Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REVISED_SF_18_19-00636_SF_18_Quote_Form.doc | DOC document | |
| 19-00636_SF_18_Quote_Form.doc | DOC document | |
| 19-00636_Additional_Vessel_CAR_Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work NOAA Research Vessel MANTA
SHIPYARD WORK
Requisition # NCND6011-19-00636
A] GENERAL INFORMATION
1] This Statement of Work contains the requirements for shipyard services on the NOAA Research Vessel Manta R8301.
2] The general characteristics of the vessel are as follows:
Length: 83 feet Beam: 30 feet Draft: ~4 feet Displacement: ~78 long tons
3] All work is to be accomplished at the Contractor’s facility, which will not exceed 50 miles from the vessel homeport at Texas A&M University in Galveston, Texas. NOAA will deliver the vessel to the Contractor’s facility, and redelivery will also be handled by NOAA personnel. The required performance period for all work defined herein is; Date of Award through May 3, 2019
4] Coordination of the work schedules will be the responsibility of the Contractor to avoid any delays or disruptions in order to meet the performance period. The Contractor will provide all facilities, labor, materials, tools, and services required to complete the work UNLESS exceptions are noted in the specified tasks below.
5] Upon arrival at the Contractor’s facility the contractor will accept full responsibility for the safety of the vessel, including but not limited to fire protection, security patrols, water-tight integrity, protection from adverse environmental conditions, etc. This responsibility will terminate only after all work defined herein (or added during the work period) is complete, accepted by NOAA, and NOAA personnel remove the vessel from the Contractor’s facility.
6] NOAA employees and contractors may be working on board the vessel during the contract performance period on a not to interfere basis. During this period it will be required that these personnel have full access to the vessel during normal working hours.
7] If the vessel is hauled from the water, the Contractor will ensure that all machinery and equipment used for that purpose is fully functional, suitable for the task, rated for loads at least 20% greater than the maximum weight of the vessel, and operated by trained, competent personnel. NOAA will provide a docking plan for the vessel if required.
8] The government reserves the right to award some or all tasks defined herein, and to add tasks during the work period so long as cost and period of performance revisions, if any, are mutually agreed.
9] All work performed under this SOW (or added to it during the period of performance) will meet or exceed all current requirements of ABYC and USCG (Subchapter T) as applicable to this size and type of vessel, in addition to any specific requirements stated below.
10] In the event defects or damage unrelated to the work tasks defined below are discovered, the Contractor will submit a Condition Found Report (CFR) to the TPOC. The CFR will define corrective actions needed, the cost for that work (separated into labor, materials, services, and total), and the impact to the performance period.
11] All welding required as part of the tasks defined below will be performed by welders certified by ABS or USCG working in accordance with welding procedures approved by ABS or USCG. Certifications and procedures issued by other nationally recognized authorities may be considered. Copies of certifications and procedures will be provided to the TPOC before work commences.
12] NOTE: All work performed on the vessel will be accomplished as described below unless alternatives are presented in writing BEFORE the work commences and are agreed to by NOAA.
B] SPECIFIC WORK TASKS
1] Haul, clean, block, store, and launch Remove the vessel from the water. Pressure-wash the entire hull, including all surfaces within the tunnel, from sheer line to keel removing all dirt, grime, and marine growth. Similarly, clean all fittings below waterline, including propulsor components, struts, stern tubes, rudders, foils, fins, through-hulls, etc. If the vessel is fitted with waterjets, clean the interior of the jets. Do not damage any existing anti-fouling paint unless further tasks in this SOW require its removal. Clean transducers with a non-metallic brush, taking care to not mark the emitting surface in any way. Clean all surfaces of all anodes with a wire brush.
Block the vessel in a level attitude with the keel (or keels) 36” minimum off the ground. During the cleaning process, temporarily shift individual blocks to ensure that all portions of the hull are cleaned.
Inspect the hull, coatings, and all attachments and report any damage or discrepancies to the TPOC in writing. Provide electrical power to the vessel suitable for its shore power system.
Upon completion of all work done on the hard, launch the vessel, inspect all compartments for leaks, and secure it dockside. If dockside testing or underway trials are required after launch, provide prior notification to the TPOC so NOAA personnel can attend.
2] Recoat hull bottom Prepare the hull surfaces to be painted and apply two coats of Interlux brand Micron-CF antifouling paint. Paint will be applied in accordance with the coating manufacturer’s application requirements.
Provide an extra coat at the hull’s leading edges, including the hydrofoils, tracking fins, and each hull.
During the coating process, temporarily shift individual blocks under the hull to ensure all portions of the hull are recoated.
The Contractor will have an OEM representative or certified technician oversee the application process.
Notify the TPOC after completion of painting.
3] Cathodic protection anode replacement The TPOC will provide 10 new hull anodes. Remove and inspect all 10 installed anodes; two each P/S side tunnel at frame W, and three each P/S at each transom, for a total of ten (10) anodes. Reinstall anodes after bottom paint work is complete. Ensure new anodes make electrical contact with mounting brackets and bolts by testing continuity with a multi-meter.
4] Disassemble, clean, paint, reassemble jet parts A] With the help of FGBNMS staff, disassemble the port and starboard jet drive parts from the transom and inspect all components. Clean the individual jet components of marine growth, using pressure wash, wire brushes, and similar hand tools. Clean all major components, including 2 intake ducts, 2 stators, 2 nozzles, 2 buckets, and all attached devices and fittings.
B] Prior to painting and reassembly, the TPOC and the Contractor will inspect wear ring on jet drive’s impeller race. Notify TPOC prior to this work so FGBNMS staff may observe. If wear ring is showing signs of wear and tear, a replacement will be ordered by FGBNMS staff.
C] Repaint the jet parts with two coats of Micron CF anti-fouling paint and reassemble. The Contractor will use a blast medium approved for aluminum. Notify TPOC upon completion so they may inspect.
5] Annual life raft service Unship two each 16-person life rafts (DBC, SOLAS A) and transport to local DBC approved third party inspection service of yard’s choosing after consulting with TPOC. The third party will inspect and perform annual service on all rafts on yard’s account. Reinstall life rafts upon return, taking particular care to orient the rafts correctly with regard to drainage holes. The Contractor will coordinate the logistics of transport with approved third-party inspection service. Provide written inspection and service report to TPOC upon completion.
6] Starboard Generator Servicing Perform the following tasks on the starboard generator:
a) Replace all metallic fuel lines and hoses installed by the generator builder.
b) Clean and service heat exchanger. Pressure test after servicing.
c) Replace exhaust elbow.
d) Check and adjust all valves and replace hose clamps and fittings as necessary.
e) Add one fuel pressure boost pump, 5-9 PSI, suitable voltage, energized with injection pump.
f) Inspect exhaust hose.
7] Hydraulic Hose Replacement Perform the following service on the trawl and scientific winches on the top deck:
a) Replace all hydraulic fittings with those of equal size, joint type, orientation, and pressure rating.
Fittings will be zinc-plated carbon steel.
b) Replace all hydraulic hose assemblies with those of equal inside diameter, pressure rating, length, orientation, and fitting type. Hose fittings will be zinc-plated carbon steel. If protective covers are currently installed on any hoses, replace those with new covers of equal capability.
c) Once all items above are complete, test the crane with the TPOC and demonstrate that no leaks exist.
d) On successful completion of testing, wrap all zinc-plated fittings (including those on hoses) with Densyl tape.
8] Knuckle Crane Repairs Recondition Morgan Company 703M2S Deck Crane, including the following maintenance:
a) Replace winch
b) Replace winch cable with stainless steel cable
c) Rebuild (4) hydraulic rotary actuators
d) Rebuild boom cylinder
e) Rebuild knuckle cylinder
f) Replace telescoping cylinders
g) Replace all hydraulic fittings with stainless steel
h) Replace all hydraulic feed tubes with stainless steel lines
i) Sand blast crane to bare metal, prime with Interlux Pre-Kote, and paint with Industrial Materials
Corp. TIMC-02 marine enamel, black.
j) All new hardware (bolts, pins, nuts, etc.)
Repair will include removal of crane and reinstallation once the refurb is complete. Extra caution should be taken when removing knuckle crane to avoid hydraulic oil leaks.
9] Replace port lazarette intake fan The port lazarette vent fan is making non-normal noises. Access the fan and determine the source of the noise. If the fan and/or motor require replacement, obtain and install new components of the same make, model, and capacity. Before final assembly, coat all metallic parts of the fan with Boeshield T-9 corrosion inhibitor.
10] New Chart Plotters Procure and replace three chart plotters, including two in the wheel house and one in the aft control panel. Replace with Furuno NavNet TZTL12F Chart Plotter 12’ Touch Screen Display. Test per satisfaction of the TPOC.
11] Abrade forward, midship, aft, and top deck Using 20x50 epoxy-coated copper slag, blast a non-skid surface into the deck plate without removing any of the aluminum material. The finish surface texture is to be approved by the TPOC via inspection of samples provided by the yard before profile blasting commences.
The contractor shall take special precautions to avoid particulate contamination as a result of blasting, such as temporarily closing off air intakes, pipe vents, and all interior spaces. The contractor will demonstrate to the TPOC how interior spaces are to be protected before any work is started.
Upon completion, the contractor will demonstrate to the TPOC that all areas worked on are textured to the same degree as the samples. If any area is not profiled as required, repeat the profiling process in that area.
C] OTHER INFORMATION
SITE VISIT:
A visit to the vessel is encouraged prior to bid submission and should be coordinated with:
LT Dustin Picard, NOAA until 3/15/19 LTJG Melissa Mathes, NOAA after 3/15/19 Vessel Operations Coordinators Ofc. (409) 356-0395 Cell (979) 777-7183
Or alternate point of contact:
George P. Schmahl. Superintendent Flower Garden Banks National Marine Sanctuary Ofc. (409) 356-0383
R/V MANTA is docked at:
Texas A&M University at Galveston 200 Seawolf Parkway Galveston, TX 77553.
TECHNICAL POINT OF CONTACT/TASK MONITOR:
The Contracting Officer will assign the Technical Point of Contact(s) (TPOC) that shall serve as a technical advisor to the Contracting Officer. The TPOC does not have any contractual authority and cannot obligate the Government or change the scope of work. The TPOC serves as a technical representative for the Contracting Officer.
TPOC(s):
LT Dustin Picard, NOAA until 3/15/19 LTJG Melissa Mathes, NOAA after 3/15/19 Vessel Operations Coordinators
Ofc. 409-356-0395 Cell (979) 777-7183
Or George P. Schmahl, Sanctuary Superintendent Ofc. (409) 356-0383
IT SECURITY REQUIREMENTS
The Certification and Accreditation (C&A) requirements of 48 CFR 1352.239-73 do not apply, and a Security Accreditation Package is not required.
The contractor will not have access to any government owned IT equipment or be furnished government privileged information. However, the contractor will have full access to the vessel and all of its systems.
INSPECTION AND ACCEPTANCE:
The TPOC will perform final review and acceptance of all work.
INVOICING:
Invoices shall include the vendor name, date, and the purchase order number. Invoices shall be submitted to the TPOC for review and approval. An invoice at 50% of jobs completion may be submitted for payment. The TPOC will then forward the invoice to the NOAA finance office for processing.
| Statement of Work |
| NOAA Research Vessel MANTA |
| A] GENERAL INFORMATION |
| 1] This Statement of Work contains the requirements for shipyard services on the NOAA Research Vessel Manta R8301. |
| 2] The general characteristics of the vessel are as follows: |
| Length: 83 feet Beam: 30 feet |
| Draft: ~4 feet Displacement: ~78 long tons |
| 3] All work is to be accomplished at the Contractor’s facility, which will not exceed 50 miles from the vessel homeport at Texas A&M University in Galveston, Texas. NOAA will deliver the vessel to the Contractor’s facility, and redelivery will also b... |
| 4] Coordination of the work schedules will be the responsibility of the Contractor to avoid any delays or disruptions in order to meet the performance period. The Contractor will provide all facilities, labor, materials, tools, and services required... |
| 5] Upon arrival at the Contractor’s facility the contractor will accept full responsibility for the safety of the vessel, including but not limited to fire protection, security patrols, water-tight integrity, protection from adverse environmental cond... |
| 6] NOAA employees and contractors may be working on board the vessel during the contract performance period on a not to interfere basis. During this period it will be required that these personnel have full access to the vessel during normal working ... |
| 7] If the vessel is hauled from the water, the Contractor will ensure that all machinery and equipment used for that purpose is fully functional, suitable for the task, rated for loads at least 20% greater than the maximum weight of the vessel, and op... |
| 8] The government reserves the right to award some or all tasks defined herein, and to add tasks during the work period so long as cost and period of performance revisions, if any, are mutually agreed. |
| 9] All work performed under this SOW (or added to it during the period of performance) will meet or exceed all current requirements of ABYC and USCG (Subchapter T) as applicable to this size and type of vessel, in addition to any specific requirements... |
| 10] In the event defects or damage unrelated to the work tasks defined below are discovered, the Contractor will submit a Condition Found Report (CFR) to the TPOC. The CFR will define corrective actions needed, the cost for that work (separated into ... |
| 11] All welding required as part of the tasks defined below will be performed by welders certified by ABS or USCG working in accordance with welding procedures approved by ABS or USCG. Certifications and procedures issued by other nationally recogniz... |
| 12] NOTE: All work performed on the vessel will be accomplished as described below unless alternatives are presented in writing BEFORE the work commences and are agreed to by NOAA. |
| B] SPECIFIC WORK TASKS |
| Remove the vessel from the water. Pressure-wash the entire hull, including all surfaces within the tunnel, from sheer line to keel removing all dirt, grime, and marine growth. Similarly, clean all fittings below waterline, including propulsor compon... |
| Block the vessel in a level attitude with the keel (or keels) 36” minimum off the ground. During the cleaning process, temporarily shift individual blocks to ensure that all portions of the hull are cleaned. Inspect the hull, coatings, and all attac... |
| Upon completion of all work done on the hard, launch the vessel, inspect all compartments for leaks, and secure it dockside. If dockside testing or underway trials are required after launch, provide prior notification to the TPOC so NOAA personnel ca... |
| Prepare the hull surfaces to be painted and apply two coats of Interlux brand Micron-CF antifouling paint. Paint will be applied in accordance with the coating manufacturer’s application requirements. Provide an extra coat at the hull’s leading edge... |
| The Contractor will have an OEM representative or certified technician oversee the application process. Notify the TPOC after completion of painting. |
| The TPOC will provide 10 new hull anodes. Remove and inspect all 10 installed anodes; two each P/S side tunnel at frame W, and three each P/S at each transom, for a total of ten (10) anodes. Reinstall anodes after bottom paint work is complete. Ensu... |
| 4] Disassemble, clean, paint, reassemble jet parts |
| A] With the help of FGBNMS staff, disassemble the port and starboard jet drive parts from the transom and inspect all components. Clean the individual jet components of marine growth, using pressure wash, wire brushes, and similar hand tools. Clean al... |
| B] Prior to painting and reassembly, the TPOC and the Contractor will inspect wear ring on jet drive’s impeller race. Notify TPOC prior to this work so FGBNMS staff may observe. If wear ring is showing signs of wear and tear, a replacement will be o... |
| C] Repaint the jet parts with two coats of Micron CF anti-fouling paint and reassemble. The Contractor will use a blast medium approved for aluminum. Notify TPOC upon completion so they may inspect. |
| 5] Annual life raft service |
| Unship two each 16-person life rafts (DBC, SOLAS A) and transport to local DBC approved third party inspection service of yard’s choosing after consulting with TPOC. The third party will inspect and perform annual service on all rafts on yard’s accou... |
| a) Replace all hydraulic fittings with those of equal size, joint type, orientation, and pressure rating. Fittings will be zinc-plated carbon steel. |
| b) Replace all hydraulic hose assemblies with those of equal inside diameter, pressure rating, length, orientation, and fitting type. Hose fittings will be zinc-plated carbon steel. If protective covers are currently installed on any hoses, replace ... |
| c) Once all items above are complete, test the crane with the TPOC and demonstrate that no leaks exist. |
| d) On successful completion of testing, wrap all zinc-plated fittings (including those on hoses) with Densyl tape. |
| 8] Knuckle Crane Repairs |
| Recondition Morgan Company 703M2S Deck Crane, including the following maintenance: |
| a) Replace winch |
| b) Replace winch cable with stainless steel cable |
| c) Rebuild (4) hydraulic rotary actuators |
| d) Rebuild boom cylinder |
| e) Rebuild knuckle cylinder |
| f) Replace telescoping cylinders |
| g) Replace all hydraulic fittings with stainless steel |
| h) Replace all hydraulic feed tubes with stainless steel lines |
| i) Sand blast crane to bare metal, prime with Interlux Pre-Kote, and paint with Industrial Materials Corp. TIMC-02 marine enamel, black. |
| j) All new hardware (bolts, pins, nuts, etc.) |
| Repair will include removal of crane and reinstallation once the refurb is complete. Extra caution should be taken when removing knuckle crane to avoid hydraulic oil leaks. |
| 9] Replace port lazarette intake fan |
| The port lazarette vent fan is making non-normal noises. Access the fan and determine the source of the noise. If the fan and/or motor require replacement, obtain and install new components of the same make, model, and capacity. Before final assemb... |
| 10] New Chart Plotters |
| Procure and replace three chart plotters, including two in the wheel house and one in the aft control panel. Replace with Furuno NavNet TZTL12F Chart Plotter 12’ Touch Screen Display. Test per satisfaction of the TPOC. |
| 11] Abrade forward, midship, aft, and top deck |
| Upon completion, the contractor will demonstrate to the TPOC that all areas worked on are textured to the same degree as the samples. If any area is not profiled as required, repeat the profiling process in that area. |
| SITE VISIT: |