NIHDA201800023_RFP.pdf
PDF 3 MB Posted
- Attached to
- NIDA International Research and Training Program Support Services Federal contract opportunity
- Solicitation number
- NIHDA201800023
About this file
Request for Proposal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_Amendment_1_-_NIHDA201800023.pdf.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
SOLICITATION
SECTION A - SOLICITATION/CONTRACT FORM
1. Requisition or other Purchase Authority: PL. 102-32
2. Request for Proposal (RFP) Number:
NIHDA201800023
3. Issue Date:
6/14/2018
4. Set Aside:
[ ] No
[X] Yes See Part IV Section L
5. Title : NIDA International Research and Training Program Support Services
6. ISSUED BY:
NIDA Section Contracts Management Branch Blue, Office of Acquisition National Institute on Drug Abuse, National Institutes of Heath 6001 Executive Boulevard, Suite 4211 MSC 9559 Bethesda, Maryland 20892-9559* *If delivering by other than USPS, change the city and zip code to Rockville, MD 20852
7. SUBMIT OFFERS TO:
See Part III, Section J, "Packaging and Delivery of the Proposal for Use with the NIH electronic Contract Proposal Submission (eCPS) website," ATTACHMENT 1 of this Solicitation.
8. Proposals for furnishing the supplies and/or services in THE SCHEDULE will be received at the place specified in, and in the number of copies specified in Attachment 1, "Packaging and Delivery of the Proposal," until 3:00 PM local time on July 16, 2018. Offers will be valid for 120 days unless a different period is specified by the offeror on the Attachment entitled, "Proposal Summary and Data Record, NIH 2043.
9. This solicitation requires delivery of proposals as stated in ATTACHMENT 1. If proposals are required to be delivered to two different locations, the OFFICIAL POINT OF RECEIPT for determining TIMELY DELIVERY is the NIH electronic Contract Proposal Submission (eCPS) website.
IF YOUR PROPOSAL IS NOT RECEIVED BY THE ELECTRONIC CONTRACT PROPOSAL SUBMISSION
(eCPS) WEBSITE AT THE TIME SPECIFIED FOR THE OFFICE OF ACQUISITIONS, THEN IT WILL BE CONSIDERED LATE AND HANDLED IN ACCORDANCE WITH subparagraph (c)(3) of FAR Clause 52.215-1, Instructions to Offerors--Competitive Acquisition," LOCATED IN SECTION L.1. OF THIS SOLICITATION.
10. Offeror must be registered in the System for Award Management (SAM) prior to award of a contract. Offerors must access the CCR through The System for Award Management (SAM) at http://www.sam.gov
11. FOR INFORMATION CALL: Leon Wong, Contract Specialist
PHONE: 301-443-6677
e-MAIL: leon.wong@nih.gov
COLLECT CALLS WILL NOT BE ACCEPTED.
Andrew R. Hotaling, Contracting Officer NIDA Section Contracts Management Branch Blue Office of Acquisition, NIDA http://www.sam.gov
RFP Number : NIHDA201800023
- 2 -
RFP TABLE OF CONTENTS
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION D - PACKAGING, MARKING AND SHIPPING
SECTION E - INSPECTION AND ACCEPTANCE
SECTION F - DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION H - SPECIAL CONTRACT REQUIREMENTS
PART II - CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
SOLICITATION ATTACHMENTS
TECHNICAL PROPOSAL ATTACHMENTS
BUSINESS PROPOSAL ATTACHMENTS
INFORMATIONAL ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. GENERAL INFORMATION
a. INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION
b. NOTICE OF SMALL BUSINESS SET-ASIDE
c. NAICS CODE AND SIZE STANDARD
d. TYPE OF CONTRACT AND NUMBER OF AWARDS
e. LEVEL OF EFFORT
f. COMMITMENT OF PUBLIC FUNDS
g. PROMOTING EFFICIENT SPENDING
h. COMMUNICATIONS PRIOR TO CONTRACT AWARD
i. RELEASE OF INFORMATION
j. PREPARATION COSTS
k. SERVICE OF PROTEST
2. INSTRUCTIONS TO OFFERORS
a. GENERAL INSTRUCTIONS
1. Contract Type and General Clauses
2. Authorized Official and Submission of Proposal
3. Proposal Summary and Data Record (NIH-2043)
4. Separation of Technical and Business Proposals
5. Alternate Proposals
6. Evaluation of Proposals
7. Potential Award Without Discussions
8. Use of the Metric System of Measurement
9. Standards for Privacy of Individually Identifiable Health Information
- 3 -
10. Privacy Act - Treatment of Proposal Information
11. Selection of Offerors
12. Institutional Responsibility Regarding Investigator Conflicts of Interest
13. ROTC Access and Federal Military Recruiting on Campus
14. Certification of Filing and Payment of Taxes
15. Past Performance Information
16. Electronic Information Technology Accessibility Notice, HHSAR 352.239-73 (December 2015)
17. Solicitation Provisions Incorporated by Reference
b. TECHNICAL PROPOSAL INSTRUCTIONS
1. Technical Discussions
2. Other Considerations
3. Technical Evaluation
4. Obtaining and Disseminating Biomedical Research Resources
c. BUSINESS PROPOSAL INSTRUCTIONS
1. Basic Cost/Price Information
2. Proposal Cover Sheet
3. Information Other than Cost or Pricing Data
4. Requirements for Cost or Pricing Data or Information Other than Cost and Pricing Data
5. Salary Rate Limitation
6. Mentor Protege Program, HHSAR 352.219-70
7. HUBZone Small Business Concerns
8. Total Compensation Plan
9. Other Administrative Data
10. Qualifications of the Offeror
11. Subcontractors
12. Proposer's Annual Financial Report
13. Travel Costs/Travel Policy
SECTION M - EVALUATION FACTORS FOR AWARD
1. GENERAL
2. COST/PRICE EVALUATION
3. EVALUATION OF OPTIONS
4. EVALUATION OF DATA SHARING PLAN
5. TECHNICAL EVALUATION FACTORS
6. EVALUATION OF ELECTRONIC AND INFORMATION TECHNOLOGY ACCESSIBILITY- SECTION
7. PAST PERFORMANCE FACTOR
- 4 -
PART I - THE SCHEDULE
THE INFORMATION SET FORTH IN SECTION A - SOLICITATION/CONTRACT FORM, HEREIN CONTAINS IMPORTANT INFORMATION FOR ANY OFFEROR INTERESTED IN RESPONDING TO THIS SOLICITATION.
ANY CONTRACT RESULTING FROM THIS SOLICITATION WILL INCLUDE IN ITS SECTION A - SOLICITATION/ CONTRACT FORM, ACCOUNTING, APPROPRIATION AND GENERAL INFORMATION APPLICABLE TO THE
CONTRACT AWARD.
THE CONTRACT SCHEDULE SET FORTH IN SECTIONS B THROUGH H, HEREIN, CONTAINS CONTRACTUAL INFORMATION PERTINENT TO THIS SOLICITATION. IT IS NOT AN EXACT REPRESENTATION OF THE CONTRACT DOCUMENT THAT WILL BE AWARDED AS A RESULT OF THIS SOLICITATION. THE CONTRACT COST OR PRICE AND OTHER CONTRACTUAL PROVISIONS PERTINENT TO THE OFFEROR (i.e., those relating to the organizational structure [e.g., Non-Profit, Commercial] and specific cost authorizations unique to the Offeror's proposal and requiring Contracting Officer Prior Approval) WILL BE DISCUSSED IN THE NEGOTIATION PROCESS (IF NECESSARY) AND WILL BE INCLUDED IN THE RESULTANT CONTRACT. THE ENCLOSED CONTRACT SCHEDULE IS INTENDED TO PROVIDE THE OFFEROR WITH THE NECESSARY INFORMATION
TO UNDERSTAND THE TERMS AND CONDITIONS OF THE RESULTANT CONTRACT.
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
ARTICLE B.1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES
The NIDA International Research and Training Support Program (IRTS) was initiated to promote the development of collaborative international research through fellowships, technical consultation, and scientific information exchange.
Through this contract, NIDA plans to: (1) administer fellowships and exchange programs; (2) provide technical expertise services and orientation process services to international visitors who wish to learn more of NIDA’s research; (3) facilitate regional, bi-national, and international works and symposiums; and (4) promote technical and scientific information dissemination and exchange through targeted messages and special dissemination processes.
ARTICLE B.2. ESTIMATED COST - OPTION
a. The estimated cost of the Base Period of this contract is $ .
b. The fixed fee for the Base Period of this contract is $ . The fixed fee shall be paid in direct ratio to the level of effort expended; that is, the percent of fee paid shall be equal to the percent of total effort expended.Payment shall be subject to the withholding provisions of the clauses ALLOWABLE COST AND PAYMENT and FIXED FEE referenced in the General Clause Listing in Part II, ARTICLE I.1. of this contract.
c. The total estimated amount of the contract, represented by the sum of the estimated cost plus the fixed fee for the Base Period is $ .
d. If the Government exercises its option pursuant to the OPTION PROVISION Article in SECTION H of this contract, the Government's total estimated contract amount represented by the sum of the estimated cost plus the fixed fee will be increased as follows:
Period of Performance Estimated Cost ($) Fixed Fee ($) Estimated Cost Plus Fixed Fee ($)
Base Period (Contract Year 1) Option Period 1 (Contract Year 2) Option Period 2 (Contract Year 3) Option Period 3 (Contract Year 4) Option Period 4 (Contract Year 5) Total (Base Period and Option Periods)
- 5 -
ARTICLE B.3. OPTION QUANTITIES
a. Unless the Government exercises its option pursuant to the option clause referenced in ARTICLE I.3.
ADDITIONAL CONTRACT CLAUSES, this contract consists only of the Base Period specified in the Statement of Work as defined in SECTIONS C and F, for the price set forth in ARTICLE B.2. of this contract.
b. Pursuant to FAR Clause 52.217-7 Option for Increased Quantity - Separately Priced Line Item set forth in ARTICLE I.3. ADDITIONAL CONTRACT CLAUSES of this contract, the Government may, by unilateral contract modification, require the Contractor to perform the Option Quantities specified in the Statement of Work as defined in SECTIONS C and F of this contract. If the Government exercises this/these option(s), notice must be given before the expiration date of the contract. Specific information regarding the time frame for this notice is set forth in the OPTION PROVISION Article in SECTION H of this contract. The fixed price of this contract will be increased as set forth in paragraph c., below.
c. Upon the delivery and acceptance of the Option Item described in SECTION C of the contract and identified in the schedule of charges below, the Government shall pay the Contractor the unit price(s) set forth below:
Description Period Available
Quantity Available
Estimated Cost Per Option
Fixed Fee Per Option
Total Cost Plus Fixed
Fee Per Option
Option 1 - Additional
INVEST
Fellowship
Base Period (Contract Year 1)
Option 1 - Additional
INVEST
Fellowship
Option Period 1 (Contract Year 2)
Option 1 - Additional
INVEST
Fellowship
Option Period 2 (Contract Year 3)
Option 1 - Additional
INVEST
Fellowship
Option Period 3 (Contract Year 4)
Option 1 - Additional
INVEST
Fellowship
Option Period 4 (Contract Year 5)
Option 2 - Additional Hubert H.
Humphrey Fellowship
Base Period (Contract Year 1)
Option 2 - Additional Hubert H.
Humphrey Fellowship
Option Period 1 (Contract Year 2)
Option 2 - Additional Hubert H.
Humphrey Fellowship
Option Period 2 (Contract Year 3)
- 6 -
Description Period Available
Quantity Available
Estimated Cost Per Option
Fixed Fee Per Option
Total Cost Plus Fixed
Fee Per Option
Option 2 - Additional Hubert H.
Humphrey Fellowship
Option Period 3 (Contract Year 4)
Option 2 - Additional Hubert H.
Humphrey Fellowship
Option Period 4 (Contract Year 5)
Option 3 - Additional (U.S.)
Distinguished International Scientist Collaboration Award
Base Period (Contract Year 1)
Option 3 - Additional (U.S.)
Distinguished International Scientist Collaboration Award
Option Period 1 (Contract Year 2)
Option 3 - Additional (U.S.)
Distinguished International Scientist Collaboration Award
Option Period 2 (Contract Year 3)
Option 3 - Additional (U.S.)
Distinguished International Scientist Collaboration Award
Option Period 3 (Contract Year 4)
Option 3 - Additional (U.S.)
Distinguished International Scientist Collaboration Award
Option Period 4 (Contract Year 5)
- 7 -
Description Period Available
Quantity Available
Estimated Cost Per Option
Fixed Fee Per Option
Total Cost Plus Fixed
Fee Per Option
Option 4 - Technical Consultation
Base Period (Contract Year 1)
Option 4 - Technical Consultation
Option Period 1 (Contract Year 2)
Option 4 - Technical Consultation
Option Period 2 (Contract Year 3)
Option 4 - Technical Consultation
Option Period 3 (Contract Year 4)
Option 4 - Technical Consultation
Option Period 4 (Contract Year 5)
Option 5 - International Forum Travel Awards
Base Period (Contract Year 1)
Option 5 - International Forum Travel Awards
Option Period 1 (Contract Year 2)
Option 5 - International Forum Travel Awards
Option Period 2 (Contract Year 3)
Option 5 - International Forum Travel Awards
Option Period 3 (Contract Year 4)
Option 5 - International Forum Travel Awards
Option Period 4 (Contract Year 5)
Option 6 - Ad hoc Travel
Base Period (Contract Year 1)
Option 6 - Ad hoc Travel
Option Period 1 (Contract Year 2)
Option 6 - Ad hoc Travel
Option Period 2 (Contract Year 3)
Option 6 - Ad hoc Travel
Option Period 3 (Contract Year 4)
Option 6 - Ad hoc Travel
Option Period 4 (Contract Year 5)
- 8 -
ARTICLE B.4. PROVISIONS APPLICABLE TO DIRECT COSTS
This article will prohibit or restrict the use of contract funds, unless otherwise approved by the Contracting Officer. The following is a list of items that may be included in the resultant contract as applicable. 1) Conferences & Meetings, 2) Food for Meals, Light Refreshments & Beverages, 3) Promotional Items, 4) Acquisition, by purchase or lease, of any interest in real property; 5) Special rearrangement or alteration of facilities; 6) Purchase or lease of any item of general purpose office furniture or office equipment regardless of dollar value; 7) Travel Costs including Foreign Travel; 8) Consultant Costs; 9) Subcontract Costs; 10) Patient Care Costs; 11) Accountable Government Property; 12) Printing costs; and 13) Research Funding.
ARTICLE B.5. ADVANCE UNDERSTANDINGS
Specific elements of cost, which normally require prior written approval of the Contracting Officer before incurrence of the cost (e.g., foreign travel, consultant fees, subcontracts) will be included in this Article if the Contracting Officer has granted his/her approval prior to contract award. NIDA reserves the right to have the contracted services in this contract benefit NIDA and other components of NIH.
[Remainder of Page Intentionally Left Blank]
- 9 -
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
ARTICLE C.1. STATEMENT OF WORK
a. Independently and not as an agent of the Government, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government, as needed to perform the Statement of Work, dated June 14, 2018, attached hereto and made a part of this Solicitation (See SECTION J - List of Attachments).
b. The applicable Privacy Act System of Records Number will be specified and shall be used in any design, development, or operation work to be performed under the resultant contract. Disposition of records shall be in accordance with SECTION C of the contract, and by direction of the Contracting Officer's Representative (COR).
ARTICLE C.2. REPORTING REQUIREMENTS
All reports required herein shall be submitted in electronic format. In addition, hardcopies of each report shall be submitted as set forth in ARTICLE F.2. DELIVERIES.
All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at: http://www.hhs.gov/web/508/index.html under "Making Files Accessible."
All paper/hardcopy documents/reports submitted under this contract shall be printed or copied, double-sided, on at least 30 percent post consumer fiber paper, whenever practicable, in accordance with FAR 4.302(b).
a. Technical Progress Reports
The Contractor shall prepare and submit the following reports in the manner stated below:
1. Annual Progress Report This report shall include a summation of the results of the entire contract work for the period covered. An annual report will not be required for the period when the Final Report is due. An Annual Report shall not be submitted when an Final Report is due. This report is due 30 business days after the end of each contract year, if option periods are exercised.
2. Annual Fellowship Report The Contractor shall produce an annual summary of the fellowship program. This report shall include a listing of all current fellows as well as problems encountered and recommendations for program improvements. This report is due 30 business days after the end of each contract year, if option periods are exercised.
3. Final Report This report shall consist of the work performed and results obtained for the entire contract period of performance as stated in SECTION F of this contract. This report shall be in sufficient detail to describe comprehensively the results achieved. The Final Report shall be submitted on or before the last day of the contract performance period. An Annual report shall not be required for the period when the Final Report is due.
4. Summary of Salient Results The Contractor shall submit, with the Final Report, a summary (not to exceed 200 words) of salient results achieved during the performance of the contract.
http://www.hhs.gov/web/508/index.html
- 10 -
b. Other Reports/Deliverables
1. Reporting of Financial Conflict of Interest (FCOI)
All reports and documentation required by 45 CFR Part 94, Responsible Prospective Contractors including, but not limited to, the New FCOI Report, Annual FCOI Report, Revised FCOI Report, and the Mitigation Report, shall be submitted to the Contracting Officer in Electronic format. Thereafter, reports shall be due in accordance with the regulatory compliance requirements in 45 CFR Part 94.
45 CFR Part 94 is available at: http://www.ecfr.gov/cgi-bin/text-idx?
c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45.
See Part 94.5, Management and reporting of financial conflicts of interest for complete information on reporting requirements.
(Reference subparagraph g. of the INSTITUTIONAL RESPONSIBILITY REGARDING INVESTIGATOR FINANCIAL CONFLICTS OF INTEREST Article in SECTION H of this contract.)
HHS SECURITY AND PRIVACY LANGUAGE FOR INFORMATION AND IT PROCUREMENTS
2. INFORMATION AND/OR PHYSICAL SECURITY
Contractor Non-Disclosure Agreement (NDA) - Each Contractor (and/or any subcontractor) employee having access to non-public government information under this contract shall complete the NIH non-disclosure agreement https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/ Nondisclosure.pdf , as applicable. A copy of each signed and witnessed NDA shall be submitted to the Contracting Officer (CO) and/or CO Representative (COR) prior to performing any work under this acquisition.
INFORMATION AND/OR PHYSICAL SECURITY
A. Security Assessment and Authorization (SA&A)-
A valid authority to operate (ATO) certifies that the Contractor's information system meets the contract's requirements to protect the agency data. If the system under this contract does not have a valid ATO, the Contractor (and/or any subcontractor) shall work with the agency and supply the deliverables required to complete the ATO within the specified timeline(s) within three (3) months after contract award. The Contractor shall conduct the SA&A requirements in accordance with HHS IS2P, NIST SP 800-37, Guide for Applying the Risk Management Framework to Federal Information Systems: A Security Life Cycle Approach (latest revision).
For an existing ATO, Contracting Officer Representative must make a determination if the existing ATO provides appropriate safeguards or if an additional ATO is required for the performance of the contract and state as such.
NIH acceptance of the ATO does not alleviate the Contractor's responsibility to ensure the system security and privacy controls are implemented and operating effectively.
B. SA&A Package Deliverables -
The Contractor (and/or any subcontractor) shall provide an SA&A package within 30 days of contract award to the CO and/or COR. The following SA&A deliverables are required to complete the SA&A package.
• System Security Plan (SSP) - due within 30 days after contract award. The SSP shall comply with the NIST SP 800-18, Guide for Developing Security Plans for Federal Information Systems, the Federal Information Processing Standard (FIPS) 200, Recommended Security Controls for Federal Information Systems, and NIST SP 800-53, Security and Privacy Controls for Federal Information Systems and Organizations applicable baseline requirements, and other applicable NIST guidance as well as HHS and NIH policies and other guidance. The SSP shall be consistent with and detail the approach to IT security http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45 http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45
- 11 -contained in the Contractor's bid or proposal that resulted in the award of this contract. The SSP shall provide an overview of the system environment and security requirements to protect the information system as well as describe all applicable security controls in place or planned for meeting those requirements. It should provide a structured process for planning adequate, cost-effective security protection for a system.
The Contractor shall update the SSP at least annually thereafter.
• Security Assessment Plan/Report (SAP/SAR) - due 30 days after the contract award. The security assessment shall be conducted by the assessor and be consistent with NIST SP 800-53A, NIST SP 800-30, and HHS and NIH policies. The assessor will document the assessment results in the SAR.
The NIH should determine which security control baseline applies and then make a determination on the appropriateness/necessity of obtaining an independent assessment. Assessments of controls can be performed by contractor, government, or third parties, with third party verification considered the strongest.
If independent assessment is required, include statement below.
Thereafter, the Contractor, in coordination with the NIH shall conduct/assist in the assessment of the security controls and update the SAR at least annually.
• Independent Assessment - due 90 days after the contract award. The Contractor (and/or subcontractor) shall have an independent third-party validate the security and privacy controls in place for the system(s).
The independent third party shall review and analyze the Security Authorization package, and report on technical, operational, and management level deficiencies as outlined in NIST SP 800-53. The Contractor shall address all "high" deficiencies before submitting the package to the Government for acceptance. All remaining deficiencies must be documented in a system Plan of Actions and Milestones (POA&M).
• POA&M - due 30 days after contract award. The POA&M shall be documented consistent with the HHS Standard for Plan of Action and Milestones and NIH policies. All high-risk weaknesses must be mitigated within 30 days and all medium weaknesses must be mitigated within 60 days from the date the weaknesses are formally identified and documented. The NIH will determine the risk rating of vulnerabilities. Identified risks stemming from deficiencies related to the security control baseline implementation, assessment, continuous monitoring, vulnerability scanning, and other security reviews and sources, as documented in the SAR, shall be documented and tracked by the Contractor for mitigation in the POA&M document. Depending on the severity of the risks, NIH may require designated POAM weaknesses to be remediated before an ATO is issued. Thereafter, the POA&M shall be updated at least quarterly.
C. Contingency Plan and Contingency Plan Test - due 60 days after contract award. The Contingency Plan must be developed in accordance with NIST SP 800-34, Contingency Planning Guide for Federal Information Systems, and be consistent with HHS and NIH policies. Upon acceptance by the System Owner, the Contractor, in coordination with the System Owner, shall test the Contingency Plan and prepare a Contingency Plan Test Report that includes the test results, lessons learned and any action items that need to be addressed.
Thereafter, the Contractor shall update and test the Contingency Plan at least annually.
• E-Authentication Questionnaire - The contractor (and/or any subcontractor) shall collaborate with government personnel to ensure that an E-Authentication Threshold Analysis (E-auth TA) is completed to determine if a full E-Authentication Risk Assessment (E-auth RA) is necessary. System documentation developed for a system using E-auth TA/E-auth RA methods shall follow OMB 04-04 and NIST SP 800-63, Rev. 2, Electronic Authentication Guidelines.
Based on the level of assurance determined by the E-Auth, the Contractor (and/or subcontractor) must ensure appropriate authentication to the system, including remote authentication, is in-place in accordance with the assurance level determined by the E-Auth (when required) in accordance with HHS policies.
D. POSITION SENSITIVITY DESIGNATIONS
All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR). The following position sensitivity designation levels apply to this solicitation/contract:
- 12 -
[ ] Level 6: Public Trust - High Risk. Contractor/subcontractor employees assigned to Level 6 positions shall undergo a Suitability Determination and Background Investigation (MBI).
[X] Level 5: Public Trust - Moderate Risk. Contractor/subcontractor employees assigned to Level 5 positions with no previous investigation and approval shall undergo a Suitability Determination and a Minimum Background Investigation (MBI), or a Limited Background Investigation (LBI).
[X] Level 1: Non-Sensitive. Contractor/subcontractor employees assigned to Level 1 positions shall undergo a Suitability Determination and National Check and Inquiry Investigation (NACI).
1. Homeland Security Presidential Directive (HSPD)-12 Roster-
A. The Contractor (and/or any subcontractor) shall submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s). The roster shall be submitted to the COR and/or CO within fourteen (14) calendar days after the effective date of this contract. Any revisions to the roster as a result of staffing changes shall be submitted within seven (7) calendar days of the change.
The COR will notify the Contractor of the appropriate level of investigation required for each staff member. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for contractor use at:
https://ocio.nih.gov/ aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx.
B. If the Contractor is filling a new position, the Contractor shall provide a position description and the Government will determine the appropriate suitability level. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 calendar days of the notification.
C. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 calendar days of the notification.
D. The Contractor shall notify the Contracting Officer in advance when any new personnel, who are subject to a background check/investigation, will work under the contract and if they have previously been the subject of national agency checks or background investigations.
E. All contractor and subcontractor employees shall comply with the conditions established for their designated position sensitivity level prior to performing any work under this contract. Contractors may begin work after the fingerprint check has been completed.
F. Investigations are expensive and may delay performance, regardless of the outcome of the investigation.
Delays associated with rejections and consequent re-investigations may not be excusable in accordance with the FAR clause, Excusable Delays - see FAR 52.249-14. Accordingly, the Contractor shall ensure that any additional employees whose names it submits for work under this contract have a reasonable chance for approval.
G. Typically, the Government investigates personnel at no cost to the Contractor. However, multiple investigations for the same position may, at the Contracting Officer's discretion, justify reduction(s) in the contract price of no more that the cost of the additional investigation(s).
H. The Contractor shall include language similar to this "HHS Controlled Facilities and Information Systems Security" language in all subcontracts that require subcontractor personnel to have the same frequency and duration of (1) physical access to an HHS-controlled facility; (2) logical access to an HHS-controlled information system; (3) access to sensitive HHS data/information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).
I. The Contractor shall direct inquiries, including requests for forms and assistance, to the Contracting Officer or designee. Within 7 calendar days after the Government's final acceptance of the work under this contract, or upon termination of the contract, the Contractor shall return all identification badges to the Contracting Officer or designee.
E. CONTRACT INITIATION AND EXPIRATION
- 13 -
a. General Security Requirements- The Contractor (and/or any subcontractor) shall comply with information security and privacy requirements, Enterprise Performance Life Cycle (EPLC) processes, HHS Enterprise Architecture requirements to ensure information is appropriately protected from initiation to expiration of the contract. All information systems development or enhancement tasks supported by the contractor shall follow the HHS EPLC framework and methodology or and in accordance with the HHS Contract Closeout Guide (2012).
HHS EA requirements may be located here: https://www.hhs.gov/ocio/ea/documents/proplans.html
b. System Documentation- Contractors (and/or any subcontractors) must follow and adhere to NIST SP 800-64, Security Considerations in the System Development Life Cycle, at a minimum, for system development and provide system documentation at designated intervals (specifically, at the expiration of the contract) within the EPLC that require artifact review and approval.
c. Sanitization of Government Files and Information- As part of contract closeout and at expiration of the contract, the Contractor (and/or any subcontractor) shall provide all required documentation in accordance with the NIH Media Sanitization and Disposal Policy to the CO and/or COR to certify that, at the government's direction, all electronic and paper records are appropriately disposed of and all devices and media are sanitized in accordance with NIST SP 800-88, Guidelines for Media Sanitization.
d. Notification- The Contractor (and/or any subcontractor) shall notify the CO and/or COR and system ISSO within fifteen days before an employee stops working under this contract.
e. Contractor Responsibilities Upon Physical Completion of the Contract- The contractor (and/or any subcontractors) shall return all government information and IT resources (i.e., government information in non-government-owned systems, media, and backup systems) acquired during the term of this contract to the CO and/or COR. Additionally, the Contractor shall provide a certification that all government information has been properly sanitized and purged from Contractor-owned systems, including backup systems and media used during contract performance, in accordance with HHS and/or NIH policies.
The Contractor (and/or any subcontractor) shall perform and document the actions identified in the NIH Contractor Employee Separation Checklist https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/ Documents/Emp-sep-checklist.pdf when an employee terminates work under this contract within 2 days of the employee's exit from the contract. All documentation shall be made available to the CO and/or COR upon request.
f. Contractor Non-Disclosure Agreement (NDA)- Each Contractor (and/or any subcontractor) employee having access to non-public government information under this contract shall complete the NIH non-disclosure agreement https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/ Nondisclosure.pdf , as applicable. A copy of each signed and witnessed NDA shall be submitted to the Contracting Officer (CO) and/or CO Representative (COR) prior to performing any work under this acquisition.
F. Vulnerability Scanning Reports - The Contractor shall report the results of the required monthly special vulnerability scans no later than 10 days following the end of each reporting period. If required monthly, this report may be included as part of the Technical Progress Report. Otherwise, this report shall be submitted under a separate cover on monthly basis .
G. Government Access for Security Assessment. In addition to the Inspection Clause in the contract, the Contractor (and/or any subcontractor) shall afford the Government access to the Contractor's facilities, installations, operations, documentation, information systems, and personnel used in performance of this contract to the extent required to carry out a program of security assessment (to include vulnerability testing), investigation, and audit to safeguard against threats and hazards to the confidentiality, integrity, and availability of federal data or to the protection of information systems operated on behalf of HHS, including but are not limited to:
a. At any tier handling or accessing information, consent to and allow the Government, or an independent third party working at the Government's direction, without notice at any time during a weekday during regular business hours contractor local time, to access contractor and subcontractor installations, facilities,
- 14 -infrastructure, data centers, equipment (including but not limited to all servers, computing devices, and portable media), operations, documentation (whether in electronic, paper, or other forms), databases, and personnel which are used in performance of the contract.
The Government includes but is not limited to the U.S. Department of Justice, U.S. Government Accountability Office, and the HHS Office of the Inspector General (OIG). The purpose of the access is to facilitate performance inspections and reviews, security and compliance audits, and law enforcement investigations. For security audits, the audit may include but not be limited to such items as buffer overflows, open ports, unnecessary services, lack of user input filtering, cross site scripting vulnerabilities, SQL injection vulnerabilities, and any other known vulnerabilities.
b. At any tier handling or accessing protected information, fully cooperate with all audits, inspections, investigations, forensic analysis, or other reviews or requirements needed to carry out requirements presented in applicable law or policy. Beyond providing access, full cooperation also includes, but is not limited to, disclosure to investigators of information sufficient to identify the nature and extent of any criminal or fraudulent activity and the individuals responsible for that activity. It includes timely and complete production of requested data, metadata, information, and records relevant to any inspection, audit, investigation, or review, and making employees of the contractor available for interview by inspectors, auditors, and investigators upon request. Full cooperation also includes allowing the Government to make reproductions or copies of information and equipment, including, if necessary, collecting a machine or system image capture.
c. Segregate Government protected information and metadata on the handling of Government protected information from other information. Commingling of information is prohibited. Inspectors, auditors, and investigators will not be precluded from having access to the sought information if sought information is commingled with other information.
d. Cooperate with inspections, audits, investigations, and reviews.
3. Section 508 Annual Report
The contractor shall submit an annual Section 508 report in accordance with the schedule set forth by the Contracting Officer (CO)/Contracting Officer's Representative (COR). The Section 508 Report Template and Instructions for completing the report are available at: http://www.hhs.gov/web/508/ contracting/technology/vendors.html under "Vendor Information and Documents."
ARTICLE C.3. INVENTION REPORTING REQUIREMENT
All reports and documentation required by FAR Clause 52.227-11, Patent Rights-Ownership by the Contractor including, but not limited to, the invention disclosure report, the confirmatory license, and the Government support certification, shall be directed to the Division of Extramural Inventions and Technology Resources (DEITR), OPERA, OER, NIH, 6705 Rockledge Drive, Suite 310, MSC 7980, Bethesda, Maryland 20892-7980 (Telephone: 301-435-1986). In addition, one copy of an annual utilization report, and a copy of the final invention statement, shall be submitted to the Contracting Officer.
The annual utilization report shall be submitted in accordance with the DELIVERIES Article in SECTION F of this contract. The final invention statement (see FAR 27.303(b)(2)(ii)) shall be submitted on the expiration date of the contract.
If no invention is disclosed or no activity has occurred on a previously disclosed invention during the applicable reporting period, a negative report shall be submitted to the Contracting Officer at the address listed above.
To assist contractors in complying with invention reporting requirements of the clause, the NIH has developed "Interagency Edison," an electronic invention reporting system. Use of Interagency Edison is required as it streamlines the reporting process and greatly reduces paperwork. Access to the system is through a secure interactive Web site to ensure that all information submitted is protected. Interagency Edison and information relating to the capabilities of http://www.hhs.gov/web/508/contracting/technology/vendors.html http://www.hhs.gov/web/508/contracting/technology/vendors.html
- 15 -the system can be obtained from the Web ( http://www.iedison.gov), or by contacting the Extramural Inventions and Technology Resources Branch, OPERA, NIH.
http://www.iedison.gov
- 16 -
SECTION D - PACKAGING, MARKING AND SHIPPING
All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. At a minimum, all deliverables shall be marked with the contract number and Contractor name. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.
- 17 -
SECTION E - INSPECTION AND ACCEPTANCE
a. The Contracting Officer or the duly authorized representative will perform inspection and acceptance of materials and services to be provided.
b. For the purpose of this SECTION, the designated COR (see ARTICLE G.1.) is the authorized representative of the Contracting Officer.
c. Inspection and acceptance will be performed at:
National Institute on Drug Abuse National Institues of Health 6001 Executive Blvd Bethesda, Maryland 20892
Acceptance may be presumed unless otherwise indicated in writing by the Contracting Officer or the duly authorized representative within 30 days of receipt.
d. This contract incorporates the following clause by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available.
FAR Clause 52.246-9, Inspection of Research and Development (Short Form) (April 1984).
- 18 -
SECTION F - DELIVERIES OR PERFORMANCE
ARTICLE F.1. PERIOD OF PERFORMANCE
a. The period of performance of this contract shall be from 9/22/2018 through 9/21/2019.
b. If the Government exercises its option(s) pursuant to the OPTION PROVISION Article in Section H of this contract, the period of performance will be increased as listed below:
Option Option Period Option Period 1 (Contract Year 2) September 22, 2019 - September 21, 2020 Option Period 2 (Contract Year 3) September 22, 2020 - September 21, 2021 Option Period 3 (Contract Year 4) September 22, 2021 - September 21, 2022 Option Period 4 (Contract Year 5) September 22, 2022 - September 21, 2023
ARTICLE F.2. DELIVERIES
Satisfactory performance of the final contract shall be deemed to occur upon performance of the work described in the Description Article in SECTION C of this contract and upon delivery and acceptance by the Contracting Officer, or the duly authorized representative, of the following items in accordance with the stated delivery schedule:
a. The items specified below as described in the REPORTING REQUIREMENTS Article in SECTION C of this contract will be required to be delivered F.o.b. Destination as set forth in FAR 52.247-35, F.o.b. DESTINATION, WITHIN CONSIGNEES PREMISES (APRIL 1984), and in accordance with and by the date(s) specified below:
Item Description Quantity Delivery Schedule
(1) Annual Progress Report 1 electronic copy - COR
1 electronic copy - CO Within 30 business days after the end of each contract year (if Option Period(s) are exercised) except the final contract period when the final report is due.
(2) Annual Fellowship Report
1 electronic copy - COR 1 electronic copy - CO
Within 30 business days after the end of each contract year (if Option Period(s) are exercised) except the final contract period when the final report is due.
(3) Final Report 1 electronic copy -COR
1 electronic copy - CO
On or before the expiration date of the contract.
(4) Summary of Salient Results
1 electronic copy - COR
1 electronic copy - CO
On or before the expiration date of the contract.
(5) System Security Plan 1 electronic copy - COR 1 electronic copy - CO
Within 30 calendar days of contract effective date and updated annually from contract award, if options are exercised.
(6) Security Assessment Plan/ Report
1 electronic copy - COR 1 electronic copy - CO
Within 30 calendar days of contract effective date and updated annually from contract award, if options are exercised.
(7) Independent Security Assessment
1 electronic copy - COR 1 electronic copy - CO
Within 90 calendar days of contract award
(8) Plan of Actions and Milestones
1 electronic copy - COR 1 electronic copy - CO
Within 30 calendar days of contract effective date and updated annually from contract award, if options are exercised.
(9) Contingency Plan and Contingency Plan Test
1 electronic copy - COR 1 electronic copy - CO
Within 30 calendar days of contract effective date and updated annually
- 19 -
Item Description Quantity Delivery Schedule from contract award, if options are exercised.
(10) Non-Disclosure Agreements
1 electronic copy - COR 1 electronic copy - CO
Prior to performance of any work under the contract.
(11) Vulnerability Scanning Report
1 electronic copy - COR 1 electronic copy - CO
With monthly progress reports (i.e.
within 10 calendar days after the end of each month)
(12) Roster of Employees Requiring Suitability Investigations
1 electronic copy - COR 1 electronic copy - CO
Within 14 calendar days of the contract award date.
(13) Report of New and Departing Employees
1 electronic copy - COR 1 electronic copy - CO
Within 5 business days of any staff changes
(14) Section 508 Annual Report(s)
1 electronic copy - COR 1 electronic copy - CO
Annually on the contract anniversary date (if Option Period(s) are exercised).
(15) Reporting of Financial Conflict of Interest
1 electronic copy - CO
See Article C.2.b.1 for details.
(16) Annual Utilization Report (per Section C., Article C.3.)
1 electronic copy - CO Annually on the contract anniversary date (if Option Period(s) are exercised).
(17) Final Invention Report (per Section C., Article C.3.)
1 electronic copy - CO On or before the contract expiration date.
(18) Individual Subcontract Report
1 electronic copy - eSRS Semi-Annually on April 30th and October 30th.
(29) Summary Subcontract Report
1 electronic copy - eSRS Annually on October 30th.
b. The above items shall be addressed and delivered to:
Addressee Deliverable Item No Contracting Officer, 6001 Executive Blvd Suite 4211
MSC 9559, Bethesda, Maryland 20892-9559
1-17
Contracting Officer Representative, 6001 Executive
Blvd Suite 4261 MSC 9555, Bethesda, Maryland 20892-9555
1-14
ARTICLE F.3. LEVEL OF EFFORT
a. The Contractor shall have satisfied the requirement herein if not less than 90% nor more than 110% of the total direct labor Hours specified herein are furnished. These terms and conditions do not supersede the requirements of either the "Limitation of Cost" or "Limitation of Funds" clause.
b. In the event fewer Hours than the minimum specified number of direct labor Hours in the total categories are used by the Contractor in accomplishing the prescribed work and the Government has not invoked its rights under FAR Clause 52.249-6, TERMINATION (Cost-Reimbursement) incorporated in this contract, these parties agree that the fee will be adjusted based solely upon the quantity of Hours by which the number of direct labor Hours furnished is less than the number of direct labor Hours specified in this ARTICLE. The resulting adjustment shall be evidenced by a contract modification.
- 20 -
ARTICLE F.4. CLAUSES INCORPORATED BY REFERENCE, FAR 52.252-2 (FEBRUARY
1998)
This contract incorporates the following clause(s) by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/?q=browsefar.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE:
52.242-15, Stop Work Order (August 1989)
Alternate I (April 1984) is applicable to this contract.
https://www.acquisition.gov/?q=browsefar
- 21 -
SECTION G - CONTRACT ADMINISTRATION DATA
ARTICLE G.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)
The following Contracting Officer's Representative (COR) will represent the Government for the purpose of this contract:
[To be specified prior to award.]
The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the Statement of Work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.
The alternate COR is responsible for carrying out the duties of the COR only in the event that the COR can no longer perform his/her duties as assigned.
The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the Statement of Work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; (5) otherwise change any terms and conditions of this contract; or (6) sign written licensing agreements. Any signed agreement shall be incorporated by reference in Section K of the contract.
The Government may unilaterally change its COR designation.
ARTICLE G.2. KEY PERSONNEL, HHSAR 352.237-75 (December 2015)
The key personnel specified in this contract are considered to be essential to work performance. At least 30 days prior to the contractor voluntarily diverting any of the specified individuals to other programs or contracts the Contractor shall notify the Contracting Officer and shall submit a justification for the diversion or replacement and a request to replace the individual. The request must identify the proposed replacement and provide an explanation of how the replacement's skills, experience, and credentials meet or exceed the requirements of the contract (including, when applicable, Human Subjects Testing requirements). If the employee of the contractor is terminated for cause or separates from the contractor voluntarily with less than thirty days notice, the Contractor shall provide the maximum notice practicable under the circumstances. The Contractor shall not divert, replace, or announce any such change to key personnel without the written consent of the Contracting Officer. The contract will be modified to add or delete key personnel as necessary to reflect the agreement of the parties.
(End of Clause)
The following individual(s) is/are considered to be essential to the work being performed hereunder:
Name Title
To Be Named
ARTICLE G.3. INVOICE SUBMISSION/CONTRACT FINANCING REQUEST
a. Invoice Submission/Contract Financing Request, NIH(RC)-1 for NIH Cost-Reimbursement Type Contracts are attached and made part of this contract. The Contractor shall follow the attached instructions and submission procedures specified below to meet the requirements of a "proper invoice" pursuant to FAR Subpart 32.9, Prompt Payment.
- 22 -
1. Payment requests shall be submitted to the offices identified below. Do not submit supporting documentation (e.g., receipts, time sheets, vendor invoices, etc.) with your payment request unless specified elsewhere in the contract or requested by the Contracting Officer.
a. The original invoice shall be submitted to the following designated billing office:
National Institutes of Health Office of Financial Management Commercial Accounts 2115 East Jefferson Street, Room 4B-432, MSC 8500 Bethesda, MD 20892-8500
b. One copy of the invoice shall be submitted to the following approving official with appropriate backup documentation in accordance with NIDA Supplemental Billing Instructions (Section J - Attachments):