OC-12 ADDITIONAL TECH SG07OCT227801.pdf

PDF 107 KB Posted

Attached to
OC-12 (622. 08MB) TRUNK BETWEEN FAIRCHILD AFB, WA AND BEALE AFB, CA
Solicitation number
HC101323QA009
Issued by

About this file

This solicitation requests quotes for an OC-12 trunk circuit between Fairchild Air Force Base, WA and Beale Air Force Base, CA. The circuit must be channelized with 9 STS-1s in timeslots 1-9 and 1 STS-3c in timeslots 10-12, operate at 99.5% availability, and include a one-hour response time for repairs. Quotes are due by December 8, 2022 and must include monthly recurring and non-recurring charges by CLIN/SLIN. The selected vendor must install and maintain the circuit according to the technical specifications, with site surveys authorized at both government locations and inside wiring authorized per the requirements.

View the file

Other files

File Type Posted
Vendor Block Diagram Sample and Maps.pdf PDF
HC101323QA009.v2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDITIONAL TECHNICAL SPECIFICATIONS

CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: STS-12, 1310NM RATE: PLUS OR MINUS 20 PPM

(B) GOVERNMENT PROPOSED CHANNELIZATION: 9 STS-1S (TIMESLOTS 1-9) 1 STS-3CS

(TIMESLOTS 10-12)

(C) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,

SEVEN DAYS PER WEEK, AT LEAST 99.5% OF THE TIME OR IAW THE APPROVED TARIFFS.

(D) ONE-HOUR RESPONSE TIME TURN-AROUND MUST OCCUR TO REPAIR ONCE TROUBLE-

CALL HAS BEEN REPORTED.

(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO

CIRCUIT.

(F) SINGLE MODE FIBER TERMINATIONS "SC" CONNECTORS.

(G) NO NETWORK INTERFACE UNIT.

(H) DEDICATED PATH.

(I) CARRIER REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(J) VENDOR MUST CONDUCT A SATISFACTORY 72 HOUR END TO END TEST UTILIZING A

2E23 TEST PATTERN IAW ANSI STANDARD T1.514. ADDITIONALLY, VENDOR MUST

CONDUCT SATISFACTORY CONTINUITY CHECKS AND INITIAL 15 MINUTE END TO END

TEST ON EACH STS-1. AFTER COMPLETION OF CONTINUITY CHECKS AND INITIAL

TESTING, VENDOR MUST COMPLETE A SATISFACTORY 72 HOUR END TO END TEST ON

THE FIRST STS-1 (TIME-SLOT NUMBER 1) END TO END PRIOR TO TURNING OVER THE OC-

12 TO THE ACCEPTING AUTHORITY. THE VENDOR TEST SET/SETS MUST HAVE THE

ABILITY TO PRINT THE TEST RESULTS AND THOSE RESULTS MUST BE E-MAILED TO THE

ACCEPTING AUTHORITY FOR REVIEW.

(K) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONAL CENTER.

(L) OC-12 SERVICE WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DGOC:

PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BB TEAM PHONE:

(C) 618-418-9813, (D) 418-9813 EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-

INTEGRATION-LEAS E-BB-T@MAIL.MIL

***ATTENTION FAIRCHILD AFB LOCATION*** THIS REQUIREMENT MUST BE ENGINEERED

AND PROVISIONED TOTALLY DIVERSE END TO END TO THE GOVERNMENT'S SERVICE

DELIVERY POINTS (SDP'S) FROM TSR SG07OCT227798; MEANING THAT THE PHYSICAL

PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, CENTRAL OFFICE

LOCATIONS), AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS

PHYSICAL SEPARATION FROM TSR SG07OCT227798.

THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWI NGS FOR

TECHNICAL REVIEW SHOWING THE ROUTE FROM THE COMMERCIAL DE MARCS TO THE

SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. D RAWINGS MUST INCLUDE

TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD) . ADDITIONALLY, THE VENDOR IS TO

PROVIDE DITCO WITH DETAILED CIR CUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR

KML FORMAT, IDENTIFYIN G ALL POINTS OF PRESENCE (POP) FOR PROPOSAL

EVALUATION AND AS A F INAL RECORD OF THE INSTALLED PATH. THESE DIAGRAMS MUST

BE PROVID ED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL

.MIL) FOR HISTORICAL PURPOSES.

John.Beckman Cross-Out

SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.

VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF OC-12 SERVICE IAW

UNIQUE INSTALLATION FACTORS. INSIDE WIRING IS AUTHORIZED IAW WITH THE UNIQUE

INSTALLATION FACTORS.

File details come from the government source that posted it. Updated .