About this file
From the source
NIH A-E Fee Spreadsheet
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
SUMMARY
| Architect-Engineer Fee Estimate/Proposal, Base Year | | | | | | |
| Architect-Engineer: | | | | Project Officer: | | |
| Project Title: | | | | | | |
| Task Order No.: | | | | Date: | | |
| Summary | | | | | | |
| Line No. | Service | Hours | | Hourly Rate | Extended Costs | |
| | A/E | EST | | A/E | EST |
| I. | Pre-Design Phase Services | 0 | 0 | $0.00 | $0.00 |
| II. | Design Phase Services | 0 | 0 | $0.00 | $0.00 |
| III. | Post-Design Phase Services | 0 | 0 | $0.00 | $0.00 |
| IV. | Total Project Costs (I+II+III) | 0 | 0 | $0.00 | $0.00 |
PRE DESIGN
| Architect-Engineer Fee Estimate/Proposal, Base Year | | | | | | |
| Architect-Engineer: | | | Project Officer: | | | |
| Project Title: | | | | | | |
| Task Order No.: | | | Date: | | | |
| I - Pre-Design Phase Services | | | | | | |
| Line No. | Discipline | Hours | | Hourly Rate | Extended Costs | |
| | A/E | EST | | A/E | EST |
| Salary Costs | | | | | |
| Architectural | | | | | |
| 1a. | Principal | | | | $0.00 | $0.00 |
| 1b. | Project Architect | | | | $0.00 | $0.00 |
| 1c. | Designer (Intern/Assoc Arch) | | | | $0.00 | $0.00 |
| 1d. | Drafter | | | | $0.00 | $0.00 |
| 1e. | Spec Writer | | | | $0.00 | $0.00 |
| 1f. | Estimator | | | | $0.00 | $0.00 |
| 1g. | Typist | | | | $0.00 | $0.00 |
| 1h. | | | | | $0.00 | $0.00 |
| 1. | Architectural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Civil (Site) | | | | | |
| 2a. | Principal | | | | $0.00 | $0.00 |
| 2b. | Project Engineer | | | | $0.00 | $0.00 |
| 2c. | Civil Engineer | | | | $0.00 | $0.00 |
| 2d. | Designer | | | | $0.00 | $0.00 |
| 2e. | Drafter | | | | $0.00 | $0.00 |
| 2f. | Spec Writer | | | | $0.00 | $0.00 |
| 2g. | Estimator | | | | $0.00 | $0.00 |
| 2h. | Typist | | | | $0.00 | $0.00 |
| 2i. | | | | | $0.00 | $0.00 |
| 2. | Civil (Site) Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Electrical | | | | | |
| 3a. | Principal | | | | $0.00 | $0.00 |
| 3b. | Project Director | | | | $0.00 | $0.00 |
| 3c. | Project Engineer | | | | $0.00 | $0.00 |
| 3d. | Electrical Engineer | | | | $0.00 | $0.00 |
| 3e. | Designer | | | | $0.00 | $0.00 |
| 3f. | Drafter | | | | $0.00 | $0.00 |
| 3g. | Spec Writer | | | | $0.00 | $0.00 |
| 3h. | Estimator | | | | $0.00 | $0.00 |
| 3i. | Typist | | | | $0.00 | $0.00 |
| 3k. | | | | | $0.00 | $0.00 |
| 3. | Electrical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Interior Design | | | | | |
| 4a. | Principal | | | | $0.00 | $0.00 |
| 4b. | Project Designer | | | | $0.00 | $0.00 |
| 4c. | Designer | | | | $0.00 | $0.00 |
| 4d. | Drafter | | | | $0.00 | $0.00 |
| 4e. | Spec Writer | | | | $0.00 | $0.00 |
| 4f. | Estimator | | | | $0.00 | $0.00 |
| 4g. | Typist | | | | $0.00 | $0.00 |
| 4h. | | | | | $0.00 | $0.00 |
| 4. | Interior Design Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Landscaping | | | | | |
| 5a. | Principal | | | | $0.00 | $0.00 |
| 5b. | Project Landscape Architect | | | | $0.00 | $0.00 |
| 5c. | Designer | | | | $0.00 | $0.00 |
| 5d. | Site Supervisor | | | | $0.00 | $0.00 |
| 5e. | Spec Writer | | | | $0.00 | $0.00 |
| 5f. | Estimator | | | | $0.00 | $0.00 |
| 5g. | Typist | | | | $0.00 | $0.00 |
| 5h. | | | | | $0.00 | $0.00 |
| 5. | Landscaping Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 6. | Salary Costs Page Subtotal (1+2+3+4+5) | 0 | 0 | | $0.00 | $0.00 |
| Mechanical | | | | | |
| 7a. | Principal | | | | $0.00 | $0.00 |
| 7b. | Project Director | | | | $0.00 | $0.00 |
| 7c. | Project Engineer | | | | $0.00 | $0.00 |
| 7d. | Mechanical Engineer | | | | $0.00 | $0.00 |
| 7e. | Designer | | | | $0.00 | $0.00 |
| 7f. | Drafter | | | | $0.00 | $0.00 |
| 7g. | Spec Writer | | | | $0.00 | $0.00 |
| 7h. | Estimator | | | | $0.00 | $0.00 |
| 7i. | Typist | | | | $0.00 | $0.00 |
| 7j. | | | | | $0.00 | $0.00 |
| 7. | Mechanical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Structural | | | | | |
| 8a. | Principal | | | | $0.00 | $0.00 |
| 8b. | Project Engineer | | | | $0.00 | $0.00 |
| 8c. | Structural Engineer | | | | $0.00 | $0.00 |
| 8d. | Designer | | | | $0.00 | $0.00 |
| 8e. | Drafter | | | | $0.00 | $0.00 |
| 8f. | Spec Writer | | | | $0.00 | $0.00 |
| 8g. | Estimator | | | | $0.00 | $0.00 |
| 8h. | Typist | | | | $0.00 | $0.00 |
| 8i. | | | | | $0.00 | $0.00 |
| 8. | Structural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 9a. | Principal | | | $0.00 | $0.00 |
| 9b. | Designer | | | $0.00 | $0.00 |
| 9c. | Drafter | | | $0.00 | $0.00 |
| 9d. | Spec Writer | | | $0.00 | $0.00 |
| 9e. | Typist | | | $0.00 | $0.00 |
| 9f. | Estimator | | | $0.00 | $0.00 |
| 9g. | | | | $0.00 | $0.00 |
| 9h. | | | | $0.00 | $0.00 |
| 9. | Subtotal | 0 | 0 | $0.00 | $0.00 |
| 10a. | Principal | | | $0.00 | $0.00 |
| 10b. | Designer | | | $0.00 | $0.00 |
| 10c. | Drafter | | | $0.00 | $0.00 |
| 10d. | Spec Writer | | | $0.00 | $0.00 |
| 10e. | Typist | | | $0.00 | $0.00 |
| 10f. | Estimator | | | $0.00 | $0.00 |
| 10g. | | | | $0.00 | $0.00 |
| 10h. | | | | $0.00 | $0.00 |
| 10. | Subtotal | 0 | 0 | $0.00 | $0.00 |
| 11. | Salary Costs Page Subtotal (7+8+9+10) | 0 | 0 | $0.00 | $0.00 |
| Salary Costs Previous Page Subtotal (line 6) | 0 | 0 | $0.00 | $0.00 |
| 12. | Pre-Design Salary Costs (11+6) | 0 | 0 | $0.00 | $0.00 |
| Miscellaneous Costs | | | | |
| 13a. | Reproduction | | | $0.00 | $0.00 |
| 13b. | Postage | | | $0.00 | $0.00 |
| 13c. | Survey | | | $0.00 | $0.00 |
| 13d. | Geotechnical | | | $0.00 | $0.00 |
| 13 | Miscellaneous Costs Subtotal | 0 | 0 | $0.00 | $0.00 |
| 14 | Total Costs - Pre-Design Phase (12+13) | 0 | 0 | $0.00 | $0.00 |
DESIGN
| Architect-Engineer Fee Estimate/Proposal, Base Year | | | | | | |
| Architect-Engineer: | | | Project Officer: | | | |
| Project Title: | | | | | | |
| Task Order No.: | | | Date: | | | |
| II - Design Phase Services | | | | | | |
| Line No. | Discipline | Hours | | Hourly Rate | Extended Costs | |
| | A/E | EST | | A/E | EST |
| Salary Costs | | | | | |
| Architectural | | | | | |
| 15a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 15b. | Project Architect | | | $0.00 | $0.00 | $0.00 |
| 15c. | Designer (Intern/Assoc Arch) | | | $0.00 | $0.00 | $0.00 |
| 15d. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 15e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 15f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 15g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 15h. | | | | | $0.00 | $0.00 |
| 15 | Architectural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Civil (Site) | | | | | |
| 16a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 16b. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 16c. | Civil Engineer | | | $0.00 | $0.00 | $0.00 |
| 16d. | Designer | | | $0.00 | $0.00 | $0.00 |
| 16e. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 16f. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 16g. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 16h. | Typist | | | $0.00 | $0.00 | $0.00 |
| 16i. | | | | | $0.00 | $0.00 |
| 16 | Civil (Site) Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Electrical | | | | | |
| 17a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 17b. | Project Director | | | $0.00 | $0.00 | $0.00 |
| 17c. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 17d. | Electrical Engineer | | | $0.00 | $0.00 | $0.00 |
| 17e. | Designer | | | $0.00 | $0.00 | $0.00 |
| 17f. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 17g. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 17h. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 17i. | Typist | | | $0.00 | $0.00 | $0.00 |
| 17j. | | | | | $0.00 | $0.00 |
| 17 | Electrical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Interior Design | | | | | |
| 18a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 18b. | Project Designer | | | $0.00 | $0.00 | $0.00 |
| 18c. | Designer | | | $0.00 | $0.00 | $0.00 |
| 18d. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 18e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 18f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 18g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 18h. | | | | | $0.00 | $0.00 |
| 18 | Interior Design Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Landscaping | | | | | |
| 19a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 19b. | Project Landscape Architect | | | $0.00 | $0.00 | $0.00 |
| 19c. | Designer | | | $0.00 | $0.00 | $0.00 |
| 19d. | Site Supervisor | | | $0.00 | $0.00 | $0.00 |
| 19e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 19f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 19g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 19h. | | | | | $0.00 | $0.00 |
| 19 | Landscaping Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 20 | Salary Costs Page Subtotal (15+16+17+18+19) | 0 | 0 | | $0.00 | $0.00 |
| Mechanical | | | | | |
| 21a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 21b. | Project Director | | | $0.00 | $0.00 | $0.00 |
| 21c. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 21d. | Mechanical Engineer | | | $0.00 | $0.00 | $0.00 |
| 21e. | Designer | | | $0.00 | $0.00 | $0.00 |
| 21f. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 21g. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 21h. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 21i. | Typist | | | $0.00 | $0.00 | $0.00 |
| 21j. | | | | | $0.00 | $0.00 |
| 21 | Mechanical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Structural | | | | | |
| 22a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 22b. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 22c. | Structural Engineer | | | $0.00 | $0.00 | $0.00 |
| 22d. | Designer | | | $0.00 | $0.00 | $0.00 |
| 22e. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 22f. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 22g. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 22h. | Typist | | | $0.00 | $0.00 | $0.00 |
| 22i. | | | | | $0.00 | $0.00 |
| 22 | Structural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 23a. | Principal | | | $0.00 | $0.00 |
| 23b. | Designer | | | $0.00 | $0.00 |
| 23c. | Drafter | | | $0.00 | $0.00 |
| 23d. | Spec Writer | | | $0.00 | $0.00 |
| 23e. | Typist | | | $0.00 | $0.00 |
| 23f. | Estimator | | | $0.00 | $0.00 |
| 23g. | | | | $0.00 | $0.00 |
| 23h. | | | | $0.00 | $0.00 |
| 23 | Subtotal | 0 | 0 | $0.00 | $0.00 |
| 24a. | Principal | | | $0.00 | $0.00 |
| 24b. | Designer | | | $0.00 | $0.00 |
| 24c. | Drafter | | | $0.00 | $0.00 |
| 24d. | Spec Writer | | | $0.00 | $0.00 |
| 24e. | Typist | | | $0.00 | $0.00 |
| 24f. | Estimator | | | $0.00 | $0.00 |
| 24g. | | | | $0.00 | $0.00 |
| 24h. | | | | $0.00 | $0.00 |
| 24 | Subtotal | 0 | 0 | $0.00 | $0.00 |
| 25 | Salary Costs Page Subtotal (21+22+23+24) | 0 | 0 | $0.00 | $0.00 |
| Salary Costs Previous Page Subtotal (line 20) | 0 | 0 | $0.00 | $0.00 |
| 26 | Design Salary Costs (25+20) | 0 | 0 | $0.00 | $0.00 |
| Miscellaneous Costs | | | | |
| 27a. | Reproduction | | | $0.00 | $0.00 |
| 27b. | Postage | | | $0.00 | $0.00 |
| 27c. | | | | $0.00 | $0.00 |
| 27d. | | | | $0.00 | $0.00 |
| 27 | Miscellaneous Costs Subtotal | 0 | 0 | $0.00 | $0.00 |
| 28 | Total Costs - Design Phase (26+27) | 0 | 0 | $0.00 | $0.00 |
POST DESIGN
| Architect-Engineer Fee Estimate/Proposal, Base Year | | | | | | |
| Architect-Engineer: | | | Project Officer: | | | |
| Project Title: | | | | | | |
| Task Order No.: | | | Date: | | | |
| III - Post-Design Phase Services | | | | | | |
| Line No. | Discipline | Hours | | Hourly Rate | Extended Costs | |
| | A/E | EST | | A/E | EST |
| Submittals | | | | | | |
| Salary Costs | | | | | |
| Architectural | | | | | |
| 29a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 29b. | Project Architect | | | $0.00 | $0.00 | $0.00 |
| 29c. | Designer (Intern/Assoc Arch) | | | $0.00 | $0.00 | $0.00 |
| 29d. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 29e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 29f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 29g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 29h. | | | | | $0.00 | $0.00 |
| 29 | Architectural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Civil (Site) | | | | | |
| 30a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 30b. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 30c. | Civil Engineer | | | $0.00 | $0.00 | $0.00 |
| 30d. | Designer | | | $0.00 | $0.00 | $0.00 |
| 30e. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 30f. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 30g. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 30h. | Typist | | | $0.00 | $0.00 | $0.00 |
| 30i. | | | | | $0.00 | $0.00 |
| 30 | Civil (Site) Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Electrical | | | | | |
| 31a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 31b. | Project Director | | | $0.00 | $0.00 | $0.00 |
| 31c. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 31d. | Electrical Engineer | | | $0.00 | $0.00 | $0.00 |
| 31e. | Designer | | | $0.00 | $0.00 | $0.00 |
| 31f. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 31g. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 31h. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 31i. | Typist | | | $0.00 | $0.00 | $0.00 |
| 31j. | | | | | $0.00 | $0.00 |
| 31 | Electrical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Interior Design | | | | | |
| 32a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 32b. | Project Designer | | | $0.00 | $0.00 | $0.00 |
| 32c. | Designer | | | $0.00 | $0.00 | $0.00 |
| 32d. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 32e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 32f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 32g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 32h. | | | | | $0.00 | $0.00 |
| 32 | Interior Design Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Landscaping | | | | | |
| 33a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 33b. | Project Landscape Architect | | | $0.00 | $0.00 | $0.00 |
| 33c. | Designer | | | $0.00 | $0.00 | $0.00 |
| 33d. | Site Supervisor | | | $0.00 | $0.00 | $0.00 |
| 33e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 33f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 33g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 33h. | | | | | $0.00 | $0.00 |
| 33 | Landscaping Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 34 | Salary Costs Page Subtotal (29+30+31+32+33) | 0 | 0 | | $0.00 | $0.00 |
| Submittals | | | | | | |
| Mechanical | | | | | |
| 35a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 35b. | Project Director | | | $0.00 | $0.00 | $0.00 |
| 35c. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 35d. | Mechanical Engineer | | | $0.00 | $0.00 | $0.00 |
| 35e. | Designer | | | $0.00 | $0.00 | $0.00 |
| 35f. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 35g. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 35h. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 35i. | Typist | | | $0.00 | $0.00 | $0.00 |
| 35j. | | | | | $0.00 | $0.00 |
| 35 | Mechanical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Structural | | | | | |
| 36a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 36b. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 36c. | Structural Engineer | | | $0.00 | $0.00 | $0.00 |
| 36d. | Designer | | | $0.00 | $0.00 | $0.00 |
| 36e. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 36f. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 36g. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 36h. | Typist | | | $0.00 | $0.00 | $0.00 |
| 36i. | | | | | $0.00 | $0.00 |
| 36 | Structural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 37a. | Principal | | | $0.00 | $0.00 |
| 37b. | Designer | | | $0.00 | $0.00 |
| 37c. | Drafter | | | $0.00 | $0.00 |
| 37d. | Spec Writer | | | $0.00 | $0.00 |
| 37e. | Typist | | | $0.00 | $0.00 |
| 37f. | Estimator | | | $0.00 | $0.00 |
| 37g. | | | | $0.00 | $0.00 |
| 37h. | | | | $0.00 | $0.00 |
| 37 | Subtotal | 0 | 0 | $0.00 | $0.00 |
| 38a. | Principal | | | | $0.00 | $0.00 |
| 38b. | Designer | | | | $0.00 | $0.00 |
| 38c. | Drafter | | | | $0.00 | $0.00 |
| 38d. | Spec Writer | | | | $0.00 | $0.00 |
| 38e. | Typist | | | | $0.00 | $0.00 |
| 38f. | Estimator | | | | $0.00 | $0.00 |
| 38g. | | | | | $0.00 | $0.00 |
| 38h. | | | | | $0.00 | $0.00 |
| 38 | Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 39 | Salary Costs Page Subtotal (35+36+37+38) | 0 | 0 | | $0.00 | $0.00 |
| Salary Costs Previous Page Subtotal (line 34) | 0 | 0 | | $0.00 | $0.00 |
| 40 | Submittal Salary Costs (34+39) | 0 | 0 | | $0.00 | $0.00 |
| Site Visits | | | | | | |
| Salary Costs | | | | | |
| Architectural | | | | | |
| 41a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 41b. | Project Architect | | | $0.00 | $0.00 | $0.00 |
| 41c. | Designer (Intern/Assoc Arch) | | | $0.00 | $0.00 | $0.00 |
| 41d. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 41e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 41f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 41g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 41h. | | | | | $0.00 | $0.00 |
| 41 | Architectural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Civil (Site) | | | | | |
| 42a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 42b. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 42c. | Civil Engineer | | | $0.00 | $0.00 | $0.00 |
| 42d. | Designer | | | $0.00 | $0.00 | $0.00 |
| 42e. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 42f. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 42g. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 42h. | Typist | | | $0.00 | $0.00 | $0.00 |
| 42i | | | | | $0.00 | $0.00 |
| 42 | Civil (Site) Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Electrical | | | | | |
| 43a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 43b. | Project Director | | | $0.00 | $0.00 | $0.00 |
| 43c. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 43d. | Electrical Engineer | | | $0.00 | $0.00 | $0.00 |
| 43e. | Designer | | | $0.00 | $0.00 | $0.00 |
| 43f. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 43g. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 43h. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 43i. | Typist | | | $0.00 | $0.00 | $0.00 |
| 43j. | | | | | $0.00 | $0.00 |
| 43 | Electrical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Interior Design | | | | | |
| 44a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 44b. | Project Designer | | | $0.00 | $0.00 | $0.00 |
| 44c. | Designer | | | $0.00 | $0.00 | $0.00 |
| 44d. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 44e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 44f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 44g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 44h. | | | | | $0.00 | $0.00 |
| 44 | Interior Design Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Landscaping | | | | | |
| 45a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 45b. | Project Landscape Architect | | | $0.00 | $0.00 | $0.00 |
| 45c. | Designer | | | $0.00 | $0.00 | $0.00 |
| 45d. | Site Supervisor | | | $0.00 | $0.00 | $0.00 |
| 45e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 45f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 45g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 45h. | | | | | $0.00 | $0.00 |
| 45 | Landscaping Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Salary Costs Page Subtotal (41+42+43+44+45) | 0 | 0 | | $0.00 | $0.00 |
| Site Visits | | | | | | |
| Mechanical | | | | | |
| 46a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 46b. | Project Director | | | $0.00 | $0.00 | $0.00 |
| 46c. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 46d. | Mechanical Engineer | | | $0.00 | $0.00 | $0.00 |
| 46e. | Designer | | | $0.00 | $0.00 | $0.00 |
| 46f. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 46g. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 46h. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 46i. | Typist | | | $0.00 | $0.00 | $0.00 |
| 46j. | | | | | $0.00 | $0.00 |
| 46 | Mechanical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Structural | | | | | |
| 47a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 47b. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 47c. | Structural Engineer | | | $0.00 | $0.00 | $0.00 |
| 47d. | Designer | | | $0.00 | $0.00 | $0.00 |
| 47e. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 47f. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 47g. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 47h. | Typist | | | $0.00 | $0.00 | $0.00 |
| 47i | | | | | $0.00 | $0.00 |
| 47 | Structural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 48a. | Principal | | | $0.00 | $0.00 |
| 48b. | Designer | | | $0.00 | $0.00 |
| 48c. | Drafter | | | $0.00 | $0.00 |
| 48d. | Spec Writer | | | $0.00 | $0.00 |
| 48e. | Typist | | | $0.00 | $0.00 |
| 48f. | Estimator | | | $0.00 | $0.00 |
| 48g. | | | | $0.00 | $0.00 |
| 48h. | | | | $0.00 | $0.00 |
| 48 | Subtotal | 0 | 0 | $0.00 | $0.00 |
| 49a. | Principal | | | | $0.00 | $0.00 |
| 49b. | Designer | | | | $0.00 | $0.00 |
| 49c. | Drafter | | | | $0.00 | $0.00 |
| 49d. | Spec Writer | | | | $0.00 | $0.00 |
| 49e. | Typist | | | | $0.00 | $0.00 |
| 49f. | Estimator | | | | $0.00 | $0.00 |
| 49g. | | | | | $0.00 | $0.00 |
| 49h. | | | | | $0.00 | $0.00 |
| 49 | Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 50 | Salary Costs Page Subtotal (46+47+48+49) | 0 | 0 | | $0.00 | $0.00 |
| Salary Costs Previous Page Subtotal (line 45) | 0 | 0 | | $0.00 | $0.00 |
| 51 | Site Visits Salary Costs (50+45) | 0 | 0 | | $0.00 | $0.00 |
| Record Documents | | | | | | |
| Salary Costs | | | | | |
| Architectural | | | | | |
| 52a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 52b. | Project Architect | | | $0.00 | $0.00 | $0.00 |
| 52c. | Designer (Intern/Assoc Arch) | | | $0.00 | $0.00 | $0.00 |
| 52d. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 52e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 52f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 52g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 52h. | | | | | $0.00 | $0.00 |
| 52 | Architectural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Civil (Site) | | | | | |
| 53a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 53b. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 53c. | Civil Engineer | | | $0.00 | $0.00 | $0.00 |
| 53d. | Designer | | | $0.00 | $0.00 | $0.00 |
| 53e. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 53f. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 53g. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 53h. | Typist | | | $0.00 | $0.00 | $0.00 |
| 54i. | | | | | $0.00 | $0.00 |
| 53 | Civil (Site) Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Electrical | | | | | |
| 54a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 54b. | Project Director | | | $0.00 | $0.00 | $0.00 |
| 54c. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 54d. | Electrical Engineer | | | $0.00 | $0.00 | $0.00 |
| 54e. | Designer | | | $0.00 | $0.00 | $0.00 |
| 54f. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 54g. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 54h. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 54i. | Typist | | | $0.00 | $0.00 | $0.00 |
| 54j. | | | | | $0.00 | $0.00 |
| 54 | Electrical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Interior Design | | | | | |
| 55a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 55b. | Project Designer | | | $0.00 | $0.00 | $0.00 |
| 55c. | Designer | | | $0.00 | $0.00 | $0.00 |
| 55d. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 55e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 55f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 55g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 55h. | | | | | $0.00 | $0.00 |
| 55 | Interior Design Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Landscaping | | | | | |
| 56a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 56b. | Project Landscape Architect | | | $0.00 | $0.00 | $0.00 |
| 56c. | Designer | | | $0.00 | $0.00 | $0.00 |
| 56d. | Site Supervisor | | | $0.00 | $0.00 | $0.00 |
| 56e. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 56f. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 56g. | Typist | | | $0.00 | $0.00 | $0.00 |
| 56h. | | | | | $0.00 | $0.00 |
| 56 | Landscaping Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 57 | Salary Costs Page Subtotal (52+53+54+55+56) | 0 | 0 | | $0.00 | $0.00 |
| Record Documents | | | | | | |
| Mechanical | | | | | |
| 58a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 58b. | Project Director | | | $0.00 | $0.00 | $0.00 |
| 58c. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 58d. | Mechanical Engineer | | | $0.00 | $0.00 | $0.00 |
| 58e. | Designer | | | $0.00 | $0.00 | $0.00 |
| 58f. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 58g. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 58h. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 58i. | Typist | | | $0.00 | $0.00 | $0.00 |
| 58j. | | | | | $0.00 | $0.00 |
| 58 | Mechanical Subtotal | 0 | 0 | | $0.00 | $0.00 |
| Structural | | | | | |
| 59a. | Principal | | | $0.00 | $0.00 | $0.00 |
| 59b. | Project Engineer | | | $0.00 | $0.00 | $0.00 |
| 59c. | Structural Engineer | | | $0.00 | $0.00 | $0.00 |
| 59d. | Designer | | | $0.00 | $0.00 | $0.00 |
| 59e. | Drafter | | | $0.00 | $0.00 | $0.00 |
| 59f. | Spec Writer | | | $0.00 | $0.00 | $0.00 |
| 59g. | Estimator | | | $0.00 | $0.00 | $0.00 |
| 59h. | Typist | | | $0.00 | $0.00 | $0.00 |
| 59i. | | | | | $0.00 | $0.00 |
| 59 | Structural Subtotal | 0 | 0 | | $0.00 | $0.00 |
| 60a. | Principal | | | $0.00 | $0.00 |
| 60b. | Designer | | | $0.00 | $0.00 |
| 60c. | Drafter | | | $0.00 | $0.00 |
| 60d. | Spec Writer | | | $0.00 | $0.00 |
| 60e. | Typist | | | $0.00 | $0.00 |
| 60f. | Estimator | | | $0.00 | $0.00 |
| 60g. | | | | $0.00 | $0.00 |
| 60h. | | | | $0.00 | $0.00 |
| 60 | Subtotal | 0 | 0 | $0.00 | $0.00 |
| 61a. | Principal | | | $0.00 | $0.00 |
| 61b. | Designer | | | $0.00 | $0.00 |
| 61c. | Drafter | | | $0.00 | $0.00 |
| 61d. | Spec Writer | | | $0.00 | $0.00 |
| 61e. | Typist | | | $0.00 | $0.00 |
| 61f. | Estimator | | | $0.00 | $0.00 |
| 61g. | | | | $0.00 | $0.00 |
| 61h. | | | | $0.00 | $0.00 |
| 61 | Subtotal | 0 | 0 | $0.00 | $0.00 |
| 62 | Salary Costs Page Subtotal (58+59+60+61) | 0 | 0 | $0.00 | $0.00 |
| Salary Costs Previous Page Subtotal (line 57) | 0 | 0 | $0.00 | $0.00 |
| 63 | Record Documents Salary Costs (57+62) | 0 | 0 | $0.00 | $0.00 |
| 64 | Salary Costs | | | | |
| 65 | Submittal Salary Costs (line 40) | 0 | 0 | $0.00 | $0.00 |
| 66 | Site Visit Salary Costs (line 51) | 0 | 0 | $0.00 | $0.00 |
| 67 | Record Document Salary Costs (line 63) | 0 | 0 | $0.00 | $0.00 |
| 68 | Post-Design Salary Costs (65+66+67) | 0 | 0 | $0.00 | $0.00 |
| Miscellaneous Costs | | | | |
| 69a. | Reproduction | | | $0.00 | $0.00 |
| 69b. | Postage | | | $0.00 | $0.00 |
| 69c. | | | | $0.00 | $0.00 |
| 69d. | | | | $0.00 | $0.00 |
| 69 | Miscellaneous Costs Subtotal | 0 | 0 | $0.00 | $0.00 |
| 70 | Total Costs - Post-Design Phase (68+69) | 0 | 0 | $0.00 | $0.00 |
File details come from the government source that posted it.
Updated .