19-03437_Statement_of_Work_UV_Optical_Fibers.docm

DOCM document 156 KB Posted

Attached to
UV Optical Fibers
Solicitation number
NB688000-19-03437
Issued by

About this file

Statement of Work for UV Optical Fibers

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Use this Statement of Work document to purchase an item and/or item-related services.

TITLE: UV Optical Fibers Requesting Lab/Division/Group: PML, Div. 688, Ion Storage Group Requisition Number: NB688000-19-03437 Statement of Need The Ion storage group requires 14 UV optical fiber patch cords to support development of optical frequency standards and quantum computing with trapped ions.

Items and/or item-related services

Section
Requirements
Related Information

Items/Service (required)

☐ See attached document Fiber type: LMA-10-UV Connector: FC-APC Connectorization must be compatible with high-intensity ultraviolet light for wavelengths as low as 235 nm. Connectors include a fiber endcap which protects the microstructure fiber while maintaining the mode quality.

Jacket: 3 mm PVC Specific lengths and quantities

Length [m]
QTY
0.5
2
0.75
2
1
4
2
2
3
2
6
1
7
1

Total QTY: 14

Enter related information here

Delivery ☐ N/A 12 weeks ARO ☒ Phased delivery is acceptable ☐ Software on USB / disk required ☐ Software electronic delivery acceptable Email address for software delivery

Enter related information here

Installation ☒ N/A N/A ☐ Site visit recommended

Enter related information here

Inspection and Acceptance ☐ N/A Inspection and acceptance is expected to take 14 days ☒ Government acceptance expected to take longer than 7 days Enter related information here

Warranty ☐ N/A 1 Year parts and labor If you require an Extended Manufacturer Warranty, describe the warranty requirements.

Period Length:Ex. month, 6 month, year etc.

Enter related information here

☐ Option Period 1
☐ Option Period 2
☐ Option Period 3
☐ Option Period 4

Training ☒ N/A

Training requirements
Enter related information here

Maintenance ☒ N/A Describe your maintenance requirements.

☐ See attached document for detailed maintenance specifications Period Length: Ex. month, 6 month, year etc.

Enter related information here

☐ Option Period 1
☐ Option Period 2
☐ Option Period 3
☐ Option Period 4

Repair ☒ N/A Choose an item.

Describe your repair requirements.

Period Length: Ex. month, 6 month, year etc.

Enter related information here

☐ Option Period 1
☐ Option Period 2
☐ Option Period 3
☐ Option Period 4

Government Furnished Material / Equipment ☐ N/A Bare LMA10-UV fiber sufficient to make all of the patch cords will be supplied by NIST Enter related information here

Travel ☒ N/A Describe any travel requirements Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.

Enter related information here

Statement of Work: UV Optical Fibers Last Saved: 7/18/2019 12:07 PM Double-click on for further assistance.

image1.jpeg

File details come from the government source that posted it.