Text version

Table of Contents purpose statement Storage tanks for used oil, and used antifreeze.

BACKGROUND

The maintenance facilities in the COARNG require lifecycle replacement for the used oil and antifreeze tanks on site. These tanks are required per the Environmental Office and are heavily used. The current tanks have lost vacuum, are rusted, and risk creating a spill or environmental incident. Tanks are required per the COARNG Environmental SOP, Colorado Hazardous Material guidance, EPA regulation, and CFR 279.22.

PLACE OF PERFORMANCE

See requirements section.

REQUIREMENTS

Company will gather requirements, develop a quote, ship, and build all equipment.

Site access will be available from Tuesday to Friday from 0630 to 1700 (Mountain).

Three week notice to the government point of contact (POC) prior to delivery is required in order to ensure location access and preparation and to ensure used storage tanks are emptied by the Colorado Army National Guard, prior to the vendor pick-up and disposing of the used storage tanks.

Contractor Responsibilities:

· Sale of specified equipment

· Three weeks prior notice to Government POC prior to delivery of new storage tanks and pick and disposal of old used storage tanks

· Shipping and handling

· Any installation services required to provide fully operational systems.

· Vendor must provide equipment to move the new tanks to their locations. Contractor must also provide equipment to move and transport the old tanks and take them away for disposal. All old tanks are forklift accessible.

· Removal and disposal of existing tanks

Colorado Army National Guard Responsibilities:

· Contact COARNG Environmental Office in order to arrange emptying of storage tanks prior to vendor delivery of new storage tanks and pick-up and disposal of used storage tanks.

Essential Physical Characteristics:

· Impact resistant construction

· Tank built to U.L.C.142

· Vacuum monitored

· Vent pipe

· Lifting lugs welded to tank top

· Product labelling and safety labelling

· Tank gauge

· Vacuum Gauge

· Internal liner

· Inspection dip stick

· Safety labelling

· Two(2) coats of epoxy

· One(1) coat of polyurethane

· New and unused storage tanks

13 New Storage Tanks

Location
Tanks Required

FMS 3

2810 Riverside Pkwy, Grand Junction, CO 81501

500 LITER (1 EA)

1500 LITER (1 EA)

FMS 6

720 N. Main St., Rocky Ford, CO 81067-1036

500 LITER (1 EA)

1500 LITER (1 EA)

FMS 7

5049 Front Range Pkwy, Watkins, CO 80137-7130

500 LITER (1 EA)

FMS 9

55 South Potomac St., Aurora, CO 80012-1398

500 LITER (1 EA)

1000 LITER (1EA)

MATES

8700 Butts Rd. Bldg 9100, Fort Carson, CO 80913

1000 LITER (1 EA)

2000 LITER (3 EA)

CSMS

4045 County Road 22, Longmont, CO 80504-9404

2000 LITER (2 EA)

disposal REQUIRED-13 Storage Tanks

Location
Tanks Required
sIZE
wEIGHT

FMS 3

2810 Riverside Pkwy, Grand Junction, CO 81501

1000 LITER (2EA)

69'' Dia. x 39.5'' High
1000 LBS PER

2000 LBS TOTAL

FMS 6

720 N. Main St., Rocky Ford, CO 81067-1036

1000 LITER (1EA)

69'' Dia. x 39.5'' High
1000 LBS

FMS 7

5049 Front Range Pkwy, Watkins, CO 80137-7130

500 LITER (1 EA)

48'' Dia. x 30 x 39'' High

500 LBS

FMS 9

55 South Potomac St., Aurora, CO 80012-1398

500 LITER (1 EA)

1000 LITER (1EA)

48'' Dia. x 30 x 39'' High 69'' Dia. x 39.5'' High

500 LBS

905 LBS

MATES

8700 Butts Rd. Bldg 9100, Fort Carson, CO 80913

1000 LITER (1 EA)

2500 LITER (3 EA)

69'' Dia. x 39.5'' High 71'' dia. x 70'' high

905 LBS

1860 LBS

CSMS

4045 County Road 22, Longmont, CO 80504-9404

2000 LITER (1 EA)

500 LITER (2 EA)

69'' Dia. x 39.5'' High 48'' Dia. x 30 x 39'' High

905 LBS

500 LBS

1905 LBS TOTAL

ACCEPTANCE

· All purchased equipment is to be shipped by the vendor.

· All equipment will be capable of the full range of manufacturer specified capabilities.

· Equipment will be damage free after installation.

PAYMENT

· Vendor/Contractor must Invoice through Wide Area Workflow (WAWF)

· Vendor must be registered in WAWF in order to submit an invoice