Specifications for FY 2019 Small Boat Repair NOAA Ship RAINIER

Item 16330: Anode Replacement NOAA FY20 Rainier Small Boat Repairs

13AUG2019

NOAA Ship Rainier

Small Boat Repairs

FY 2020

STATEMENT OF WORK

September 24, 2019

1. BACKGROUND: NOAA’s research and survey ships comprise the largest fleet of federal research ships in the Nation. Ranging from large oceanographic research vessels capable of exploring the world’s deepest ocean, to smaller ships responsible for charting the shallow bays and inlets of the United States, the fleet supports a wide range of marine activities including fisheries research, nautical charting, and ocean and climate studies. In addition to its ships, the NOAA Small Boat Program manages a fleet of more than 400 small boats that perform various data collection missions for NOAA throughout the United States and its territories including hydrographic surveys, fishing, diving, scientific instrument deployment/recovery, water and air quality monitoring, law enforcement and marine mammal surveys. Vessels vary in size from a simple 10-ft. kayak to a complex 85-ft. research vessel. The majority of small boats fall within the range of 16-26 feet in length and operate in near-shore environments, but extended missions in deep water environments are common among the larger vessels.

The NOAA small boats included in this Statement of Work (SOW) are carried aboard the NOAA Ship Rainier (S 221), commissioned in 1967, as survey assets. The ship is homeported in Newport, OR and her primary mission is conducting hydrographic surveys in support of nautical charting.

2. SCOPE

2.1 This specification contains the general requirements for work performed by the Small Boats Repair Contractor (Contractor) for the NOAA Ship Rainier’s eight small boats. These general requirements apply to all work items contained in this contract including care of the boats, sea trials, and services provided to the boats during the contract

2.2 Work under this contract will be performed at the Contractor’s facility. NOAA will transport the boats to/from Mare Island Dry Dock to/from a Contractor’s facility within 30NM. Transportation beyond 30NM would be the responsibility of the contractor and at the contractor’s expense.

2.3 The period of performance for the work items of this SOW is from time of award (Anticipated award date October 15) to January 6th, 2020. Access to dry storage and pier space for the boats associated with this contract is requested through February 18th 2020.

2.4 There are eight (8) small boats covered under this Scope of Work with the following characteristics:

2.4.1. RA-1 – 22 foot SOLAS Zodiac Hurricane, manufactured in 2012, 4,400 lbs condition ‘B’ weight, Hull ID Number XDC66398A212, Aluminum RHIB with air collar, Steyr SE236E40 diesel engine and jet propulsion.

2.4.2. RA-2 – 27 foot North River Liberty, manufactured in 2013, 3.75LT (7504 #) Displacement, Hull ID Number NOAA2701, Aluminum RHIB with hybrid air/foam collar, Yanmar 8LV350C 350 HP engine.

2.4.3. RA-3 – 30 foot All American Marine 30 HSL Hydrographic Survey Launch, manufactured in 2008, 7 LT (15500 #) Displacement, Hull Number 2803, Aluminum Hull, Cummins 500HP engine, Cummins/Onan 5kw Marine Diesel Genset.

2.4.4. RA-4 – 30 foot All American Marine 30 HSL Hydrographic Survey Launch, manufactured in 2008, 7 LT (15500 #) Displacement, Hull Number 2801, Aluminum Hull, Cummins 500HP engine, Cummins/Onan 5kw Marine Diesel Genset.

2.4.5. RA-5 – 30 foot All American Marine 30 HSL Hydrographic Survey Launch, manufactured in 2008, 7 LT (15500 #) Displacement, Hull Number 2802, Aluminum Hull, Cummins 500HP engine, Cummins/Onan 5kw Marine Diesel Genset.

2.4.6. RA-6 - 30 foot All American Marine 30 HSL Hydrographic Survey Launch, manufactured in 2008, 7 LT (15500 #) Displacement, Hull Number 2804, Aluminum Hull, Cummins 500HP engine, Cummins/Onan 5kw Marine Diesel Genset.

2.4.7. RA-7 – 19 foot Willard Roustabout, manufactured in 2016, 3,250 lbs condition ‘B’ weight, Hull ID Number WLDT0001J616, Aluminum monohull utility boat, Yamaha 4 stroke 200 HP outboard.

2.4.8. RA-8 – 19 foot Monarch Roustabout, manufactured in 2000, 1850 lbs condition ‘B’ weight, Hull ID Number SAMA1087k999, Aluminum monohull utility boat, Yamaha 4 stroke 200 HP outboard.

2.5 RA-3, 4, 5, and 6 are collectively referred to as ‘HSLs’.

3. REFERENCES

3.1 American Boat and Yacht Council (ABYC) Standards and Technical Information Reports for Small Craft

4. REQUIREMENTS

4.1 Extra care shall be taken when hauling and blocking HSLs to prevent placing a load on the sonar transducer heads. Travel-lift straps may be placed aligning with gripe guides along the side of the hull. Transducer heads must be removed or otherwise protected prior to pressure washing.

4.2 Following completion of work and prior to acceptance, all work areas shall be restored to the same condition of cleanliness and serviceability as they were upon the boats arrival.

4.3 Upon receipt of the vessel the contractor will accept full responsibility for the safety of the vessel, including but not limited to fire protection, security, water-tight integrity, and protection from adverse environmental conditions, etc. This responsibility will terminate only after all work defined herein (or added during the work period) is complete, accepted by NOAA, and NOAA personnel receive the vessel.

4.4 NOAA employees and contractors may be working on board the vessel during the contract performance period on a not to interfere basis. During this period it will be required that these personnel have access to the vessel during normal working hours.

4.5 Report any necessary repairs outside the scope of this statement of work, or faults identified during inspection or testing, to the contracting officer.

4.6 Protective Coverings

4.6.1. Utilize foreign material exclusion barriers (FMEs) or protective coverings to protect all compartments, machinery, equipment, deck coverings, furnishings, insulation, glass, cables, piping systems, coatings, structures, and other vessel components from damage and from entry of dust, dirt, grit, sand, and other foreign particles.

4.6.2. All damage and contamination resulting from failure to provide adequate protection shall be repaired and cleaned by the Contractor at the Contractor’s expense to re-establish the condition which existed at the start of the work.

4.6.3. After completion of all other work, remove and dispose of all protective coverings along with any adhesive residue used to hold coverings in place.

4.7 Interferences and Restorations

4.7.1. Remove all interferences and obstructions necessary to complete the required work. This shall include the disassembly and removal of machinery, piping, ducts, cable, wiring, insulation, structures, and anything else which interferes with the proper accomplishment of work. Except as otherwise specified, this does not include relocations made necessary by new installations which physically prevent an interference from being returned to its existing location.

4.7.2. Restore all interferences to their existing configuration and condition. Install new gaskets and fasteners. In place of material which is rendered unsuitable for reinstallation during removal or storage, provide and install new materials which are equal in composition, strength, design, type, and size as existed prior to removal. All insulation removed or damaged shall be renewed with new insulation.

4.7.3. Align and conduct strength, tightness, and operational tests to ensure that the reinstalled interferences safely perform their normal functions.

4.7.4. The Contractor shall be responsible for identifying all interferences involved in accomplishing required work. Interferences are not normally identified in the detail specifications of the work item.

4.8 Gaskets, Packing, and Seals - Whenever the Contractor performs work which disturbs existing gaskets, packing, or seals, new gaskets, packing, and seals of same material as existing shall be installed unless otherwise specified.

4.9 Departure Trials and Testing - Upon completion of work all systems that were worked on shall be tested per manufacturer’s recommendation and to demonstrate satisfactory system performance in normal operating conditions.

4.10 Disposal of Fluids - Whenever work requires that equipment, machinery, piping, or tanks be drained of fluids, the Contractor shall be responsible for draining and proper disposal of the fluid in accordance with local, state, and federal regulations. If the Contractor drains the fluid into the boat's bilges, the Contractor shall pump all fluid from the applicable bilges into tanks and properly dispose of the fluid, including the fluid that existed prior to and the fluid that accumulates between the time the equipment, machinery, piping or tanks were drained and the time the bilges have been pumped dry by the Contractor. The cost of this should be included in the specific work items. A written record shall be provided to a NOAA representative at the completion of the contract, documenting quantity and type of fluids disposed of and receiving authority (ie company that took possession of the fluids).

4.11 Disassembly and Inspections. Whenever equipment, machinery, systems, or other system components are required to be disassembled, opened or overhauled, the contractor shall complete all disassembling and inspections during the first 25-percent of the work performance period. All tanks required to be opened shall also be opened and gas-freed during the first 25-percent of the work performance period. No time extension of the work performance period will be granted for delays caused by the contractor's failure to comply with this 25-percent time requirement. The 25-percent time requirement is calculated by multiplying the total number of work days proposed in the Contractors schedule by 0.25 and rounding up to the next whole number then adding that number of days to the scheduled start date not counting weekends or holidays not worked.

5. ACCEPTANCE

5.1 Upon completion, NOAA will conduct acceptance testing at the Contractor’s facility.

5.2 Upon acceptance, NOAA will transport vessels from the Contractor’s facility to Mare Island Dry Dock.

6. GOVERNMENT FURNISHED MATERIAL

As specified in specific tasks.

7. NOTES

The requirements and provisions of this specification are additions to or amplification of the requirements and provisions set forth in other specifications, solicitation, or procurement documents. In the event a conflict should occur, the requirements of the other documents take precedence over those contained here.

Work Items

1. Haul and block all 8 small boats with a minimum of 2 keel blocks (no less than 8 inches in length) and 4 jack stands per vessel in accordance with industry best practices.

1.1. Pressure wash all hulls immediately after removal from water

1.2. NOAA representative to be present for blocking

1.3. All vessels will be provided 120VAC 60HZ shore power while stored on blocks

1.4. All intended weather barriers will be maintained and bilges maintained in a clean and dry condition.

2. For all HSLs:

2.1. Conduct ultrasonic hull thickness testing on hull plating in shaft tunnel of HSLs. Take measurements on 2x2 inch grid and at points exhibiting most severe pitting.

2.2. Inspect hull interior and exterior for damage, excessive wear or corrosion including thru hull openings.

2.3. Bottom Paint

2.3.1. These vessels hull exterior has never been painted. Due to fouling, NOAA has decided to apply antifouling bottom paint to 6 inches above the waterline.

2.3.2. After the vessel has been cleaned and any hull repairs/inspections are complete, the contractor shall apply 2 coats (approximately 3 gallons) of ePaint EP-PRIME 1000 Epoxy Primer (or similar) (white) and 2 coats (approximately 3 gallons) of ePaint SN-1 Antifouling Paint (or similar)(grey). Paint used shall be purpose designed for marine aluminum in seawater.

2.3.3. Manufacturer’s procedures will be used to apply the paint, if thinning is required to adjust viscosity of a coating, only approved thinners may be used per manufacturer’s recommendations.

2.4. Remove propeller, conduct inspection and diagnosis at propeller repair facility, reshape propeller to match hub stamp data, reinstall propeller.

2.5. Install insulated sheet metal air conditioning ducting in crew cabin and coxswain area to replace existing soft ducting.

2.6. Replace shaft cutlass bearings

2.7. Install scoop style thru hull fitting for independent air conditioning raw water intake. NOAA representative shall approve location of thru hull prior to starting work.

2.8. Inspect engine compartment and lazerette hatch gaskets.

2.9. Replace Henriksen hooks. Replacement hooks to be provided by NOAA, this work item is for labor only. Each HSL has QTY (2) hooks connected with an interlock cable.

2.10. Inspect shaft lip seals.

2.11. Perform annual service of Fireboy fixed extinguishers.

2.12. Remove inverters from lazerette and install in engine room as close as practical to battery bank to minimize cable length. Shorten and reinstall existing cables to match new location. All electrical work to comply with ABYC standards referenced above. NOAA representative to review and approve new mounting location prior to starting work.

2.13. Remove, inspect, and reinstall HSL seawater supply valves (seacocks, 2 in each HSL).

2.13.1. Photo-document flanges prior to reinstalling valves

2.14. Test HSL fuel isolation valves remote operators located adjacent to helm chair.

2.14.1. Test results provided to NOAA rep. within first 25% of contract period of performance

3. OEM or factory trained service technician inspect and provide service report for each engine. and generator in all boats within first 25% of contract period of performance.

3.1. HSLs are equipped with Cummins/Onan 5kw marine diesel gensets, other boats are not equipped with generators

4. Inspect engine and hull zinc anodes for all boats, replace if worn greater than 50%

5. Renew engine coolant for all boats with OEM approved engine coolant.

6. Renew raw water impeller for all boats.

7. Inspect all flex hoses in all boats for damage or excessive wear, submit list of hoses recommended for replacement, with estimate, to contracting officer.

8. Renew transmission fluid and filter on all boats.

8.1. Use OEM approved replacement filter and fluid.

9. Remove, clean, pressure test, and reinstall main engine seawater heat exchanger in all boats.

10. For RA-1 – This vessel is a SOLAS Rescue Boat

10.1. Leak check and inspect Hamilton jet steering pump

10.2. Inspect and test roll-over recovery bladder in accordance with OEM instructions including inflating and leak checking the bladder and weighing the CO2 cylinder.

10.3. Replace batteries (QTY 3).

10.4. Replace RACOR housing and filter.

10.5. Inspect Hamilton jet impeller and internal jet zincs.

10.6. Replace engine oil and filter with new OEM approved fluid and replacement filter.

10.7. Replace engine primary fuel filter with new OEM approved filter.

11. For RA-2

11.1. Replace transmission aft main seal to address leakage

11.2. OEM or factory trained technician provide service to Hamilton Jet including general inspection of impeller and tunnel and replacing internal and external zincs.

11.3. Complete annual inspection/service of Fireboy fixed fire extinguisher.

11.4. Replace Henriksen hook cable with correct size. Longer cable was used as spare to replace damaged cable and should be returned to Henriksen following changout.

11.5. Modify hand rail to add hinged gate for easier access in cradle.

11.6. Relocate LiDAR transponder to starboard side

12. For RA-3 and RA-6, replace Coxswain helm chairs with model Shockwave S5 or similar.

13. For RA-5, replace oil hose on port side by fuel heat exchanger.

14. For RA-7, OEM or factory trained technician to inspect timing belt, replace thermostat, inspect pressure control valve, and change lower unit gear oil.

15. For RA-8, OEM or factory trained technician to inspect timing belt, replace thermostat, inspect pressure control valve, replace raw water impeller, conduct valve adjustment, and change lower unit gear oil.