19-03437_Statement_of_Work_UV_Optical_Fibers.docm
DOCM document 156 KB Posted
- Attached to
- UV Optical Fibers
- Solicitation number
- NB688000-19-03437
About this file
Statement of Work for UV Optical Fibers
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Use this Statement of Work document to purchase an item and/or item-related services.
TITLE: UV Optical Fibers Requesting Lab/Division/Group: PML, Div. 688, Ion Storage Group Requisition Number: NB688000-19-03437 Statement of Need The Ion storage group requires 14 UV optical fiber patch cords to support development of optical frequency standards and quantum computing with trapped ions.
Items and/or item-related services
| Section |
| Requirements |
| Related Information |
Items/Service (required)
☐ See attached document Fiber type: LMA-10-UV Connector: FC-APC Connectorization must be compatible with high-intensity ultraviolet light for wavelengths as low as 235 nm. Connectors include a fiber endcap which protects the microstructure fiber while maintaining the mode quality.
Jacket: 3 mm PVC Specific lengths and quantities
| Length [m] |
| QTY |
| 0.5 |
| 2 |
| 0.75 |
| 2 |
| 1 |
| 4 |
| 2 |
| 2 |
| 3 |
| 2 |
| 6 |
| 1 |
| 7 |
| 1 |
Total QTY: 14
Enter related information here
Delivery ☐ N/A 12 weeks ARO ☒ Phased delivery is acceptable ☐ Software on USB / disk required ☐ Software electronic delivery acceptable Email address for software delivery
Enter related information here
Installation ☒ N/A N/A ☐ Site visit recommended
Enter related information here
Inspection and Acceptance ☐ N/A Inspection and acceptance is expected to take 14 days ☒ Government acceptance expected to take longer than 7 days Enter related information here
Warranty ☐ N/A 1 Year parts and labor If you require an Extended Manufacturer Warranty, describe the warranty requirements.
Period Length:Ex. month, 6 month, year etc.
Enter related information here
| ☐ Option Period 1 |
| ☐ Option Period 2 |
| ☐ Option Period 3 |
| ☐ Option Period 4 |
Training ☒ N/A
| Training requirements |
| Enter related information here |
Maintenance ☒ N/A Describe your maintenance requirements.
☐ See attached document for detailed maintenance specifications Period Length: Ex. month, 6 month, year etc.
Enter related information here
| ☐ Option Period 1 |
| ☐ Option Period 2 |
| ☐ Option Period 3 |
| ☐ Option Period 4 |
Repair ☒ N/A Choose an item.
Describe your repair requirements.
Period Length: Ex. month, 6 month, year etc.
Enter related information here
| ☐ Option Period 1 |
| ☐ Option Period 2 |
| ☐ Option Period 3 |
| ☐ Option Period 4 |
Government Furnished Material / Equipment ☐ N/A Bare LMA10-UV fiber sufficient to make all of the patch cords will be supplied by NIST Enter related information here
Travel ☒ N/A Describe any travel requirements Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
Enter related information here
Statement of Work: UV Optical Fibers Last Saved: 7/18/2019 12:07 PM Double-click on for further assistance.
image1.jpeg
File details come from the government source that posted it.