19-01417_Net_Repair_Part_List_2.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Trawl Net Repair
Solicitation number
NFFP7410-19-01417RDS
Issued by

About this file

Net Repair List 2

View the file

Other files

File Type Posted
19-01417_Net_Repair_SOW.pdf PDF
19-01417_Net_Repair_Solicitation.pdf PDF
19-01417_Net_Repair_Part_List_1.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Acoustics

NWFSC FRAM ACOUSTICS Trawl Task List (0007) for Net Repair
DescriptionWork RequiredNotes
Repair AWT#5594CODEND & LINER: Walk through all codend panels and liner, repair as necessary. Add closer spaced, stronger lift lines. Swap in 32mm linerwork quote for more closely spaced and stronger lift lines. Replace current 7mm liner with a 32mm liner
NET: Check panels and lines for wear and tear, repair as necessary. This $$ may be used for both pre-season repairs and repairing damage incurred during field seasonThe back portion of this net is old and likely worn, pay particular attention to it. The front is a brand new head, and should be in good shape
KITE: Walk thorugh the kite, repair meshes and headrope attachments as necessary. Evaluate and repair the hardware lashings as necessary.Kite should be in good shape
RIGGING: Walk through the spectra rigging (bridles, pennants, idlers) and inspect for wear, patch sheathing as necessary. Evaluate integrity of all lashings, repair as necessary.Rigging should be in good shape, though pay particular attention to potential chafing from the Tom weights. Money allocated is to cover any sheathe repairs.
HARDWARE: Evaluate condition of all chain, hammerloks, Net loks, Bow Couplings, swivels, and Masterlinks. Replace as necessary. Grease swivels.Hardware should be in good shape. Make sure it is flexing and movable. Money allocated is to cover any necessary replacements though these are unforseen.
Inspect AWT#5594INSPECTION: Final net, codend, liner, rigging, and hardware laid out and visible for joint walk-through and inspection, and signed off on by contractor representative and FEAT representative. Discussion of all changes pre/post between FEAT and contractor reps.
DOCUMENTS: Up-to-date net, codend, liner, rigging, and hardware plan provided for net #5594
Repair AWT#5295CODEND & LINER: Walk through all codend panels and liner, repair as necessary. Add closer spaced and stronger lift lineswork quote for more closely spaced and stronger lift lines. Replace current 7mm liner with a 32mm liner
NET: Check panels and lines for wear and tear, repair as necessary. This $$ may be used for both pre-season repairs and repairing damage incurred during field seasonThis is a brand new Head. The older portion could still use a walk through to double check for old materials.
KITE: Walk thorugh the kite, repair meshes and headrope attachments as necessary. Evaluate and repair the hardware lashings as necessary.The kite should be in good shape
RIGGING: Rigging is brand new, added to net in spring 2018.This is brand new rigging attached, and has never been dunked!
HARDWARE: Brand new hardware/recycled hardware from trashed 5879 set.This is brand new hardware, and hasn't seen the water.
Inspect AWT#5295INSPECTION: Final net, codend, liner, rigging, and hardware laid out and visible for joint walk-through and inspection, and signed off on by contractor representative and FEAT representative. Discussion of all changes pre/post between FEAT and contractor reps.This net used for gear trials cruise in April
DOCUMENTS: Up-to-date net, codend, liner, rigging, and hardware plan provided for net #5594
Repair AWT#5296Codend & Liner: Construct new reasearch codend and 32mm liner. Build with closer spaced and stronger lift lines.Need quote for new codend with 32mm liner. Codend modified for closer spaced and stronger lift lines
CODEND & LINER: Walk through all codend panels and liner, repair as necessary.This is a brand new codend and liner, doesn't neet any work
NET: Walk through all panels and meshes, repair as necessary. Evaluate and repair the gores as necessary. Replace entire "Head" region of net.This net requires a brand new Head. Older back portion may need repairs as well.
KITE: Walk thorugh the kite, repair meshes and headrope attachments as necessary. Evaluate and repair the hardware lashings as necessary.The kite should be in good shape
RIGGING: No rigging! Needs a setThis rigging will need to be done on a separate contract
HARDWARE: No hardware!This hardware will need to be done on a separate contract
Inspect AWT#5295INSPECTION: Final net, codend, liner, rigging, and hardware laid out and visible for joint walk-through and inspection, and signed off on by contractor representative and FEAT representative. Discussion of all changes pre/post between FEAT and contractor reps.
DOCUMENTS: Up-to-date net, codend, liner, rigging, and hardware plan provided for net #5594
Repair AWT#5880CODEND & LINER: Walk through all codend panels and liner, repair as necessary. Add closer spaced and stronger lift lines. Repair as necessary after large Rockfish trawl from 2018work quote for more closely spaced and stronger lift lines, minor repairs for rockfish trawl damage incurred last season.
NET: Check for wear and tear, repair as necessaryThe back portion of this net is old and likely worn, pay particular attention to it. At what point does NETS recommend replacing the Head on this net?
KITE: Walk thorugh the kite, repair meshes and headrope attachments as necessary. Evaluate and repair the hardware lashings as necessary.Kite should be in good shape
RIGGING: Walk through the spectra rigging (bridles, pennants, idlers) and inspect for wear, patch sheathing as necessary. Evaluate integrity of all lashings, repair as necessary.Rigging should be in good shape, though how is chafe from the Tom weights?
HARDWARE: Evaluate condition of all chain, hammerloks, Net loks, Bow Couplings, swivels, and Masterlinks. Replace as necessary. Grease swivels.Hardware should be in good shape
Inspect AWT#5880INSPECTION: Final net, codend, liner, rigging, and hardware laid out and visible for joint walk-through and inspection, and signed off on by contractor representative and FEAT representative. Discussion of all changes pre/post between FEAT and contractor reps.
DOCUMENTS: Up-to-date net, codend, liner, rigging, and hardware plan provided for net #5880

Emergency Repairs REPAIRS: General money for repairing elements of any AWT: net, codend, liner, rigging, and/or hardware due to field stresses

Industrial plastic net pallets Purchase of 4 plastic net pallets to ease shipping and store nets off the ground and deck Need a quote on these pallets, this is a wish list item, not sure we will get the money for them.

Net shipping Commercial flatbed transport of nets (shipping paid for by government credit card)