Standard Wage Pricing 149-24 Pedestrian and Bicycle Improvements
| Vendor Name: | | Griffin Pavement Striping, LLC | |
| This is a low bid per item, per district contract. Vendors may submit pricing for any of the items and locations below. | | | |
| MARKINGS | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 1 | Furnish and install high visibility crosswalk marking , 12", 644-Thermo | Lin. Ft. | Standard | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 |
| | | Rush | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 |
| | | Expedited | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 |
| 2 | Furnish and install high visibility crosswalk marking , 24", 644-Thermo | Lin. Ft. | Standard | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 |
| | | Rush | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 |
| | | Expedited | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 |
| 3 | Furnish and install high visibility crosswalk marking , 12", 645-Preformed | Lin. Ft. | Standard | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 |
| | | Rush | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 |
| | | Expedited | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 4 | Furnish and install high visibility crosswalk marking , 24", 645-Preformed | Lin. Ft. | Standard | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| | | Rush | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| | | Expedited | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 |
| 5 | Furnish and install high visibility crosswalk marking , 12", 647 - Heat-Fused Preformed Thermo | Lin. Ft. | Standard | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| | | Rush | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| | | Expedited | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 |
| 6 | Furnish and install high visibility crosswalk marking , 24", 647 - Heat-Fused Preformed Thermo | Lin. Ft. | Standard | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 |
| | | Rush | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 |
| | | Expedited | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 7 | Furnish and install high visibility crosswalk marking , 12", 646 - Epoxy | Lin. Ft. | Standard | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 |
| | | Rush | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 |
| | | Expedited | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 8 | Furnish and install high visibility crosswalk marking , 24", 646 - Epoxy | Lin. Ft. | Standard | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 |
| | | Rush | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 |
| | | Expedited | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 9 | Remove Crosswalk Markings | Lin. Ft. | Standard | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| | | Rush | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| | | Expedited | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 |
| 10 | Furnish and Install advanced yield marking | | | | | | | | | | | | | | |
| - 1 lane, 644 - Thermo | Each | Standard | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | | |
| | | | Rush | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| | | | Expedited | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 11 | Furnish and Install advanced yield marking | |
| - 1 lane, 645 - Preformed | Each | Standard | |
| | | Rush |
| | | Expedited |
| 12 | Furnish and Install advanced yield marking | | | | | | | | | | | | | | |
| - 1 lane, 646 - Epoxy | Each | Standard | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | | |
| | | | Rush | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 |
| | | | Expedited | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 |
| 13 | Furnish and Install advanced yield marking | | | | | | | | | | | | | | |
| - 1 lane, 647 - Heat-Fused Preformed Thermo | Each | Standard | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | | |
| | | | Rush | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| | | | Expedited | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 14 | Furnish and Install Shared Lane Marking, 644- Thermo | Each | Standard | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $520.00 | $520.00 |
| | | Rush | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $520.00 | $520.00 |
| | | Expedited | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $650.00 | $650.00 |
| 15 | Furnish and Install Shared Lane Marking, 645 - Preformed | Each | Standard |
| | | Rush |
| | | Expedited |
| 16 | Furnish and Install Shared Lane Marking, 646 - Epoxy | Each | Standard | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 |
| | | Rush | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 |
| | | Expedited | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 17 | Furnish and Install Shared Lane Marking, 647 - Heat-Fused Preformed Thermo | Each | Standard | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $520.00 | $520.00 |
| | | Rush | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $520.00 | $520.00 |
| | | Expedited | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $650.00 | $650.00 |
| 18 | Furnish and Install "School" text Pavement Marking, 644 - Thermo | Each | Standard | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 |
| | | Rush | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 |
| | | Expedited | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 |
| 19 | Furnish and Install "School" text Pavement Marking, 645 - Preformed | Each | Standard |
| | | Rush |
| | | Expedited |
| 20 | Furnish and Install "School" text Pavement Marking, 646 - Epoxy | Each | Standard | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| | | Rush | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| | | Expedited | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 21 | Furnish and Install "School" text Pavement Marking, 647 - Heat-Fused Preformed Thermo | Each | Standard | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 |
| | | Rush | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 |
| | | Expedited | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 22 | Remove pavement marking/striping <12" wide | Lin. Ft. | Standard | $4.00 | $4.00 | $4.00 | $5.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $5.00 | $5.00 |
| | | Rush | $4.00 | $4.00 | $4.00 | $5.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $5.00 | $5.00 |
| | | Expedited | $4.00 | $4.00 | $4.00 | $5.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $5.00 | $5.00 |
| 23 | Remove pavement marking/striping >12" wide | Lin. Ft. | Standard | $7.00 | $7.00 | $7.00 | $8.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $8.00 | $8.00 |
| | | Rush | $7.00 | $7.00 | $7.00 | $8.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $8.00 | $8.00 |
| | | Expedited | $7.00 | $7.00 | $7.00 | $8.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $8.00 | $8.00 |
| 24 | Furnish and Install "bike lane striping, 644 - Thermo | Lin. Ft. | Standard | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| | | Rush | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| | | Expedited | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 25 | Furnish and Install "bike lane striping, 645 - Preformed | Lin. Ft. | Standard |
| | | Rush |
| | | Expedited |
| 26 | Furnish and Install "bike lane striping, 646 - Epoxy | Lin. Ft. | Standard | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| | | Rush | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| | | Expedited | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| 27 | Furnish and Install "bike lane striping, 647 - Heat-Fused Preformed Thermo | Lin. Ft. | Standard | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 |
| | | Rush | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 |
| | | Expedited | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 |
| 28 | Furnish and Install bike box markings | Each | Standard | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| | | Rush | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| | | Expedited | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 29 | Furnish and Install marking - white bike with green background - 2'x3' - Preformed thermoplastic | Each | Standard | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| | | Rush | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| | | Expedited | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| SIGNS | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 30 | Furnish and install RRFB, sign-mounted (Solar-Powered) | |
| Each | Standard | |
| | Rush |
| | Expedited |
| 31 | Furnish and install regulatory sign, R1-5, 18"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 32 | Furnish and install regulatory sign, R1-5, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 33 | Furnish and install regulatory sign, R1-5, 36"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 34 | Furnish regulatory sign, R1-6, with portable base | Each | Standard |
| | | Rush |
| | | Expedited |
| 35 | Furnish and install regulatory sign, R1-9, 90"x24", overhead on existing pole or span wire | Each | Standard |
| | | Rush |
| | | Expedited |
| 36 | Furnish and install regulatory sign, R3-H16, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 37 | Furnish and install regulatory sign, R3-17, 24"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 38 | Furnish and install regulatory sign, R3-17, 30"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 39 | Furnish and install regulatory sign, R4-4, 36"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 40 | Furnish and install regulatory sign, R4-11, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 41 | Furnish and install regulatory sign, R10-15, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 42 | Furnish and install warning sign, W11-2, 24"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 43 | Furnish and install warning sign, W11-2, 24"x24", with W16-9P below, 24"x12", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 44 | Furnish and install warning sign, W11-2, 24"x24", with W16-7P below, 24"x12", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 45 | Furnish and install warning sign, W11-2, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 46 | Furnish and install warning sign, W11-2, 30"x30", with W16-9P below, 30"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 47 | Furnish and install warning sign, W11-2, 30"x30", with W16-7P below, 30"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 48 | Furnish and install warning sign, W11-2, 36"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 49 | Furnish and install warning sign, W11-2, 36"x36", with W16-9P below, 36"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 50 | Furnish and install warning sign, W11-2, 48"x48"", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 51 | Furnish and install warning sign, W11-2, 48"x48", with W16-9P below, 48"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 52 | Furnish and install warning sign, W11-15, 24"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 53 | Furnish and install warning sign, W11-15, 24"x24", with W16-9P below, 24"x12", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 54 | Furnish and install warning sign, W11-15, 24"x24", with W16-7P below, 24"x12", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 55 | Furnish and install warning sign, W11-15, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 56 | Furnish and install warning sign, W11-15, 30"x30", with W16-9P below, 30"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 57 | Furnish and install warning sign, W11-15, 30"x30", with W16-7P below, 30"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 58 | Furnish and install warning sign, W11-15, 36"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 59 | Furnish and install warning sign, W11-15, 36"x36", with W16-9P below, 36"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 60 | Furnish and install warning sign, W11-15, 48"x48"", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 61 | Furnish and install warning sign, W11-15, 48"x48", with W16-9P below, 48"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 62 | Furnish and install guide sign, M1-8a, w/ post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 63 | Furnish and install guide sign, M1-9a, w/ post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 64 | Add solar powered, LED-enhancement to any warning sign | Each | Standard |
| | | Rush |
| | | Expedited |
| 65 | Install any sign overhead | Each | Standard |
| | | Rush |
| | | Expedited |
| 66 | Furnish and install warning sign, 'School Bus Stop Ahead', S3-1, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 67 | Furnish and install stop sign, 24" | Each | Standard |
| | | Rush |
| | | Expedited |
| 68 | Furnish and install 'cross traffic does not stop' sign, 24" | Each | Standard |
| | | Rush |
| | | Expedited |
| 69 | Furnish and install warning sign, as per plan, 30"x30" or smaller | Each | Standard |
| | | Rush |
| | | Expedited |
| 70 | Furnish and install 'No Turn On Red' sign (R10-11) 24"x30" | Each | Standard |
| | | Rush |
| | | Expedited |
| SIGNALS | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 71 | Furnish and install accessible pedestrian signals to outfit existing traffic signal or PHB installation - 1 crossing | Each | Standard |
| | | Rush |
| | | Expedited |
| 72 | Furnish and install ADA-compliant pushbutton on existing pole | Each | Standard |
| | | Rush |
| | | Expedited |
| 73 | Furnish and install ADA-compliant pushbutton with pedestal support | Each | Standard |
| | | Rush |
| | | Expedited |
| 74 | Remove and replace existing pushbutton | Each | Standard |
| | | Rush |
| | | Expedited |
| 75 | Furnish and Install school-zone flasher assembly on existing pole | Each | Standard |
| | | Rush |
| | | Expedited |
| Misc. | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 76 | Furnish and install bikeway railing, in accordance with SCD RM-5.2 | Each | Standard |
| | | Rush |
| | | Expedited |
| 77 | Furnish and install detectable warning surface (Spec. 712.14) (BP 7.1) | Each | Standard |
| | | Rush |
| | | Expedited |
| 78 | Furnish detectable warning surface (Spec. 712.14) (BP 7.1) | Each | Standard |
| | | Rush |
| | | Expedited |
| 79 | Remove and replace detectable warning surface (Spec. 712.14) (BP 7.1) | Each | Standard |
| | | Rush |
| | | Expedited |
| 80 | Furnish and install bike rack | Each | Standard |
| | | Rush |
| | | Expedited |
| 81 | Furnish and Install automated pedestrian and bicycle counter on trail or path - in-ground loops | Each | Standard |
| | | Rush |
| | | Expedited |
| 82 | Furnish and Install trail or path counter - radar | Each | Standard |
| | | Rush |
| | | Expedited |
| 83 | Furnish and Install trail or path counter - video | Each | Standard |
| | | Rush |
| | | Expedited |
| 84 | Furnish and Install bicycle and pedestrian detection system - radar or video | Each | Standard |
| | | Rush |
| | | Expedited |
| 85 | Furnish and install 3' flexible delineator - anchored to pavement | Each | Standard |
| | | Rush |
| | | Expedited |
| 86 | Furnish and install 4' flexible delineator - anchored to pavement | Each | Standard |
| | | Rush |
| | | Expedited |
| 87 | Furnish and install parking curb - anchored to pavement | Each | Standard |
| | | Rush |
| | | Expedited |
| 88 | Furnish and install speed cushion - anchored to pavement | Each | Standard |
| | | Rush |
| | | Expedited |
| MOT/Mob | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 100 | Maintenance of Traffic, One Lane Closure on a Two Lane Highway | Each | Standard | $3,500.00 | $3,500.00 | $3,500.00 | $4,000.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $4,000.00 | $4,000.00 |
| | | Rush | $4,000.00 | $4,100.00 | $4,100.00 | $4,500.00 | $4,100.00 | $4,100.00 | $4,100.00 | $4,100.00 | $4,100.00 | $4,100.00 | $4,500.00 | $4,500.00 |
| | | Expedited | $4,400.00 | $4,650.00 | $4,650.00 | $4,850.00 | $4,650.00 | $4,650.00 | $4,650.00 | $4,650.00 | $4,650.00 | $4,650.00 | $4,850.00 | $4,850.00 |
| 101 | Maintenance of Traffic, One Lane Closure on a Multi-Lane Divided Highway | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 102 | Maintenance of Traffic, One Lane Closure on a Multi-Lane Undivided Highway | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 103 | Maintenance of Traffic, Lane Closure on the Near Side of an Intersection | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 104 | Maintenance of Traffic, Lane Closure on the Far Side of an Intersection | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 105 | Maintenance of Traffic, One Lane Closure on a Four Lane or Greater Divided Highway | Each | Standard | $5,150.00 | $5,150.00 | $5,150.00 | $5,300.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,300.00 | $5,300.00 |
| | | Rush | $5,600.00 | $5,600.00 | $5,600.00 | $5,800.00 | $5,600.00 | $5,600.00 | $5,600.00 | $5,600.00 | $5,600.00 | $5,600.00 | $5,800.00 | $5,800.00 |
| | | Expedited | $6,210.00 | $6,210.00 | $6,210.00 | $6,450.00 | $6,210.00 | $6,210.00 | $6,210.00 | $6,210.00 | $6,210.00 | $6,210.00 | $6,450.00 | $6,450.00 |
| 106 | Maintenance of Traffic, Multiple Lane Closures at an Intersection | Each | Standard | $4,580.00 | $4,580.00 | $4,580.00 | $4,710.00 | $4,580.00 | $4,580.00 | $4,580.00 | $4,580.00 | $4,580.00 | $4,580.00 | $4,710.00 | $4,710.00 |
| | | Rush | $4,910.00 | $4,910.00 | $4,910.00 | $5,090.00 | $4,910.00 | $4,910.00 | $4,910.00 | $4,910.00 | $4,910.00 | $4,910.00 | $5,090.00 | $5,090.00 |
| | | Expedited | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 |
| 107 | Maintenance of Traffic, Closure at the Side of an Intersection | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 108 | Maintenance of Traffic, Shoulder Closure on Any Highway | Each | Standard | $3,710.00 | $3,710.00 | $3,710.00 | $3,950.00 | $3,710.00 | $3,710.00 | $3,710.00 | $3,710.00 | $3,710.00 | $3,710.00 | $3,950.00 | $3,950.00 |
| | | Rush | $3,900.00 | $3,900.00 | $3,900.00 | $4,100.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $4,100.00 | $4,100.00 |
| | | Expedited | $4,000.00 | $4,000.00 | $4,000.00 | $4,500.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,500.00 | $4,500.00 |
| 109 | Mobilization | Each | Standard | $5,000.00 | $5,000.00 | $5,000.00 | $5,400.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,400.00 | $5,400.00 |
| | | Rush | $6,000.00 | $6,000.00 | $6,000.00 | $6,500.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,500.00 | $6,500.00 |
| | | Expedited | $7,000.00 | $7,000.00 | $7,000.00 | $7,500.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,500.00 | $7,500.00 |
Prevailing Wage Pricing 149-24 Pedestrian and Bicycle Improvements
| Vendor Name: | | Griffin Pavement Striping, LLC | |
| This is a low bid per item, per district contract. Vendors may submit pricing for any of the items and locations below. | | | |
| MARKINGS | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 1 | Furnish and install high visibility crosswalk marking , 12", 644-Thermo | Lin. Ft. | Standard | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 |
| | | Rush | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 | $4.85 |
| | | Expedited | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 |
| 2 | Furnish and install high visibility crosswalk marking , 24", 644-Thermo | Lin. Ft. | Standard | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 |
| | | Rush | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 | $9.20 |
| | | Expedited | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 | $9.80 |
| 3 | Furnish and install high visibility crosswalk marking , 12", 645-Preformed | Lin. Ft. | Standard | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 |
| | | Rush | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 |
| | | Expedited | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 4 | Furnish and install high visibility crosswalk marking , 24", 645-Preformed | Lin. Ft. | Standard | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| | | Rush | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| | | Expedited | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 | $47.00 |
| 5 | Furnish and install high visibility crosswalk marking , 12", 647 - Heat-Fused Preformed Thermo | Lin. Ft. | Standard | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| | | Rush | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| | | Expedited | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 |
| 6 | Furnish and install high visibility crosswalk marking , 24", 647 - Heat-Fused Preformed Thermo | Lin. Ft. | Standard | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 |
| | | Rush | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 | $23.25 |
| | | Expedited | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 7 | Furnish and install high visibility crosswalk marking , 12", 646 - Epoxy | Lin. Ft. | Standard | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 |
| | | Rush | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 | $13.25 |
| | | Expedited | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 8 | Furnish and install high visibility crosswalk marking , 24", 646 - Epoxy | Lin. Ft. | Standard | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 |
| | | Rush | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 |
| | | Expedited | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 9 | Remove Crosswalk Markings | Lin. Ft. | Standard | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| | | Rush | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| | | Expedited | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 |
| 10 | Furnish and Install advanced yield marking | | | | | | | | | | | | | | |
| - 1 lane, 644 - Thermo | Each | Standard | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | | |
| | | | Rush | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| | | | Expedited | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 11 | Furnish and Install advanced yield marking | |
| - 1 lane, 645 - Preformed | Each | Standard | |
| | | Rush |
| | | Expedited |
| 12 | Furnish and Install advanced yield marking | | | | | | | | | | | | | | |
| - 1 lane, 646 - Epoxy | Each | Standard | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | | |
| | | | Rush | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 |
| | | | Expedited | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 | $865.00 |
| 13 | Furnish and Install advanced yield marking | | | | | | | | | | | | | | |
| - 1 lane, 647 - Heat-Fused Preformed Thermo | Each | Standard | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | | |
| | | | Rush | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| | | | Expedited | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 14 | Furnish and Install Shared Lane Marking, 644- Thermo | Each | Standard | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $520.00 | $520.00 |
| | | Rush | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $520.00 | $520.00 |
| | | Expedited | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $650.00 | $650.00 |
| 15 | Furnish and Install Shared Lane Marking, 645 - Preformed | Each | Standard |
| | | Rush |
| | | Expedited |
| 16 | Furnish and Install Shared Lane Marking, 646 - Epoxy | Each | Standard | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 |
| | | Rush | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 |
| | | Expedited | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 17 | Furnish and Install Shared Lane Marking, 647 - Heat-Fused Preformed Thermo | Each | Standard | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $520.00 | $520.00 |
| | | Rush | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $470.00 | $520.00 | $520.00 |
| | | Expedited | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $520.00 | $650.00 | $650.00 |
| 18 | Furnish and Install "School" text Pavement Marking, 644 - Thermo | Each | Standard | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 |
| | | Rush | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 | $880.00 |
| | | Expedited | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 | $920.00 |
| 19 | Furnish and Install "School" text Pavement Marking, 645 - Preformed | Each | Standard |
| | | Rush |
| | | Expedited |
| 20 | Furnish and Install "School" text Pavement Marking, 646 - Epoxy | Each | Standard | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| | | Rush | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| | | Expedited | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 21 | Furnish and Install "School" text Pavement Marking, 647 - Heat-Fused Preformed Thermo | Each | Standard | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 |
| | | Rush | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 |
| | | Expedited | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 22 | Remove pavement marking/striping <12" wide | Lin. Ft. | Standard | $4.00 | $4.00 | $4.00 | $5.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $5.00 | $5.00 |
| | | Rush | $4.00 | $4.00 | $4.00 | $5.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $5.00 | $5.00 |
| | | Expedited | $4.00 | $4.00 | $4.00 | $5.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $5.00 | $5.00 |
| 23 | Remove pavement marking/striping >12" wide | Lin. Ft. | Standard | $7.00 | $7.00 | $7.00 | $8.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $8.00 | $8.00 |
| | | Rush | $7.00 | $7.00 | $7.00 | $8.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $8.00 | $8.00 |
| | | Expedited | $7.00 | $7.00 | $7.00 | $8.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $8.00 | $8.00 |
| 24 | Furnish and Install "bike lane striping, 644 - Thermo | Lin. Ft. | Standard | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| | | Rush | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| | | Expedited | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 25 | Furnish and Install "bike lane striping, 645 - Preformed | Lin. Ft. | Standard |
| | | Rush |
| | | Expedited |
| 26 | Furnish and Install "bike lane striping, 646 - Epoxy | Lin. Ft. | Standard | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| | | Rush | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| | | Expedited | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| 27 | Furnish and Install "bike lane striping, 647 - Heat-Fused Preformed Thermo | Lin. Ft. | Standard | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 |
| | | Rush | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 |
| | | Expedited | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 |
| 28 | Furnish and Install bike box markings | Each | Standard | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| | | Rush | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| | | Expedited | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 29 | Furnish and Install marking - white bike with green background - 2'x3' - Preformed thermoplastic | Each | Standard | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| | | Rush | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| | | Expedited | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| SIGNS | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 30 | Furnish and install RRFB, sign-mounted (Solar-Powered) | |
| Each | Standard | |
| | Rush |
| | Expedited |
| 31 | Furnish and install regulatory sign, R1-5, 18"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 32 | Furnish and install regulatory sign, R1-5, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 33 | Furnish and install regulatory sign, R1-5, 36"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 34 | Furnish regulatory sign, R1-6, with portable base | Each | Standard |
| | | Rush |
| | | Expedited |
| 35 | Furnish and install regulatory sign, R1-9, 90"x24", overhead on existing pole or span wire | Each | Standard |
| | | Rush |
| | | Expedited |
| 36 | Furnish and install regulatory sign, R3-H16, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 37 | Furnish and install regulatory sign, R3-17, 24"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 38 | Furnish and install regulatory sign, R3-17, 30"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 39 | Furnish and install regulatory sign, R4-4, 36"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 40 | Furnish and install regulatory sign, R4-11, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 41 | Furnish and install regulatory sign, R10-15, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 42 | Furnish and install warning sign, W11-2, 24"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 43 | Furnish and install warning sign, W11-2, 24"x24", with W16-9P below, 24"x12", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 44 | Furnish and install warning sign, W11-2, 24"x24", with W16-7P below, 24"x12", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 45 | Furnish and install warning sign, W11-2, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 46 | Furnish and install warning sign, W11-2, 30"x30", with W16-9P below, 30"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 47 | Furnish and install warning sign, W11-2, 30"x30", with W16-7P below, 30"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 48 | Furnish and install warning sign, W11-2, 36"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 49 | Furnish and install warning sign, W11-2, 36"x36", with W16-9P below, 36"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 50 | Furnish and install warning sign, W11-2, 48"x48"", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 51 | Furnish and install warning sign, W11-2, 48"x48", with W16-9P below, 48"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 52 | Furnish and install warning sign, W11-15, 24"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 53 | Furnish and install warning sign, W11-15, 24"x24", with W16-9P below, 24"x12", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 54 | Furnish and install warning sign, W11-15, 24"x24", with W16-7P below, 24"x12", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 55 | Furnish and install warning sign, W11-15, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 56 | Furnish and install warning sign, W11-15, 30"x30", with W16-9P below, 30"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 57 | Furnish and install warning sign, W11-15, 30"x30", with W16-7P below, 30"x18", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 58 | Furnish and install warning sign, W11-15, 36"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 59 | Furnish and install warning sign, W11-15, 36"x36", with W16-9P below, 36"x24", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 60 | Furnish and install warning sign, W11-15, 48"x48"", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 61 | Furnish and install warning sign, W11-15, 48"x48", with W16-9P below, 48"x36", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 62 | Furnish and install guide sign, M1-8a, w/ post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 63 | Furnish and install guide sign, M1-9a, w/ post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 64 | Add solar powered, LED-enhancement to any warning sign | Each | Standard |
| | | Rush |
| | | Expedited |
| 65 | Install any sign overhead | Each | Standard |
| | | Rush |
| | | Expedited |
| 66 | Furnish and install warning sign, 'School Bus Stop Ahead', S3-1, 30"x30", w/post(s) | Each | Standard |
| | | Rush |
| | | Expedited |
| 67 | Furnish and install stop sign, 24" | Each | Standard |
| | | Rush |
| | | Expedited |
| 68 | Furnish and install 'cross traffic does not stop' sign, 24" | Each | Standard |
| | | Rush |
| | | Expedited |
| 69 | Furnish and install warning sign, as per plan, 30"x30" or smaller | Each | Standard |
| | | Rush |
| | | Expedited |
| 70 | Furnish and install 'No Turn On Red' sign (R10-11) 24"x30" | Each | Standard |
| | | Rush |
| | | Expedited |
| SIGNALS | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 71 | Furnish and install accessible pedestrian signals to outfit existing traffic signal or PHB installation - 1 crossing | Each | Standard |
| | | Rush |
| | | Expedited |
| 72 | Furnish and install ADA-compliant pushbutton on existing pole | Each | Standard |
| | | Rush |
| | | Expedited |
| 73 | Furnish and install ADA-compliant pushbutton with pedestal support | Each | Standard |
| | | Rush |
| | | Expedited |
| 74 | Remove and replace existing pushbutton | Each | Standard |
| | | Rush |
| | | Expedited |
| 75 | Furnish and Install school-zone flasher assembly on existing pole | Each | Standard |
| | | Rush |
| | | Expedited |
| Misc. | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 76 | Furnish and install bikeway railing, in accordance with SCD RM-5.2 | Each | Standard |
| | | Rush |
| | | Expedited |
| 77 | Furnish and install detectable warning surface (Spec. 712.14) (BP 7.1) | Each | Standard |
| | | Rush |
| | | Expedited |
| 78 | Furnish detectable warning surface (Spec. 712.14) (BP 7.1) | Each | Standard |
| | | Rush |
| | | Expedited |
| 79 | Remove and replace detectable warning surface (Spec. 712.14) (BP 7.1) | Each | Standard |
| | | Rush |
| | | Expedited |
| 80 | Furnish and install bike rack | Each | Standard |
| | | Rush |
| | | Expedited |
| 81 | Furnish and Install automated pedestrian and bicycle counter on trail or path - in-ground loops | Each | Standard |
| | | Rush |
| | | Expedited |
| 82 | Furnish and Install trail or path counter - radar | Each | Standard |
| | | Rush |
| | | Expedited |
| 83 | Furnish and Install trail or path counter - video | Each | Standard |
| | | Rush |
| | | Expedited |
| 84 | Furnish and Install bicycle and pedestrian detection system - radar or video | Each | Standard |
| | | Rush |
| | | Expedited |
| 85 | Furnish and install 3' flexible delineator - anchored to pavement | Each | Standard |
| | | Rush |
| | | Expedited |
| 86 | Furnish and install 4' flexible delineator - anchored to pavement | Each | Standard |
| | | Rush |
| | | Expedited |
| 87 | Furnish and install parking curb - anchored to pavement | Each | Standard |
| | | Rush |
| | | Expedited |
| 88 | Furnish and install speed cushion - anchored to pavement | Each | Standard |
| | | Rush |
| | | Expedited |
| MOT/Mob | | | |
| Item | | | |
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 100 | Maintenance of Traffic, One Lane Closure on a Two Lane Highway | Each | Standard | $3,500.00 | $3,500.00 | $3,500.00 | $4,000.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $4,000.00 | $4,000.00 |
| | | Rush | $4,000.00 | $4,100.00 | $4,100.00 | $4,500.00 | $4,100.00 | $4,100.00 | $4,100.00 | $4,100.00 | $4,100.00 | $4,100.00 | $4,500.00 | $4,500.00 |
| | | Expedited | $4,400.00 | $4,650.00 | $4,650.00 | $4,850.00 | $4,650.00 | $4,650.00 | $4,650.00 | $4,650.00 | $4,650.00 | $4,650.00 | $4,850.00 | $4,850.00 |
| 101 | Maintenance of Traffic, One Lane Closure on a Multi-Lane Divided Highway | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 102 | Maintenance of Traffic, One Lane Closure on a Multi-Lane Undivided Highway | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 103 | Maintenance of Traffic, Lane Closure on the Near Side of an Intersection | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 104 | Maintenance of Traffic, Lane Closure on the Far Side of an Intersection | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 105 | Maintenance of Traffic, One Lane Closure on a Four Lane or Greater Divided Highway | Each | Standard | $5,150.00 | $5,150.00 | $5,150.00 | $5,300.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,300.00 | $5,300.00 |
| | | Rush | $5,600.00 | $5,600.00 | $5,600.00 | $5,800.00 | $5,600.00 | $5,600.00 | $5,600.00 | $5,600.00 | $5,600.00 | $5,600.00 | $5,800.00 | $5,800.00 |
| | | Expedited | $6,210.00 | $6,210.00 | $6,210.00 | $6,450.00 | $6,210.00 | $6,210.00 | $6,210.00 | $6,210.00 | $6,210.00 | $6,210.00 | $6,450.00 | $6,450.00 |
| 106 | Maintenance of Traffic, Multiple Lane Closures at an Intersection | Each | Standard | $4,580.00 | $4,580.00 | $4,580.00 | $4,710.00 | $4,580.00 | $4,580.00 | $4,580.00 | $4,580.00 | $4,580.00 | $4,580.00 | $4,710.00 | $4,710.00 |
| | | Rush | $4,910.00 | $4,910.00 | $4,910.00 | $5,090.00 | $4,910.00 | $4,910.00 | $4,910.00 | $4,910.00 | $4,910.00 | $4,910.00 | $5,090.00 | $5,090.00 |
| | | Expedited | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 |
| 107 | Maintenance of Traffic, Closure at the Side of an Intersection | Each | Standard | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,475.00 | $4,475.00 |
| | | Rush | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,400.00 | $4,650.00 | $4,650.00 |
| | | Expedited | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 108 | Maintenance of Traffic, Shoulder Closure on Any Highway | Each | Standard | $3,710.00 | $3,710.00 | $3,710.00 | $3,950.00 | $3,710.00 | $3,710.00 | $3,710.00 | $3,710.00 | $3,710.00 | $3,710.00 | $3,950.00 | $3,950.00 |
| | | Rush | $3,900.00 | $3,900.00 | $3,900.00 | $4,100.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $4,100.00 | $4,100.00 |
| | | Expedited | $4,000.00 | $4,000.00 | $4,000.00 | $4,500.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,500.00 | $4,500.00 |
| 109 | Mobilization | Each | Standard | $5,000.00 | $5,000.00 | $5,000.00 | $5,400.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,400.00 | $5,400.00 |
| | | Rush | $6,000.00 | $6,000.00 | $6,000.00 | $6,500.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,500.00 | $6,500.00 |
| | | Expedited | $7,000.00 | $7,000.00 | $7,000.00 | $7,500.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,500.00 | $7,500.00 |