Offsite HCFCD Basin Bid Set.pdf

PDF 6 MB Posted

Attached to
Public Water, Drainage & Paving Improvements for Rocchi Road Extension
Solicitation number
41961-00
Issued by
Harris County, Texas

About this file

This is a bid set document prepared for the Harris County Flood Control District (HCFCD) related to offsite basin improvements for the Public Water, Drainage & Paving Improvements for Rocchi Road Extension project in Texas. The document contains engineering plans and specifications for excavation and drainage work, including detailed site maps with construction limits, filter dam locations, and coordinate data. The project involves clearing approximately 0.12 acres with a total proposed excavation of 815 cubic yards in this scope, building upon ongoing and completed work that includes 2.36 acres of clearing and 14,501 cubic yards of excavation. The plans reference project numbers P2206070053 and P2308170179, with benchmark elevations and survey point tables provided for contractor verification. The bid set was finalized as of July 30, 2026, and includes detailed point elevation data ranging from approximately 175 to 182 feet.

The contractor is responsible for all clearing, grubbing, dust mitigation during dry conditions, SWPPP compliance, and material disposal in accordance with HCFCD Standard Construction Specifications and Details. Critical requirements include maintaining a minimum 10-foot buffer from Waters of the U.S. and a 25-foot buffer from wetland areas, with site access restricted to designated routes only. Contractors must provide 48-hour advance notice to HCFCD prior to excavation, coordinate with Orange County Engineering for any required driveway permits, and conduct migratory bird surveys if tree clearing is necessary, with a 10-day window for clearing following survey approval. Turf establishment and erosion control measures must be implemented immediately following grade approval. The TRE pit location is available for excavation for up to 24 months after plan approval, after which the excavation area may be reassigned to another development.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P:

\1

\1

-1

-0

\4 -0

-P

RO

DU

CT

IO

N-

W

OR

KI

NG

\4 -1

-B

IM

-C

AD

\D

RA

IN

AG

E\ L5

-0

9-

LJ

A\ L5

-0

9-

OV

ER

AL

L_

NE

AR

M

AP

A

ER

IA

L- 2.

DW

G

D

GS

TE

EL

E |

S

AV

ED

: W ed ne sd ay

, J uly

9, 1:

:3

PM |

PL

OT

TE

D:

W ed ne sd ay , J uly

9, 1:

:5

PM

BA

U

ER

SCHIEL ROAD

BE

C

KE

R

BAUER HOCKLEY

RESERVED FOR

P2206070053 CUMBERLAND

BUSINESS CENTER TRE

4 19

G R

AN

D

P

AR

KW

AY

-9

G R

AN

D

P

AR

KW

AY

-9

SCHIEL ROAD

CONSTRUCTION

LIMITS

CONSTRUCTION

LIMITS

CONSTRUCTION LIMITS

WETLAND

AREA (TYP)

2 1

CONSTRUCTION

LIMITS

44A

07/30/2026

BID

SET

ONLY

KVo Highlight

P:

\1

\1

-1

-0

\4 -0

-P

RO

DU

CT

IO

N-

W

OR

KI

NG

\4 -1

-B

IM

-C

AD

\D

RA

IN

AG

E\ L5

-0

9-

LJ

A\ L5

-0

9-

OV

ER

AL

L_

NE

AR

M

AP

A

ER

IA

L-

SW

PP

P.

DW

G

D

GS

TE

EL

E |

S

AV

ED

: W ed ne sd ay

, J uly

9, 1:

:1

PM |

OT

TE

D:

W ed ne sd ay , J uly

9, 1:

:1

PM

CONSTRUCTION

LIMITS

BA

U

ER

BAUER HOCKLEY

FD-2

LEGEND

HCFCD FILTER DAM

(SEE SWPPP DETAIL SHEET)

FD-2FD-2

FD-2

FD-2

FD-2FD-2

FD-2

FD-2 FD-2

FD-2

FD-2

FD-2

FD-2

FD-2

FD

-2

FD

-2

FD-2

FD-2 FD-2

FD-2

FD-2

FD-2

FD-2

FD-2

FD-2

FD-2FD-2

FD-2

FD-2

FD

-2

FD-2

FD-2

FD-2 FD-2

FD-2

FD-2

FD-2

FD

-2

FD-2

FD-2

FD-2

FD-2FD-2

FD-2

FD-2

FD-2

FD-2

FD-2

FD-2

FD-2

FD-2

FD

-2

FD

-2

FD-2

FD-2

FD

-2

FD-2

FD

-2

FD

-2

FD

-2

FD

-2

FD

-2

FD

-2

FD-2

FD

-2

FD-2

FD

-2

FD-2

07/30/2026

BID

SET

ONLY

-1 .0%

-1 .0

56715672

Point Table

Point #

Elevation

175.05

175.08

175.11

175.14

179.49

181.60

179.38

178.56

175.14

175.11

176.65

Northing

13939115.03

13939147.68

13939167.22

13939179.17

13939545.45

13939601.87

13939590.68

13939536.14

13939194.20

13939171.24

13939117.97

Easting

2990695.69

2990688.82

2990668.25

2990650.65

2990415.49

2990446.91

2990668.78

2990718.89

2990720.64

2990709.86

2990687.86

Point Table

Point #

Elevation

178.00

177.88

178.17

182.13

182.56

182.15

182.00

181.59

179.94

179.00

175.05

Northing

13939146.96

13939157.94

13939174.64

13939542.75

13939605.69

13939601.73

13939536.21

13939192.59

13939160.06

13939140.93

13939117.09

Easting

2990676.94

2990660.27

2990639.25

2990405.35

2990446.83

2990669.58

2990732.64

2990746.58

2990726.58

2990716.52

2990705.47

P2308170179

H O

R

IZ

O N

A T

C

YP

R

ES

S/ R

O C

C H

I R O

AD

4:1 SIDE SLOPE (TYP.)

CLEARING AREA = 2.48 ACRES

TOTAL EXCAVATION = 14,866 CY

WATERS OF THE U.S.

MAINTAIN MIN 10' BUFFER

P:

\1

\1

-1

-0

\4 -0

-P

RO

DU

CT

IO

N-

W

OR

KI

NG

\4 -1

-B

IM

-C

AD

\D

RA

IN

AG

E\ L5

-0

9-

LJ

A\

PI

T_

_H

OR

IZ

ON

C

YP

RE

SS

N W

HC

M

UD

-5

\P

IT

HO

RI

ZO

N

AT

C

YP

RE

SS

P

-R

EV

IS

IO

N.

DW

G

D

GS

TE

EL

E |

S

AV

ED

: W ed ne sd ay

, J uly

9, 1:

:2

PM |

H

CF

CD

.C

TB

OT

TE

D:

W ed ne sd ay

, J uly

9, 1:

:2

PM

PROP. 20' ACCESS ROAD

CONTRACTOR TO CLEAR IF

ROAD HAS NOT ALREADY

BEEN CLEARED

BENCHMARK

REFERENCE MARK 110995

ELEV=193.28

TBM-120

CP-SET 5/8" IRC

ELEV=183.05

NORTHING 13939668.7

EASTING 2989581.347

PROJECT NUMBER

UNIT NUMBER L500-09-00

FD-2 HCFCD FILTER DAM

(SEE SWPPP DETAIL SHEET)

LEGEND

NOTES

1. Comply with all HCFCD and OCE design and permitting requirements.

2. Coordinate with OCE for driveway permit, as necessary.

3. Contractor responsible for SWPPP requirements for small or large sites, as necessary.

4. Remain 10' away from Waters of the US.

5. Remain 25' away from Wetland areas.

6. Site access shall only be as designated in drawings.

7. Contractor responsible for clearing and grubbing for related excavation.

8. During dry conditions, contractor shall mitigate dust with HCFCD approved dust abatement practices.

9. Notify HCFCD at least 48-hours ahead of excavation occuring. Notify HCFCD Department Development Coordination and Inspection Section at 9900 Northwest Freeway, Houston, Texas 77092, Phone 346-286-4120

10. Excavated side slopes must be stable per prevailing plan information or HCFCD standards.

11. HCFCD reserves the right to adjust the limits of excavation.

12. Surface coordinates can be converted to grid by multiplying by a scale factor of 0.999870017.

13. If any trees require clearing, a migratory bird survey must be conducted of those trees prior to clearing. Have your surveyor mark the area of clearing and notify your HCFCD inspector that the area is ready for a migratory bird survey. Please expect a one-week turnaround for the survey to be conducted and approval given by HCFCD Environmental. Once approval is given, contractor has 10 days to clear the designated trees before requiring another survey.

14. Contractor will be required to keep adjacent roadways and properties free and clear of debris and accumulated dirt at all times.

15. For any questions, please contact your inspector or the HCFCD DCID department manager 346-286-4120.

16. The Harris County Flood Control District requires that excavated material removed from District property follow the HCFCD Standard Construction Specifications and Details. The latest version of the Standard Specifications can be found on the Flood Control District website. The Standard Specification for Material Disposal (Section 02120) includes the requirement for submittal of proposed material disposal sites for approval. Disposal is prohibited in wetlands, environmentally sensitive areas without permits, and within the 500-year floodplain.

17. Natural ground elevations are approximate based on 2018 LiDAR. Contractor to verify existing elevations and resulting volumes prior to excavation. If actual excavation volume will differ from the estimated volume, coordinate with HCFCD to determine modifications to depth or extents of the excavation area to ensure total required excavation is still met.

18. Immediately after the finished grade has been approved, contractor shall provide turf establishment operations to all disturbed soil to reduce erosion and excessive weed growth. Work shall conform to the requirements specified in HCFCD specification “Section 02922 - Sod”, “Section 02923 - Seed”, or “Section 02925 - Hydrolmulch-Hydroseeding”.

19. TRE pit location is available for excavation for up to 24 months after plan approval. After 24 months, the excavation area may be assigned to another development for excavation.

FD-2

07/30/2026

BID

SET

ONLY

ONGOING/COMPLETED SCOPE:

CLEARING AREA = 2.36 ACRES

TOTAL EXCAVATION = 14,501 CY

PROPOSED IN THIS SCOPE:

CLEARING AREA = 0.12 ACRES

TOTAL EXCAVATION = 815 CY

Sheets and Views
Layout 1

File details come from the government source that posted it. Updated .