Amendment 1 - NHLBI-PB-(HL)-2010-77-JBM.doc
DOC document 34 KB Posted
- Attached to
- RECOVERY - Biplane X-ray Angio System
- Solicitation number
- NHLBI-PB-HL-2010-77-JBM
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2 - NHLBI-PB-(HL)-2010-77-JBM.doc | DOC document | |
| 2C713 schematic floor plan.pdf | ||
| Statement of Work 2 19 2010.doc | DOC document | |
| 2C609 schematic floor plan.pdf | ||
| SOW Biplane 2 1 2010 final.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEQ CHAPTER \h \r 1NATIONAL HEART, LUNG, AND BLOOD INSTITUTE
Biplane X-ray Angio System; Solicitation No. NHLBI-PB-(HL)-2010-77-JBM
AMENDMENT NO. 1
DATE OF ISSUANCE: February 22, 2010 SEQ CHAPTER \h \r 1The above numbered solicitation is amended as set forth below. The hour and the date specified for receipt of proposals is unchanged and remains March 10, 2010, 3:00 p.m. (EST). Offerors must acknowledge receipt of the amendment prior to the hour and the date specified in the solicitation or as amended, by one of the following methods:
I. By acknowledging receipt of this amendment on each copy of the proposal submitted. Please note that this is the preferred method.
II. By separate letter or email which includes a reference to the solicitation and amendment number.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF PROPOSALS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL. If by virtue of this amendment you desire to change a proposal already submitted, such change may be made by letter, provided each letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
This amendment revises the combined synopsis/solicitation as follows:
1. To attach the schematic floor plans for rooms 2C713 and 2C609, located in the NIH Magnuson Clinical Center (Building 10); and,
2. To amend the Statement of Work (SOW) to reflect requirements for the turn-key installation (see page 6 of SOW).
PAGE
File details come from the government source that posted it. Updated .