40-hour week, Monday through Friday, excluding legal holidays (January 1st, third Monday of January, third Monday of February, last Monday of May, July 4th, first Monday of September, second Monday of October, November 11th, fourth Thursday of November, and December 25th). The Contractor shall not perform work on the reservation during other than workdays nor during other than work hours without written approval of the Government Representative. If the holiday falls on a Saturday, it is observed on the preceding Friday. If the holiday falls on a Sunday, it is observed on the following Monday.

d. Workmanship: All work shall be accomplished by mechanics skilled in the trade involved.

Workmanship shall be equal to the best practices common to the trade and shall be governed by the National Electrical Code (NEC), and International Building Code (IBC). Workmanship shall meet or exceed the standards as set forth in the Fort Leavenworth "Quality Workmanship Standards."

e. Scrap and Salvageable Materials: Right and control of scrap and salvageable material generated from Government owned facilities by this contract is retained by the Contractor. All scrap and salvaged material retained by the Contractor shall be removed from the Post daily at the Contractor’s expense.

f. Sustainable Management of Waste: In accordance with ACSIM Memorandum dated 06 FEB 06, Subject: Sustainable Management of Waste in Military Construction, Renovation and Demolition Activities, the contractor shall, at his own expense, ensure that 50% of the demolition or deconstruction material or construction waste is diverted from landfill disposal. This may be accomplished through recycling, reuse of material (such as crushed concrete or asphalt), diversion (material which may be used on a future project) or waste minimization (accurate planning and ordering, proper material storage and handling, right-sizing). A consolidated report outlining the amounts of diverted and disposed waste resulting in the 50% diversion shall be provided to the Directorate of Logistics/Directorate of Public Works Environmental Division. All waste reduction measures must be in full with compliance of federal, state and local regulations and in full compliance with material specifications. All measures involving storage of material on the installation or future use of the material by the installation must be coordinated in advance with the Directorate of Logistics/Directorate of Public Works.

SW-5 SAFETY REQUIREMENTS

a. All Contractors and their employees working on the confines of the Combined Arms Center and Fort Leavenworth (CAC&FL) will be required to abide by the safety standards outlined in:

(1) The Occupational Safety and Health Standards (29 CFR 1910) - General Industry.

1910.1200 Hazardous Communication

(2) The Occupational Safety and Health Standards (29 CFR 1926) - Construction Industry, to include, but is not limited to the following:

1926.62 Lead

1926.65 Hazardous Waste Operations Emergency Response

1926.451 Scaffolding

1926.500-503 Fall Protection

1926.1101 Asbestos

(3) The American National Standards Institute (ANSI) which applies to the task(s) being performed.

(4) The National Electric Code.

(5) The National Fire Protection Association (NFPA) 101 Life Safety Code.

(6) Department of the Army Regulation 385-10, The Army Safety Program.

(7) Department of the Army Regulation 385-40, Accident Reporting and Records.

(8) The US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.

(9) CAC & FT LVN 385-1. CAC Safety Program.

b. Contractors found performing unsafe acts or creating unsafe conditions may be subject to a work stoppage until the deficiencies are corrected. A work stoppage due to unsafe acts or conditions will not constitute an adjustment to the contract.

c. The contractor shall submit a safety plan according to DA PAM 385-10 Chapter 4 Para 4-4 which call for a site specific safety plan with focus on paragraph c. (1) thru (17), d. Contractor disciplinary process, e.

Contracting Officers representative requirements, f. Hazard analysis and g. Hazard analysis briefs by supervision driving tool box meetings and throughout as work progress. The strength of this paragraph is derived by the backing of Federal Acquisition Regulation (FAR) Clause 52.

SW-6 INTERRUPTION OF UTILITY SERVICES

All interruptions to electrical, water or other utilities must be coordinated with the Contracting Officer. The Contractor shall notify the Contracting Office seven (7) days prior to the disruption of utility services.

Unanticipated interruptions of utilities will be reported to the Contracting Officer immediately.

a. The Contractor is responsible for checking and locating all the utilities in the field before construction.

The cost of all these checks shall be included in each bid item. The Contractor may use utilities locator equipment or may hire a subcontractor to locate all the utilities for him. The Contractor shall furnish all labor, supervision, tools equipment, and transportation as required to locate and mark utilities for the Fort Leavenworth owned utilities excluding fiber/telephone and communications. The Contractor will be given access to the Fort Leavenworth DPW (Directorate of Public Works) utility drawings to aid in locating storm sewer and natural gas. Water lines and Sanitary Sewer line are owned by American Water. Electric power distribution lines are owned by Leavenworth Jefferson Electric Co. The utilities that are of nonconductive construction such as plastic, or Transite and have no tracer wire or other means of applying a signal are to be located from the utility maps. The utilities that are located from maps that appear to be in the vicinity of the excavation are to be hand dug for location purposes. If a line is damaged, that is within 10 feet of that shown on the utility maps; the Contractor will be held responsible for its repair.

b. The Contractor shall contact Kansas One-Call for utility checks for Southern Star Central Gas Pipeline, Sprint, Southwestern Bell, Time Warner Cable, American Water, and Leavenworth Jefferson Electric.

c. The Fort Leavenworth telephone and communication lines are responsibility of the Network Enterprise Center (NEC) and will be located by Fort Leavenworth personnel. The Contractor shall visit the sites and mark his proposed route or limits to his excavation on a map and take this marked up map to Directorate of Public Works (DPW) Help Desk before any excavation. NECOM will mark lines in the field within 10 working days, after which the Contractor shall proceed with actual excavation. If the Contractor damages any marked lines during excavation the Contractor shall contact DPW Inspector immediately to determine if the post will repair the line with the Contractor reimbursing the Government for repairs, or if the Contractor will be required to repair the lines.

d. After all utility locations or existence of any utility for the site are completed, the Contractor shall provide a copy of the summary to the Inspector for his review prior to the start of any excavation as a daily report.

SW-7 GUIDELINES FOR WORKING ON HISTORIC BUILDINGS

As a Federal Agency, the Army is required to comply with the Secretary of the Interior’s Standard Guidelines, https://www.nps.gov/tps/standards.htm, as specified by the National Historic Preservation Act (NHPA) of 1966, for Federal undertakings on any building eligible for inclusion in the National Register of Historic Places (NRHP). The contractor will be responsible to ensure that the proposed work meets the requirements of the Secretary of the Interior’s Standards for Rehabilitation of Historic Buildings.

Reference Attachment 11 for the boundary of the Historic District. Reference Attachments 5 thru 10 for the National Park Service Technical Preservation Briefs at http://www.nps.gov/tps/how-to-preserve/briefs.htm. Consult with Fort Leavenworth’s Cultural Resource Manager (CRM), Elisabeth Jackson at (913) 684-8940 for any questions regarding work on Historic Buildings.

SW-8 MEASUREMENT OF WORK AREAS

a. This is to establish a base procedure for measuring the areas to be painted or repaired.

(1) Trim items will be measured to the nearest three inches in total width times the lineal feet.

Example a trim piece with six sides of 3” + 8” + 4” + 8” + 3” + 5” and 40 feet in length is 2.5’ X 40 = 100 square feet.

(2) Windows shall be measured in square feet width times the height from jamb to jamb and sill to head. Example a four foot three inch by six foot window shall be measured as 4’ X 6’ = 24 square feet and includes all mullions, ledges and all items of a window.

(3) Surfaces areas such as siding shall be measured in square feet the width times the height and include all ridges and seams on items such as lap siding. Example an exterior wall ten feet high by forty feet six inches wide shall be measured as 10’ X 40.5’ = 405 square feet.

(4) Closely fabricated items, such as lattice work, open web joists and grating, should be measured as solid. If both sides of an item are finished double the surface area.

(5) When a small opening interrupts a continuous surface, the opening is disregarded and considered part of the continuous surface. Any openings extending from floor to ceiling and exceeding two feet in width shall be deducted. All openings 20 square feet or larger are deducted.

SW-9 CONSTRUCTION PROJECT SIGNAGE

Contractor shall provide all necessary signage to notify Installation personnel of construction. If during construction signage is damaged due to weather, it will be the contractor’s responsibility to replace. Signage shall be 5’ x 3’. Signage size may change depending on project and proposed location. Size changes must be requested through the contracting officer. Signage shall be installed at a minimum 1 week prior to start of construction. If signage is to be placed in the ground, plan ahead for utility locates through Kansas One-Call. If possible, install signage on existing structures. Exact verbiage for the signage shall be approved by the contracting officer prior to installation. All text shall be black and at an appropriate size in proportion to the individual signs. The following are items required as a minimum to be included on the signage:

Basic title Purpose of project General time frame of project, i.e. spring 2014 Use phrases such as: Pardon our dust, thanks for your patience, or Watch for construction equipment when appropriate to the project. If relevant to the project, a picture shall be used to convey the project to the public. DPW can assist with providing an appropriate image for the signage.

SW-10 RATE OF WORK PERFORMANCE

a. The completion time for each building may be adjusted by mutual agreement of the Government and the Contractor.

b. Liquidated damages for each day of delay, as set out at contract clause 52.211-12 - LIQUIDATED DAMAGES—CONSTRUCTION, apply to work not completed within the time specified in individual task orders.

SW-11 TASK ORDER EXAMPLES

TASK ORDER EXAMPLE TO REPAIR AND PAINT ON BUILDING 000.

1. STATEMENT OF WORK: REMOVE AND INSTALL 50 NEW TURNED SPINDLES AND NEW

TOP HANDRAILS (50 LF) FOR BUILDING 000

2. Line items to use (see price schedule for actual line item numbers and costs)

a. 0001AA 03; New Top Handrail, 50 LF x $15.50 = $775.00

b. 0001AA 15; New Turned Spindle, 50 EA x $20.80 = $1040.00

c. 0001AA 49; Paint Spindles, 50 SF x $2.00 = $100.00

d. 0001AA 51; Paint Handrails, 50 SF x $2.00 = $100.00

3. Total for all line items, $2015.00.

SW-12 GENERAL NOTES

1. Exterior painting costs shown reflect removing dirt. Loosing surface matter to a sound paintable surface, masking of light fixtures, sign or other items not to receive paint. Removal and disposal of lead containing paint and lead based paint protective measures (per section 028233.13 20 Removal/Control and Disposal of Paint with Lead). Waste disposal without lead, cleanup and painting of all previously painted surfaces such as but not inclusive: handrails, decking, wood siding, metal siding, ceilings, spindles, stair components, masonry surfaces, exterior steel stairs, windows, doors, misc. trim, fascia, soffits, gutters, downspouts, and metal roofing.

2. Line item costs such as fascia, soffits, hand rails, trim, and lap siding reflect repairing the damaged area such as but not inclusive; removal of damaged area, disposal of debris, installation of new material, and cleanup.

3. Cost for concrete repair reflect repairing concrete footings/columns, concrete steps, and landings such as but not inclusive; removal of damaged area, disposal of debris, installation of new material, and cleanup.

4. Cost for masonry repair reflect repairing masonry columns, and walls such as but not inclusive;

removal of damaged area, disposal of debris, installation of new masonry, and cleanup.

5. Cost for glass repair reflect replacing broken glass panes such as but not inclusive; removal of broken panes, disposal of debris, installation of new glass panes, glazing, and cleanup.

6. Line item cost listed under “Porch Repair” shall reflect demolition, waste removal, painting, cleanup and replacement with like materials and/or as specified.

7. All waste removal items shall be defined as removed from work site and disposed in an approved landfill.

8. When the porch deck demolition has been completed, the Contractor shall square the porch structure making adjustments as necessary.

9. Removal of paint from brick shall include all layers of paint down to brick surface.

SW-13 PHOTO’S OF EXTERIOR PAINT EXAMPLES:

Building No. 61 415 McPherson Ave.

Building No. 320 410 McPherson Ave.

Building No. 45 410 Kearney Ave.

Building No. 61 415 McPherson Ave.

Building No. 224 740 W. Warehouse Road

Building No. 318 350 Biddle Blvd.

Building No. 80

810 McClellan Ave.

Building No. 198 600 Thomas Ave.

Quality Workmanship

Standards on Fort Leavenworth, Kansas

Historic Buildings

Table of Contents

Purpose of the Standards

Introduction. How the Standards Work

Section I. Quality Woodworking Standards

Acceptable Practices

Unacceptable Practices

Section II. Quality Masonry Standards

Acceptable Practices

Unacceptable Practices

Conclusion

Purpose of the

Standards

1. To provide a clear, visual standard to contractors, DPW and COE inspectors on all woodworking and masonry projects on Historic Buildings at Fort Leavenworth, Kansas.

2. By providing a standard, each worker and inspector can understand what level of quality is expected before the project begins.

3. During the construction phase, the inspector(s) will use the standard as a visual guide for identifying acceptable and unacceptable workmanship. Therefore, it also becomes a continuous training tool for contractor(s) and inspector(s).

4. Increasing the level of quality produces:

A longer-lasting product

A work of craftsmanship

A savings of repair and replacement dollars

Introduction How the Standards Work

To Contractors and Inspectors:

These standards shall be the guide for all work and inspections on historic buildings at Fort Leavenworth, Kansas.

Historic buildings require strict construction practices and a high degree of quality work.

By not following these standards and/or identified by the Government Representative or representative, will require the contractor to remove the unacceptable work and replace it, at contractor's cost, with the acceptable, quality craftsmanship described in these standards.

These standards will help the contractor and the inspector to clearly identify acceptable craftsmanship, as well as, poor workmanship on historic projects. Following these acceptable practices preserves the existing historical material, prolongs the life of a new repair and restoration work, delivers a higher quality product that will last, and save future funding dollars.

Section I Quality Woodworking Standards

Section I. Quality Woodworking Standards

Acceptable Practices

Areas of Concern: Wood Repair and Restoration

Miter Joints

Railings/Flooring

Edge Joints

Special Cuts

Coping Trim

Unacceptable Practices

Working with Original Historic Materials

Poor Wood Cutting Techniques

Poor Joinery Techniques

Substandard Wood Quality

Poor Wood Member Attachments

Painting/Clean-Up

Conclusion

This is the first ever comprehensive standard to visually, as well as descriptively, describe acceptable practices in renovation and building repair on historic military structures.

These standards will initially be applied as guidelines to allow design, construction, and inspection to utilize and adapt to them - and to provide valuable feedback for further development.

Areas of Concern: Wood Repair and Restoration Quality Assurance

Under Architectural Woodworking Institute (AWI) Requirements, all finished work shall be Custom Grade.

Original Historic Materials:

Match existing historic design of materials or use historic drawings.

Follow the way the individual wood members are cut and designed.

Wood Cutting Techniques:

Paint all end cuts with oil based primer - DO NOT THIN OUT!

Cuts shall be clean, with no rough edges, sanded smooth, mounted flush, with no gaps to the attaching surface.

Caulking shall be used as an exception, rather than the rule and shall not be used to cover poor woodcuts and poor joint fits.

Molding Matches.

Eliminate multiple molding cuts, use one piece.

Joinery Techniques:

Miter Cuts: A maximum tolerance of 1/32" space between members, such as miter cuts, and member to member attachment.

Joint Fitting Criteria

Wood Quality

Dryness 12 - 15%

Decision to Use or Not to Use

Defects Use/Fix Criteria

Block Sanding Methods:

Sanding shall follow the wood grain, unless you just want to remove a lot of material in the "roughing" stage.

If you are doing something long, like a leading edge, be sure to start at one end with part of the block off the workpiece and move the entire length of the workpiece. A very common mistake on a leading edge is to do shorter strokes spending more time on the center portion and then ending up with a curved leading edge. To avoid this, do long end-to-end strokes and stop frequently to make sure it's still straight.

Visual - Use only clean, smooth face materials that are exposed to the visual so that it does not detract from the beauty of the construction.

Sanding requirements: Before panting over an existing painted or primed surface, sand with a light 150 grit sandpaper, blow or wipe off dust residue, then paint.

Structural Requirements/

Acceptable Woodworking Practices - Exterior

Solutions to Defects - Glue, with clamps, Bracing, Plates, Epoxy.

Wood Member Attachments

Nails - Use galvanized nails for exterior work only.

Set nails below the surface of the wood to receive filler putty, let dry, then sand the wood surface smooth for a clean finish, then prime and paint. Screws and Bolts - Use lag bolts and washers where there may be structural concerns.

Use Detailing from DPW

The DPW will supply details for porch elements where there are several kinds of unmatching wood trim, columns, bases, spindles, and railings.

Paint Clean-up

Preventive - The contractor shall take measures to ensure protection of areas not to be painted. Examples are adjacent brick, stone, other painted areas, sidewalks, and metal elements.

Clean up mistakes - If the contractor allows new paint to drop on adjacent brick, stone, other painted areas, sidewalks, or metal elements, it shall be cleaned completely with no paint residue showing.

Caulking Cracks - Criteria

If there is more than 1/32" space between members, such as miter cuts, member to member attachment, it will be the responsibility of the contractor to remove the member(s), re-cut a new member, and tighten the joint spacing.

Use elastomeric, expanding type caulking.

Inspection Process

Daily, Weekly, Unannounced.

Use different times. Do not use the same schedule of Inspection. Don't be predictable.

Be consistent with accepting quality work; encourage the contractor when work is done with quality.

Be consistent with rejecting.

Woodwork & Trim

Ensure exact profiles and original materials when replacing and rebuilding molding profiles, siding profiles, balusters and ornamental trim.

Documentation of original or similar style/date building should be provided for any design change or missing ornamentation; Victoria's Heritage Advisory Committee must approve design changes.

There are few heritage buildings on which plywood is historically accurate; most old porches were fir floored with bull-nosed edges and stair treads; such materials are still commonly available.

All woodwork must be primed on all sides at time of installation; be sure your quote includes both priming and finishing paint, and installation.

Windows

All windows will be operational after painting even if the window was not operational before painting.

Windows with bars if the bars cannot be removed the contractor will paint through the bars and because of extra labor to do this given the cost to remove and replace the security bars.

Miter Joints

Standard

The first requirement of a good miter joint is that the two mating surfaces must fit together perfectly. This means there are no discernible gaps. For edge joining, the mating surfaces must be flat and square to both faces of the board. Nails should be recessed for caulking.

Drawing Notes

Horizontal and vertical cuts. Members fit tight, no gaps or uneven cuts.

Good miter cuts have no need for caulking. Joints are clean, no gaps, no inaccurate cutting.

Edges should be sharp and level

Nails should recess deep enough to receive exterior caulking.

Nails are recessed and puttied, dried, then sanded.

Miter Cut is clean, tight, and requires no caulking.

Standard

The first requirement of a good edge joint is that the two mating surfaces must fit together perfectly. This means there are no discernible gaps. For edge joining, the mating surfaces must be flat and square to both faces of the board.

Drawing Notes

Horizontal and vertical cuts. Members fit tight, no gaps or uneven cuts.

Miter cuts have no need for caulking.

Joints are clean, no gaps, no inaccurate cutting. Both pieces fit within 1/32" tolerance

Edges should be sharp and level, no filler required.

Photo Notes

Horizontal and vertical cuts. Members fit tight, no gaps or uneven cuts.

Miter cuts have no need for caulking.

Joints are clean, no gaps, no inaccurate cutting. Both pieces fit within 1/32" tolerance

Edges should be sharp and level, no filler required.

Should have a full coverage of the required paint coatings.

Photo Notes

Structural boards are flush and cut evenly.

Miter cuts are clean with no inaccurate cutting.

Edges should be sharp and level

Railings

Spindles

Building No. 44 - Size 3 ½” square by 19” tall

Building No. 58 – Size 2 ½” square by 22” tall

Railings/Flooring

Edge Joints Standard

The first requirement of a good edge joint is that the two mating surfaces must fit together perfectly. This means there are no discernible gaps. For edge joining, the mating surfaces must be flat and square to both faces of the board.

Drawing Notes

Horizontal and vertical cuts. Members fit tight, no gaps or uneven cuts.

Edges should be sharp and level.

Special Cuts Standard

The two mating surfaces must fit together perfectly. This means there are no discernible gaps. For edge joining, the mating surfaces must be flat and square to both faces of the board. Nails should be recessed for caulking.

Note: All end cuts shall be primed before joined together.

Drawing Notes

Members fit tight, no gaps or uneven cuts.

Joints are clean, no gaps, no inaccurate cutting

Edges should be sharp and level.

Coping Trim Standard

The first piece is butted to the wall. The second piece is mitered as for an inside corner, but the mitered end is cut off where it meets the molding face, leaving a negative profile that fits over the butted piece tightly.

Drawing Notes

Members fit tight, no gaps or uneven cuts.

Good coping cuts have no need for caulking. Joints are clean, no gaps, no inaccurate cutting.

Edges should be sharp and level.

The coped edge should conform to the shape of the other piece with no gaps.

Top Rail Standard

The first piece is butted to the wall. The second piece is mitered as for an inside corner, but the mitered end is cut off where it meets the molding face, leaving a negative profile that fits over the butted piece tightly.

Drawing Notes

Horizontal and vertical cuts are at the proper angle to each other. Members fit tight to spindles, no gaps or uneven cuts.

Good top rails have joints that are clean, no gaps, no inaccurate cutting.

Edges should be sharp, parallel, and level.

Nails should recess deep enough to receive exterior caulking.

Surfaces are flat and smooth with no saw cut or hammer marks.

Porch Decking Standard

The first requirement of good decking is the tongue and groove mating surfaces that fit together perfectly. This means there are no discernible gaps. For edge joining, the mating surfaces must be flat and square to both faces of the board. Nails should be deep within the groove to allow a tight fit.

Drawing Notes

Members fit tight, no gaps or uneven cuts.

Joints are clean, no gaps, no inaccurate cutting.

Nails should recess deep enough to receive tongue.

Install bead of caulk length of tongue

Round edge of flooring, seal end using epoxy consolidate. Suggested supplier Abatron

Structural

Standard

Areas under columns required additional support.

Boxed-in areas shall be designed as to distribute the loading of each column on all porches and structural support areas.

Unacceptable Practices

Note to Contractor:

If the Contacting Officer or Representative observes any Unacceptable Woodworking Practice described within this Standard, the Contractor, at his/her own expense, shall replace the member or structural unit or woodworking system to the satisfaction of the Contacting Officer or representative.

All work on Fort Leavenworth shall comply with these Quality Standards.

It takes only a few extra minutes to do a job correctly ...it may take hours to correct a hurried job.

Pieces of wood split off because of a poor section of wood, nail, screw, or bolt protrusion

Pieces of wood that are not placed to form a clean, 90 degree even-edge, but leaves gaps. Meeting wood members should have a tight fit and flush to one another.

When pieces of wood split or pop off, either reattach with a bonding agent or replace entire member, depending on the loss of material. Replace if the structural integrity is compromised.

Unacceptable Woodworking Practices - Exterior

Structural members shall not have broken parts or splitting through members.

Structural members, with this kind of poor wood quality, shall be replaced by contractor.

Unsanded, visual surfaces with wood particles under the paint job.

Unsquare, unleveled, or out of line workmanship on any wood system.

REPLACE entire system to create a square, even look to the work.

Unsquare, unleveled, or out of line workmanship on any wood system shall be REPLACED. New work shall be square, parallel, level, and even.

Uneven Miter Cuts: Miter cuts should not require caulking to complete the work.

Caulking in wide joints will pop out and open the end cuts to moisture penetration.

REPLACE both boards.

Uneven Miter Cuts: Using poor miter cuts that produce wide joints requiring caulking.

REPLACE poorly cut piece(s).

Uneven Miter Cuts: Using poorly sawn miter cuts that require resawing to meet the corner.

REPLACE both boards.

Section II.

Acceptable Masonry Practices

Section I. Quality Masonry Standards

Acceptable Practices

Quality Assurance

Original Historic Brick and Stone Materials

Tuck-pointing Techniques

Matching Brick and Stone

Mortar Application Techniques

Mock-Ups Requirements

Use of Hand Tools/Power Equipment

Mortar Mix Quality

Clean-Up and Finish Work

Unacceptable Practices

Working with Original Historic Materials

Poor Mortar Application Techniques

Poor Mortar Mixing Techniques

Clean-Up and Finish Work

What is Quality Masonry Restoration?

Quality is key to masonry restoration and is defined as a "degree or grade of excellence" according to The American Heritage Dictionary. However, quality is still not clearly defined but we all know it when we see it.

However, with these visual standards, quality can be identified, at least, in regards to masonry restoration. This will help improve the life span of these historic properties.

Tuck-pointing

Tuck-pointing is the re-pointing of the deteriorated mortar joints in an existing masonry wall.

Once mortar joints are ground out to desired depth, we recommend a minimum of 1/2" deep, dust out joints with brush to remove dust particles. Then, rinse joint with water hose to make it dust-free and ensure proper bonding.

Proceed with tuck-pointing and look for the following quality standards:

No air bubbles in mortar in joint

No openings in mortar in joint

Mortar is flush with brick (or as specified)

No mortar is on the face of the brick, that is, smeared

No dust is on edge of brick reducing proper bonding

Allow time for joints to dry. If the mortar turns white and smears the brick, it is too dry. If mortar begins to turn white, misting is needed and color of joint.

When to re-tuck-point

When a lot of mortar falls out and the joint is already a 1/4".

Appearance is poor and you ant to dress it up.

Tuck-point 100% solid when more than 50% of the joints are deteriorated. Recommend using type N mortar.

Patching Masonry

Patching masonry is repairing deteriorated/spalled masonry such as concrete, brick, stone and terra cotta to ensure it being weather-tight and/or to repair the masonry so it looks better and is not a safety hazard.

One product in particular that is superior is Jahn Restoration Mortars manufactured by Cathedral Stone Products, Inc. installed by trained craftspeople that are certified to install Jahn products.

When patching masonry with any material, the applicator will generally follow these steps:

Remove all loose materials in patched area

Square off edges to be patched

Create a minimum of a 1/2" deep for patched area

Dust out area to remove dust and dirt

Apply primer with brush to area

Apply paint/rust inhibitor to exposed rebar

Apply patching material with margin trowel

Apply straight edge to material and smooth out to ensure material is flush with adjacent masonry surfaces

Mist patched area three times a day for three consecutive days

Acceptable Masonry Practices

Look for these performance standards:

Material is flush/even

No dents or holes in patch

No smear on outside of patch

Area is damp

Texture matches existing

Knowing when to patch masonry

Where loose masonry is severely cracking, spalling, rupturing, or popping off.

When you have water damage or leaks inside.

When the appearance is very noticeable.

When the deterioration could cause damage to property and/or persons.

Cleaning Masonry

There are several methods of cleaning masonry. Knowing which method is vital to restoring/preserving existing masonry. Most masonry can be cleaned using only water at varying pressures (psi). However, some form of chemical cleaning and/or sandblasting may be necessary when your masonry has any of the following problems;

deep rust stains, chemical residue, efflorescence, graffiti, paint, and years of neglect. Determine what chemical and psi will cut existing dirt/stains. Always do a sample when chemical cleaning masonry and get data sheets.

Historical Preservation

Do not ever sandblast a historical site unless you do not mind losing its historical heritage and/or recognition.

Always use a low psi between 300-1000 when cleaning masonry on a historical site.

Always use a properly mixed historical mortar consisting of the following:

1. 6 parts sand or matching aggregates

2. 1/5 part Portland cement

3. 2 parts hydrated lime

4. 5 gallons of water or until mortar can be rolled into a ball and provides a thumbprint

Screws and Bolts - Use lag bolts and washers where there may be structural concerns.

Use Detailing from DPW - the DPW will supply details for porch elements where there are several kinds of mismatched wood trim, columns, bases, spindles, and railings.

Stone brick face is free from unwanted mortar and has a clean look and feel.

Mortar joints are clean, smooth, uniform, within the spaces between the stones, and consistent with color. Matching color of existing historic mortar.

Brick is free from unwanted mortar and has a clean look and feel.

Masonry mock-ups are required before starting work. Construct 3' x 5' units. Mortar must be completely dry before inspection and final acceptance before work begins.

Structural members shall not have broken parts or splitting through members.

Unacceptable Practices

Mortar is smeared or left across stone or brick face.

Applying the wrong color of mortar, which should match the existing mortar.

Poor color selection of brick.

Unacceptable Masonry Practices - Brick

Historic Preservation Standards

From the Secretary of the Interior’s Standards for Rehabilitation of Historic Buildings

IDENTIFY, PRESERVE, PROTECT, MAINTAIN, REPAIR, and

REPLACEMENT OF HISTORIC MATERIALS

Required

Identifying, retaining, and preserving wood features that are important in defining the overall historic character of the building such as siding, cornices brackets, window architraves, and doorway pediments;

and their paints, finishes, and colored walls, brackets, railings, cornices, windows architraves, door pediments, steps, and columns and details such as tooling and bonding patterns, coatings, and color.

Protecting and maintaining wood features by providing proper drainage so that water is not allowed to stand on flat, horizontal surfaces or accumulate in decorative features.

Replacing an entire wood feature such as a cornice or wall when repair of the wood and limited replacement of deteriorated or missing parts are appropriate.

Not Allowed

Removing or radically changing wood features which are important in defining the overall historic character of the building so that, as a result, the character is diminished.

R i j ti f th hi t i d f

Not Allowed

Using substitute materials for the replacement part that does not convey the visual appearance of the surviving parts of the wood feature or that is physically or chemically incompatible.

Failing to undertake measures to assure the protection of wood features.

Recommended

Repairing wood features by patching piecing-in

Brick was destroyed by pneumatic tools and wider the space.

Unacceptable Masonry Practices - Brick

Structural

Standard

Areas under columns required additional support.

Boxed-in areas shall be designed as to distribute the loading of each column on all porches and structural support areas.

DIRECTORATE OF PUBLIC WORKS

820 McCLELLAN AVE

FORT LEAVENWORTH, KANSAS 66027

PROJECT TASK ORDER RECONCILIATION FORM

Project Name: _____________________________________________ Project Number: __________________ Task Order number: _______

Signature of Contracting Officer’s Representative Date

Signature of Contractor Date

Continuation Form Line item No.

Description Quantity Cost per Unit

Cost

File details come from the government source that posted it. Updated .