This document is a set of requirements and specifications for a federal contract opportunity from the National Institute of Standards and Technology (NIST) for the purchase of 44 liters of helium-3 gas. The Advanced Microwave Photonics Group at NIST requires the helium-3 gas to commission dilution refrigerator cryostats for testing and measurement of superconducting quantum circuits. NIST intends to negotiate a sole source award with Linde Gas & Equipment Inc. for this requirement under the authority of FAR 13.106-1(b) due to the specialized nature of the gas. The gas must meet specific purity and volume requirements, and be delivered in an appropriate gas cylinder. The requirement includes delivery to the specified location and installation, but no other services. NIST is allowing interested parties to demonstrate their capability to meet the requirement in writing by the response date in order to determine if competitive procedures could be used. An award is anticipated by 08/09/2024.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specifications: Helium 3 for Advanced Microwave Photonics Group 1 Version 1.0 (2019) Double-click on for further assistance.

Use this document to detail specifications/requirements for an item and/or ancillary services.

TITLE: Helium 3 for Advanced Microwave Photonics Group Requesting Lab/Division/Group: PML/Applied Physics Division/Advanced Microwave Photonics Group (686.05)

NB686050-24-02260

General Statement of Need The Advanced Microwave Photonics Group requires helium-3 gas to commission dilution refrigerator cryostats for the testing and measurement of superconducting quantum circuits.

The amount (44 liters) is required for the operation of newly purchased dilution refrigerators.

The Helium 3 gas must be delivered in an appropriately sized gas cylinder.

Items and/or Ancillary Services

Item 1: Helium-3 Quantity: 44 liters Specifications: 44 STP liters of 99.9AT% purity helium-3

Separately Priced Options and Services:

Item 2: [List minimum specifications.

Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]

List any other item(s) or service requirements here using the same format above.]

Service Requirements / Item Specifications Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain requirement here]

☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]

Shipping & Delivery ☐ N/A

Contractor is responsible for all shipping costs. Contractor should send all parts to:

325 Broadway st

MS 686.05

Boulder, CO 80305

Shipping criteria:

☐ Partial delivery acceptable

Requirements / Specifications: Helium 3 for Advanced Microwave Photonics Group 2

☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock

☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here]

Delivery date criteria:

☐ Delivery of goods, installation, and training shall be completed no later than:

[Insert date here] ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]

Electronic Media ☒ N/A

[Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]

Installation ☒ N/A

[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.

Facility / Utility Considerations ☒ N/A

[List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s)

[List any Work Order Number(s) here] ☐ Power available

Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here]

☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]

Requirements / Specifications: Helium 3 for Advanced Microwave Photonics Group 3

Warranty ☒ N/A

Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]

Training ☒ N/A

[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:

☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here]

☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.

Inspection and Acceptance ☐ N/A

Visual inspection and acceptance based on volume of helium gas ☒ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]

Maintenance ☒ N/A

[Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?

☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here]

☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)

☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4

Government Furnished Material / Equipment ☒ N/A

[List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian)

Serial Number: [Enter Serial Number here] Description: [Enter description here]

Requirements / Specifications: Helium 3 for Advanced Microwave Photonics Group 4

NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]

Travel ☒ N/A

Helium 3 for Advanced Microwave Photonics Group ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.

Provide suggestions to improve this form by clicking here.

https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx

Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: Helium 3 for Advanced Microwave Photonics Group
Requesting Lab/Division/Group: PML/Applied Physics Division/Advanced Microwave Photonics Group (686.05) NB686050-24-02260
General Statement of Need
Provide suggestions to improve this form by clicking here.