16-04107_SPECIFICATIONS_24_Aug_16.pdf
PDF 259 KB Posted
- Attached to
- Purchase & Install Generator & Switch Federal contract opportunity
- Solicitation number
- NB688000-16-04107
About this file
Specification dated 24 Aug 16
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Generator_and_ATS_Photos.pdf | ||
| This_is_a_combined_synopsis_24_Aug_16.pdf | ||
| Amendment_002.docx | DOCX document | |
| Final_Revised_Specs.docx | DOCX document | |
| Amendment_001.docx | DOCX document | |
| Revised_SPECS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Generator & Automatic Transfer Switch (ATS) Upgrade
Dated 24 Aug 16
1.0 BACKGROUND:
The National Institute of Standards and Technology (NIST) maintains the standards for time and frequency for most users in the United States. NIST provides a variety of services designed to deliver time and frequency signals to the people who need them. The signals are broadcast via several mediums, including high and low frequency radio, the Internet, and telephone lines. These signals are used to synchronize millions of clocks every day, throughout the United States and around the world.
2.0 PURPOSE:
NIST Time and Frequency Radio Station WWV requires a new Emergency back-up generator and automatic transfer switch. The current generator and transfer switch has become unreliable. In case of loss of commercial power, the new units will supply standby power to the building. Our group depends on the standby emergency power to fulfill our mission. Equipment must be able to tolerate the unique pulsating load imposed by the WWV transmitters.
3.0 STATEMENT OF WORK (SOW)
3.1 GENERAL:
3.1.1 Other than ordering and delivering equipment & supplies no work may begin on the site until January 3rd 2017.
3.1.2 All work must be completed and inspected for operational reliability before March 17th
2017.
3.1.3 Equipment installation will require connections to the building electrical distribution equipment. This equipment may be de-energized for no more than 16 hours total, consisting of two consecutive days of 8 hour periods during normal working hours. Power must be restored in between these outages. The power outages must be coordinated with the COR no less than 14 days prior to the proposed outage. Any additional coordination with outside utility companies is the sole responsibility of the contractor.
3.1.4 A kick-off meeting will be required for contractor principles within 30 days of award.
3.1.5 An equipment removal & installation plan must be presented at the kick-off meeting for approval before work may proceed.
3.1.6 A safety plan including a Job Hazard Assessment (JHA) must be presented at the kick-off meeting for approval before work may proceed.
3.1.7 Any equipment, materials, or debris removed from the site in reference to the SOW will be disposed of by the contractor in accordance with federal and local disposal regulations.
3.1.7.1 All equipment removed and installed will need to fit through an 8’ tall & 9’ wide garage door
3.1.8 Any visits to the site must be coordinated with the COR and Radio Station staff. Deliveries will be made to 5701 N HWY 1 Fort Collins Colorado, 80524
3.1.9 All materials necessary to complete the project will be on-site on or before January 3rd 2017.
3.1.10 Two copies of all maintenance and operational manuals will be provided for each piece of purchased equipment and shall be provided to the COR.
3.1.11 NIST anticipates that the generator and all other components will be capable of safely providing emergency backup power within 3 weeks or less from the start of work.
3.2 SPECIFIC:
3.2.1 Generator Guidelines
3.2.1.1 250 Kw diesel powered commercial standby generator set 120 / 208 Volt, 60Hz, 3 phase
(Cummins QSL9-G7 series, model DQDAA or equivalent) and fit inside designated footprint
(119” long, 50” wide, 70” high).
3.2.1.2Alternator must be rated for 60 Hz, of the 12 Lead reconnectable type and include extended range and increased motor starting (IMS) capability. Due to the pulsating load, alternator must be sized such that temperature rise will not exceed 80 degrees C at 290 kW.
3.2.1.3 Generator engine shall be capable of producing at least 464 HP at 4900 feet elevation, at
40 degrees C ambient temperature.
3.2.1.4 The engine starting voltage shall be 24 volts DC.
3.2.1.5 Equipment must include manufacturer recommended engine starting batteries.
3.2.1.6 Equipment must meet NFPA 110 Level 1 requirements for single step load shifting.
3.2.1.7 Equipment must include automatic starting and stopping capability accessible from the
ATS.
3.2.1.8 Equipment must include local controls for Generator Off, On, and automatic mode.
3.2.1.9 Equipment must provide local display for fault history, start attempts/starts/runtime hours, and load percentages.
3.2.1.10 Equipment must include internal protection for overcurrent and short circuit events, phase fault, over- and under-voltage and frequency events, and shutdown for reverse power events.
3.2.1.11Equipment must include a side Inlet, end outlet muffler with 6” ASA Flanges
3.2.1.12 Equipment must include 120 volt AC, Single Phase coolant heater
3.2.1.13 Equipment must include Vibration Isolators: Seismic-2000LB Rated Load
3.2.1.14 Equipment must include A remote annunciator/display (part of Cummins PCC-2100 control system, or equivalent), to be mounted in the hallway adjacent to the generator room
3.2.1.15 Equipment must include 4” NPT to 6” ASA Conversion pipe package (required for
Cummins generator)
3.2.1.16 Equipment must include Slip On exhaust connector (required for Cummins generator)
3.2.1.17 Equipment must include a Factory Certified Test Record
3.2.2 Automatic Transfer Switch (ATS) Guidelines
3.2.2.1 1000 AMP Transfer Switch (Cummins OTEC 1000 amp or equivalent)
3.2.2.2 Transfer switch must be from the same manufacturer as the generator and be fully compatible
3.2.2.3 Transfer switch must include user accessible dry contacts indicating switch is in emergency position
3.2.2.4 Transfer switch must include user accessible dry contacts indicating switch is in normal position
3.2.2.5 Transfer switch must include a generator exercise Clock, without switching the load
3.2.2.6 Enclosure: Type 1, interior
3.2.2.7 Transfer switch must be 120 / 208 Volt, 60 Hz, 3 phase
3.2.2.8 Transfer switch must fit inside existing equipment footprint of 45” wide X 36” deep
3.2.2.9 Transfer switch shall be an interior wall mount style switch. The contractor has the option of modifying the existing support structure or installing a new structure.
3.2.3 Generator & ATS Installation Guidelines
The contractor shall:
3.2.3.1 Remove old Generator and Transfer Switch (Caterpillar Generator Model D343 Series A, Engine Serial No. 62B845. Generator is 110” long, 50” wide, 70” high)( custom-built switch made by Electrical Equipment and Engineering Company and existing electrical connections.
Switch is 36” deep, 45” wide, and 90” tall and weighs approximately 700 pounds)
3.2.3.2 Install new 250kW Generator and new compatible 1000-amp Transfer Switch.
3.2.3.3 Increase wall opening size for generator exit cooling if necessary. The size of the exit cooling opening must meet manufacturer’s recommendations. The current exit cooling opening is in a wall made of eight-inch concrete cinder block.
3.2.3.4 Run new electrical cable through code compliant conduit between electrical panels and
Transfer Switch, based on manufacturers recommendations and NEC codes.
3.2.3.5 Run new control wire between generator and transfer switch, based on manufacturers recommendations.
3.2.3.6 Connect diesel fuel lines and exhaust pipe
3.2.3.7 Perform post-installation operational test including load bank test and certify that equipment is performing to specifications in the presence of the COR.
4.0 DELIVERABLES & PAYMENT SCHEDULE
Number/
Reference
Description Format Quantity Due Date Payment
Schedule
1/ 3.1.4 Kick-Off Meeting In Person One for
Contractor
Principles
Within 30 days of
Award
2/ 3.1.6 Job Hazard Assessment In Person One Kick-Off
Meeting
3/ 3.1.6 Safety Plan In Person One Kick-Off
4/ 3.1.5 Equipment Removal &
Installation Plan
In Person One Kick-Off
5/ 3.2.1 250 Kw Diesel Generator
(Cummins QSL9-G7 series, model DQDAA or equivalent)
In Person One No later than
01/03/2017
6/ 3.2.2 1000 AMP Automatic Transfer
Switch (Cummins OTEC 1000 amp or equivalent)
In Person One No later
7/ 3.1.9 All other Materials necessary for the complete installation of the specified generator and transfer switch
In Person One No later
8/ 3.2.1.17 Factory Certified Test record for generator
In Person One Prior to installation of generator
9/ 3.1.10 Operation & Maintenance manuals
One hardcopy and one
Two No later than date of electronic installation
10/ 7.0 Final Acceptance Testing In Person One No later
3/17/2017
5.0 TECHNICAL CONSIDERATIONS:
No permitting is required. Work to be coordinated with COR, station personnel and local utility if necessary.
6.0 GOVERNMENT FURNISHED PROPERTY OR INFORMATION:
N/A
7.0 INSPECTION AND ACCEPTANCE:
7.1 The Government inspection and acceptance period will be seven (7) business days.
7.2 In addition to the inspection and acceptance terms articulated in 52.212-4, the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the generator & transfer switch is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
7.3 All components will be visually inspected upon receipt by the COR for observable damages and flaws. If damages and/or flaws are observed, these components will be returned to the
Contractor at the Contractor’s sole expense. The COR will notify the Contractor via email, within five (5) business days of observing the damage that the components are being returned. If damages and/or flaws are not observed, the components will be installed by the contractor. If components fail to be fully operational and/or do not demonstrate operation to the minimum specifications, the non-functional components will be returned to the Contractor at the
Contractor’s sole expense. The COR will notify the Contractor via email, within five (5) business days of observing the damage.
7.4 The acceptable equipment and installation shall meet all technical specifications. Installation shall meet all required electrical, building, and Government Codes. Final inspection will be conducted by NIST within seven (7) business days after project is complete.
8.0 ATTACHMENT:
8.1 WWV One Line Electrical Drawing and photos is attached to provide reference for specification requirements to the Contractor.
8.2 All attachments included in this solicitation are owned by the Government and shall not be reproduced, released, distributed, or otherwise utilized for any purpose other than submission of a quotation and the execution of the required work without the prior written approval of the NIST
Contracting Officer.
8.2.1 Attachment 1: WWV One Line Electrical.pdf
8.2.2 Attachment 2: Generator and ATS Photos
9.0 PAYMENT SCHEDULE:
9.1 The Contractor shall be paid, in accordance with Net 30-day payment terms, upon receipt and acceptance of a proper invoice for the entire purchase order, in accordance with the following schedule.
9.1.1 The contractor shall provide an appropriate payment schedule.
File details come from the government source that posted it. Updated .