ntb2604dhart00064ad1.pdf
PDF 3 MB Posted
- Attached to
- TxDOT Aviation Division- Notice to Bidders
- Solicitation number
- NTB2604DHART00064
- Issued by
- Dallas County, Texas
About this file
Summary of Addendum No. 1 and Project Documentation
This document is Addendum No. 1 to the bidding materials for the Dalhart Municipal Airport Apron and Taxiway Reconstruction Project, issued jointly by the Texas Department of Transportation (TxDOT) Aviation Division and the City of Dalhart. The addendum modifies contract documents for a federally-funded airport improvement project involving concrete pavement removal, lime-treated subgrade installation, and new Portland Cement Concrete (PCC) pavement reconstruction across multiple taxiway sections. The project encompasses four base bid groups and two additive alternate groups, with estimated quantities including 7,189 square yards of concrete pavement removal for the primary taxiway section, 8" PCC pavement placement, pavement marking removal and replacement totaling approximately 15,000 square feet, and linear footage of barricading for pavement closures. A mandatory pre-bid conference was held on May 6, 2026, at Dalhart Municipal Airport, with sealed bids required to be submitted by 2:00 PM on May 20, 2026, to Kelle Chancey at TxDOT Aviation Division in Austin. Contract time is specified as 90 calendar days for the base bid with additional 10-calendar-day periods for each additive alternate, and the contract will be awarded within 60 calendar days from bid opening. Addendum No. 1, issued May 12, 2026, revised the bid form, updated summary of quantities, modified KSA Specification Item 105 regarding barricade payment from lump sum to linear foot basis, and provided clarifications on sulfate testing procedures and prime coat protection for lime-treated subgrades.
The Engineers' Estimate of Probable Cost totals approximately $2.25 million, comprising Base Bid Groups 1-4 at $1,688,604.25 and Additive Alternates 1 and 2 at $558,929.00. The project carries a zero percent Disadvantaged Business Enterprise (DBE) participation goal with no set-aside requirements, an 11.0 percent minority participation requirement in each trade, and a 6.9 percent female participation requirement in each trade. Bidders must provide pricing for the base bid and all additive alternates, with contract award based on the lowest qualified bid. The project is federally funded through the Airport Improvement Program (AIP) and requires compliance with Buy American provisions for steel and manufactured products, federal wage rate requirements, and mandatory federal contract provisions. Successful bidders must furnish Performance and Payment Bonds equal to the full contract price, submit DBE participation plans or good faith efforts documentation within five calendar days of bid opening, and comply with eGrants submission requirements. Liquidated damages are assessed at $1,000 per calendar day for work extending beyond the allotted time, and the prime contractor must perform at least 30 percent of the total original contract cost with its own organization on contracts valued at or above $500,000. No retainage applies, with payment made up to 95 percent of contract amount for installed work items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ntb2604dhart00064ad2.pdf | ||
| ntb2604dhart00064.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1
To: All Plan Holders
Airport: Dalhart Municipal Airport
Date: Tuesday, May 12, 2026
Project: Apron and Taxiway Reconstruction
KSA Project No.: 103412
TxDOT CSJ No.: 2604DHART
The plans, specifications, and contract documents are modified as described below. All bidders shall acknowledge receipt of this and all other addenda on page 4 of the revised bid form titled Revised per Addendum No. 1. This addendum becomes a part of the contract documents. All provisions of the original plans, specifications, and contract documents shall remain in full force and effect, except as modified by this addendum.
I. Contract Document Revisions
A. Bid Form
Replace with the attached Revised Bid Form. Note that the award of bids will be based on the bid items and quantities as listed in the Revised Bid Form. Any variance in bid submittals from the Revised Bid Form will result in the bid being disqualified.
II. Plan Revisions
A. Plan Sheet G01, Cover Sheet
1. Added Taxiway Pavement Strength callout.
B. Plan Sheet G02, Summary of Quantities and Sheet Index
1. Updated the Summary of Quantities to match the Revised Bid Form.
III. Specification Revisions
A. KSA Specification Item 105, Safety and Security
1. Delete this item in its entirety and replace with the attached KSA Specification Item 105, Safety and Security shown as Addendum No. 1 in the footer. Revised to show payment for Barricades for Pavement Closure as Linear Foot instead of Lump Sum.
IV. Contractor Questions
A. Lime Treated Subgrade P-155-2.4 Soil states this work shall of onsite materials with a sulfate content less than 0.3%. I do not see in the Geotech where the soils were tested for sulfate content. Can you confirm onsite materials meet this requirement?
1. Answer: Sulfate content of the subgrade will be tested at the beginning of construction. If sulfates exceed the allowable limit, a contract modification will be negotiated.
B. Lime Treated Subgrade P-155-6.7 Finishing & Curing states the completed shall be moist cured for min 7 days but not more than 14days without protection. Will prime coat suffice as protection for lime treated subgrade?
1. Answer: A prime coat will be allowed as protection if a lime stabilized subgrade must be left exposed for more than 14 days before placement of the following paving layer. The cost of the prime coat will be solely the Contractor’s responsibility.
Addendum No. 1 05/12/2026
V. Attachments
A. Revised Bid Form
B. Revised Plan Sheet G01, Cover Sheet
C. Revised Plan Sheet G02, Summary of Quantities and Sheet Index
D. KSA Specification Item 105, Safety and Security
E. Pre-Bid Meeting Minutes
F. Pre-Bid Meeting Sign In
Addendum No. 1 Issued By:
KSA
Clayton Scales P.E.
Senior Project Manager
TBPE Firm Registration No. F-1356
KSA
Trevor Self P.E.
Project Manager
TBPE Firm Registration No. F-1356
N
C E
TREVOR M. SELF
ILF
O
E
SS
IO
R P
I N
ENS ED
G
AL NE
E R
O
S
T
TA
E
SA
EXTF
139151
05/12/2026
DALHART MUNICIPAL AIRPORT
DALHART, TEXAS
APRON AND TAXIWAY
RECONSTRUCTION PROJECT
TxDOT CSJ No. 2604DHART KSA PROJECT No. 103412
ISSUED FOR BID ADDENDUM No. 1
FEBRUARY 2026
RECOMMENDED BY:
KSA ENGINEERS, INC
TBPE FIRM REGISTRATION No. F-1356
CLAYTON SCALES, P.E. 05/12/2026
SENIOR PROJECT MANAGER
TREVOR SELF 05/12/2026
PROJECT MANAGER
\\ksa.net\gateway\Projects\103412\008 CAD\30 Sheets\02 Civil\103412-AV-GI-COVR.dwg : COVER SHEET
LOCATION MAP
PROJECT
LOCATION
VICINITY MAP
Q
MAYOR
JAMES STROUD
CITY COUNCIL MEMBERS
ROGER FLEMING
TERRY STEGALL
CLINTON HALE
GARY SCHNIEDERJAN
BRUNO DeMOTS
DENNIS ROJAS
TY HANCOCK
GARY MESSER
CITY MANAGER
JJ OZNICK
AIRPORT MANAGER
HERB FERRELL
600 S. Tyler St., Suite 1625 Amarillo, TX 79101 T. 877.572.3647 www.ksaeng.com
AMARILLO
N
C E
CLAYTON A. SCALES
ILF
O
E
SS
IO
R P
IN
ENS ED
G
AL NE
E R
O
S
T
TA
E
SA
EXTF
95882
N
C E
TREVOR M. SELF
ILF
O
E
SS
IO
R P
IN
ENS ED
G
AL NE
E R
O
S
T
TA
E
SA
EXTF
139151
The taxiway pavement which is specified in this plan set for construction is designed to accommodate aircraft of gross weight (i.e. total takeoff weight) of 30,000 lbs or less.
REVISED PER ADDENDUM NO.1 05/121
G02
SU
M
M
AR
Y O
F Q
U
AN
TI
TI
ES
AN
D S
H
EE
T
IN
D
EX
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
SH
EE
T
N
AM
E:
PR
O
JE
C T
N
AM
E:
SEAL:
TBPE Firm Registration No. F-1356
SHEET NO.
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
2\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
2-
AV
-G
I-S O
Q _I
N D
EX
.D
W G
SU
M M
AR
Y
O F
Q U
AN
TI
TI
ES
A N
D S
H
EE
T
IN
D
EX
5/
/2
- 1 1:
A
M
LA
ST
S
AV
ED
B
Y:
C
C O
U N
TS
C B
C S
/1
2/
D
AL
H
AR
T M
U N
IC
IP
AL
AI
R
PO
R T
AP
R
O N
A N
D T
AX
IW
AY
R
EC
O
N
ST
R U
C
TI
O N
P R
O
JE
C T
D
AL
H
AR
T, T
EX
AS
S.
T yl er
S t., S ui te
Am ar illo , T
X
T.
.3
.1 w w w .k sa en g.
co m
N
C E
TREVOR M. SELF
ILF
O
E
SS
IO
R P
I N
ENS ED
G
AL NE
E R
O
S
T
TA
E
SA
EXTF
139151
INDEX OF SHEETS
SHEET NUMBER SHEET TITLE
GENERAL INFORMATION SHEETS
G01 COVER SHEET
G02 SUMMARY OF QUANTITIES AND SHEET INDEX
G03 GENERAL NOTES
G04 CONSTRUCTION SAFETY PHASING PLAN I
G05 CONSTRUCTION SAFETY PHASING PLAN II
G06 CONSTRUCTION SAFETY PHASING PLAN III
G07 CONSTRUCTION SAFETY PHASING PLAN IV
G08 EXISTING PAVEMENT SECTION DATA & BORE
LOGS
CIVIL SHEETS
C01 PROJECT LAYOUT
C02 PHASING PLAN - PHASE 1A
C03 PHASING PLAN - PHASE 1B
C04 PHASING PLAN - PHASE 1C
C05 PHASING DETAILS
C06 DEMOLITION PLAN
C07 RECONSTRUCTION PLAN I
C08 PAVING DETAILS
C09 JOINT LAYOUT PLAN - PHASE I
C10 JOINT LAYOUT PLAN - PHASE II
C11 JOINT LAYOUT PLAN - PHASE III
C12 JOINT DETAILS
C13 POINT LAYOUT PLAN I
C14 POINT LAYOUT PLAN II
C15 POINT LAYOUT PLAN III
C16 POINT LAYOUT PLAN IV
C17 POINT LAYOUT PLAN V
C18 STORM WATER POLLUTION PREVENTION
PROGRAM
C19 STORM WATER POLLUTION PREVENTION
PROGRAM LAYOUT PLAN
C20 STORM WATER POLLUTION PREVENTION
PROGRAM DETAILS
C21 MARKING PLAN
C22 MARKING DETAILS
R
EV
IS
ED
P
ER
A
D D
EN
D
U M
N O
.1
5/
Base Bid Group No. 1 - General Project Items for Reconstruction of Apron & Taxiway
Item Spec. Estimated Actual
No. No. Description Units Quantity Quantity
1.01 C-100a Contractor Quality Control Program (CQCP- Base Bid) LS 1
1.02 C-102-5.1b Stabilized Construction Exit EA 1
1.03 C-105a Mobilization (Base Bid) LS 1
1.04 KSA-105-3.1a Barricades for Pavement Closures (Base Bid) LF 3,000
Base Bid Group No. 2 - Reconstruct Parallel Taxiway - Section 1 (South to North)
Item Spec. Estimated Actual
No. No. Description Units Quantity Quantity
2.01 C-102-5.1a Installation and Removal of Silt Fence LF 1,330
2.02 P-101-5.1 Concrete Pavement Removal SY 7,189
2.03 P-101-5.2 Full Depth Pavement Repair SY 139
2.04 P-101-5.3 Concrete Spall Repair SF 210
2.05 P-155-8.1 6" Lime-Treated Subgrade SY 7,189
2.06 P-155-8.2 Lime (3%) TON 56
2.07 TxDOT 360-6.1 8" PCC Pavement SY 7,189
Base Bid Group No. 3 - Marking Removal and Replacement for Entire Reconstructed Project Area
Item Spec. Estimated Actual
No. No. Description Units Quantity Quantity
3.01 P-620-5.1a Pavement Marking Removal SF 6,514
3.02 P-620-5.1b Yellow Reflective Pavement Markings SF 4,527
3.03 P-620-5.1c Black Non-Reflective Pavement Markings SF 8,714
3.04 P-620-5.1d New Pavement Surface Preparation LS 1
Base Bid Group No. 4 - Marking Removal from Taxiway A to Jet A Fuel Tank
Item Spec. Estimated Actual
No. No. Description Units Quantity Quantity
4.01 P-620-5.1a Pavement Marking Removal SF 3,515
Additive Alternate No.1 - Reconstruct Parallel Taxiway - Section 2 (South to North)
Item Spec. Estimated Actual
No. No. Description Units Quantity Quantity
A - 1.01 C-100b Contractor Quality Control Program (CQCP – Add. Alt. No.1) LS 1
A - 1.02 C-102-5.1a Installation and Removal of Silt Fence LF 360
A - 1.03 C-105b Mobilization (Add. Alt. No.1) LS 1
A - 1.04 P-101-5.1 Concrete Pavement Removal SY 1,370
A - 1.05 P-101-5.2 Full Depth Pavement Repair SY 89
A - 1.06 P-101-5.3 Concrete Spall Repair SF 50
A - 1.07 P-155-8.1 6" Lime-Treated Subgrade SY 1,370
A - 1.08 P-155-8.2 Lime (3%) TON 11
A - 1.09 TxDOT 360-6.1 8" PCC Pavement SY 1,370
A - 1.10 KSA-105-3.1b Barricades for Pavement Closures (Add. Alt No.1) LF 520
Additive Alternate No.2 - Reconstruct Parallel Taxiway - Section 3 (South to North)
Item Spec. Estimated Actual
No. No. Description Units Quantity Quantity
A - 2.01 C-100c Contractor Quality Control Program (CQCP – Add. Alt. No.2) LS 1
A - 2.02 C-102-5.1a Installation and Removal of Silt Fence LF 320
A - 2.03 C-105c Mobilization (Add. Alt. No.2) LS 1
A - 2.04 P-101-5.1 Concrete Pavement Removal SY 989
A - 2.05 P-101-5.2 Full Depth Pavement Repair SY 56
A - 2.06 P-101-5.3 Concrete Spall Repair SF 30
A - 2.07 P-155-8.1 6" Lime-Treated Subgrade SY 989
A - 2.08 P-155-8.2 Lime (3%) TON 8
A - 2.09 TxDOT 360-6.1 8" PCC Pavement SY 989
A - 2.10 KSA-105-3.1c Barricades for Pavement Closures (Add. Alt No.2) LF 370
KSA-105-1 – Addendum No.1
ITEM KSA-105 SAFETY AND SECURITY – Addendum No.1
DESCRIPTION
105-1.1 All work shall comply with the Construction Safety & Phasing Plan (CSPP), included as an appendix, and incorporated into this contract. Required reference material associated with this item includes:
FAA AC 150/5200-18 (Latest Edition), Airport Safety Self-Inspection FAA AC 150/5210-5 (Latest Edition), Painting, Marking and Lighting of Vehicles Used on an Airport FAA AC 150/5370-2 (Latest Edition), Operational Safety on Airports During Construction
Copies of these FAA documents are available at https://www.faa.gov/airports/resources/advisory_circulars/.
The work covered by this section consists of furnishing all materials, equipment, and labor and performing all necessary operations to comply with the phasing plans and CSPP, including, but not limited to, all barricades, marking and lighting associated with construction safety and phasing and traffic control.
105-1.2 BARRICADES AND MARKING. Proper marking, barricading and lighting of areas on the airfield associated with the construction shall be the responsibility of the Contractor. This will include properly marking, barricading and lighting closed runways, taxiways, taxilanes, and aprons, the limits of construction, critical areas on the airfield, material storage areas, equipment storage areas, haul routes, parking areas and other areas defined as required for the Contractor's exclusive use. The Contractor shall erect and maintain around the perimeter of these areas suitable marking and warning devices visible for day and night use.
Temporary barricades, flagging, and flashing warning lights shall be required at critical access points. The type and location of marking and warning devices will be approved by the Engineer. The Contractor shall be responsible for maintaining the barricades, lights, markings in their proper location, in good working order, and clean for 24 hours per day throughout the contract period.
The Contractor may be required to remove barricades and/or taxiway closure markings at the end of the work period and to reinstall the same prior to commencing work the following day in some cases to allow for the reopening of certain sections of the airport for operations outside of Contractor working hours. Removal of the barricades, and/or moving of the barricades per project phasing, shall be considered subsidiary to this project item.
Special emphasis shall be given to open trenches, excavations, heavy equipment marshalling areas, and stockpiled material located in the airport operations area, which shall be predominantly marked by the Contractor with flags and lighted by approved light units during hours of restricted visibility and darkness.
105-1.3 SAFETY PLAN COMPLIANCE DOCUMENT. Preparation of the Safety Plan Compliance Document (SPCD), as required by AC 150/5370-2G Operational Safety on Airports During Construction, will be included under this section.
METHOD OF MEASUREMENT
105-2.1 Measurement for barricades and markings will be by the linear foot as the barricades are installed and accepted in place.
105-2.3 Any work identified in this item for which there is not a specific pay item, including the Safety Plan Compliance Document, will not be measured for payment but shall be considered subsidiary to other items in the contract.
https://www.faa.gov/airports/resources/advisory_circulars/
KSA-105-2 – Addendum No.1
BASIS OF PAYMENT
105-3.1 All work performed and materials furnished as prescribed in this item shall be measured and paid for at the contract lump sum price for “Barricades for Pavement Closures”
The lump sum for “Barricades and Markings” shall be paid pro-rata per month and the monthly amount shall be calculated by dividing the lump sum by the contract time in months. The final payment for “Barricades and Markings” shall not be made until all substantial work has been completed by the Contractor, as determined by the engineer, and the Contractor has demobilized from the project site.
Payment will be made under:
Item 105-3.1a Barricades for Pavement Closures (Base Bid) Per linear foot Item 105-3.1b Barricades for Pavement Closures (Add. Alt No.1) Per linear foot Item 105-3.1c Barricades for Pavement Closures (Add. Alt No.2) Per linear foot
END OF ITEM KSA-105
Pre-Bid Meeting
Airport: Dalhart Municipal Airport
Date: Tuesday May 6, 2026
Project: Apron and Taxiway Reconstruction
Organizer: KSA Engineers, Inc.
KSA Project No.: 103412
Client Project No.: 2604DHART
I. Sign In Sheet
II. Introductions and Roles
A. J.J. Oznick – City Manager
B. Herb Ferrell – Airport Manager
C. Steve Harp, Project Manager, TxDOT Aviation
D. Kelle Chancey, Grants, TxDOT Aviation
E. Eli Lopez, DBE/HUB, TxDOT Aviation
F. Clayton Scales, Project Manager, KSA
III. Bidding Procedures
A. See Notice to Bidders and Instructions to Bidders section in Contract Documents for bidding information.
B. All bidders are encouraged to review all contract documents including Mandatory Federal Contract
Provisions, TxDOT General Provisions, Special Provisions, and Project Specifications.
C. Technical questions/comments should be submitted to Clayton Scales, (cscales@ksaeng.com or
806.335.1600). Questions must be in writing.
D. For bid document questions or other information visit the TxDOT Aviation website or call TxDOT, Kelle
Chancey at 512.633.0253. Questions must be submitted by 4 pm on Tuesday 5/12/26.
E. Sealed bids for the construction of airport improvements at the Dalhart Municipal Airport are to be delivered to Kelle Chancey, TxDOT Aviation Division, 6230 E. Stassney Lane, 2nd Floor, Austin, Texas 78744 by
Wednesday, May 20, 2026, at 2:00 p.m. At that time, bids will be publicly opened and read aloud. Any bid received after closing time will be returned unopened.
F. Bid Proposal
1. Bidders must utilize the bid proposal form provided on TxDOT’s website.
2. Bidders must provide pricing for the Base Bid and All Additive Alternate Bids. The contract award will be based on the lowest qualified bid.
G. Each bid should be furnished with a Bidder Qualifications as stated in the Contract Documents.
H. Bidder shall reference the Aviation Division General Construction Contract Provisions.
1. http://txdot.gov/inside-txdot/division/aviation/general-provisions.html
I. Contract will be awarded within __60__ calendar days from bid opening.
May 6, 2026
J. Federally funded project
1. The DBE Goal is 0%. Questions regarding DBE Goal and Good Faith Efforts should be directed to
TxDOT, Eli Lopez at 512-416-4506.
2. In accordance with 49 CFR Part 26.53 the bidder/offeror must submit an acceptable DBE plan and commitment or good faith effort no later than 5 calendar days after bid opening as a matter of responsibility.
3. The EEO Goal is:
a. 11.0% for minority participation in each trade
b. 6.9% for female participation in each trade
4. Wage rate requirements will be required as shown in the Contract Documents.
5. Buy American – Steel and Manufactured Products for Construction Contracts.
IV. Scope of Work
A. Base Bid and Alternates
1. Base Bid – Taxiway Reconstruction
2. Additive Alternate No. 1 – Additional Taxiway Reconstruction
3. Additive Alternate No. 2 – Additional Taxiway Reconstruction
B. Can visit site after the meeting.
V. Site Access / Staging Areas
A. Primary site access will be from Airport Lane, as shown on plans.
B. Staging Area is in northwest corner of the airport.
VI. Construction Safety and Phasing Plan
A. Contractor will be required to comply with FAA Advisory Circular 150/5370-2G, Operational Safety on Airports
During Construction.
1. Phase 1A: TW A/D Intersection
2. Phase 1B: TW A
3. Phase 1C: TW C/A Intersection
B. Other phasing will be considered after award, but must meet the intent of the existing phasing plans and must not significantly increase the impacts to aircraft operations.
C. Contract will be required to comply with the construction safety phasing plan on sheets G04 through G07 of the plans.
D. Safety Plan Compliance Document will be required by the Contractor. SPCD is project specific.
VII. Other Information
A. Contract Time – Will be updated in Addendum 1
1. Base Bid: 90 Calendar Days
2. Additive Alternate No. 1: 10 Calendar Days
3. Additive Alternate No. 2: 10 Calendar Days
B. Materials Acceptance by Owner / Materials Quality Control by Contractor
C. Protection of any existing utilities in the project area is the responsibility of the Contractor. Engineer has
May 6, 2026 endeavored to show all known utilities within the Contract documents, but this shall not relieve the
Contractor from full responsibility in anticipating all underground obstruction, whether or not shown on the plans; Contractor should call for utility locates and verify locations of all utilities prior to starting construction.
D. SW3P – Contractor Responsibility
E. No retainage on project. Payment will be made up to 95% of the contract amount or installed work items if over or under the current contract before final acceptance.
F. Any addenda issued will be available on TxDOT’s website.
Pre-Bid Notes:
Contract time will be updated in Addendum 1
Liquidated damages are included in the contract at $1,000/day for each calendar day to complete the work beyond the allotted time
Contract Documents and Specifications, Special Provisions, SP-4 (front end specification document) states that “on contracts equal to or greater than $500,000, the prime contractor shall perform work with its own organization on at least
30% of the total original contract cost”
File details come from the government source that posted it. Updated .