Nashville Pharmacy Compounding Space RCP.pdf
PDF 753 KB Posted
- Attached to
- Q301--BI-ANNUAL CERTIFICATION AND MONTHLY PHARMACY STERILE SAMPLING Federal contract opportunity
- Solicitation number
- 36C24920Q0426
About this file
This solicitation requests quotations for bi-annual certification and monthly viable surface and air sampling services for sterile compounding areas at two Veterans Affairs medical centers in Nashville and Murfreesboro, Tennessee. Services include certification of engineering controls, HEPA filter testing, room pressure differentials and air changes, along with monthly viable air and surface sampling with identification of colony forming units. Quotations should be submitted by September 18, 2020 and include unit pricing for certification and sampling services broken out by location, along with overnight shipping, report generation, and technician fees. The period of performance is a one-year base period from October 1, 2020 to September 30, 2021 with four one-year option periods to September 2025. The solicitation is set aside for small businesses and award will be made to the lowest priced offer meeting requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C248920Q0426 Lineitems.xlsx | XLSX spreadsheet | |
| 36C24920Q0426.docx | DOCX document | |
| Nashville Pharmacy Compounding Space Room Layout.pdf | ||
| 01-18-262_Arch_FCD 4.pdf | ||
| 01-18-262_Arch_FCD 7.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
OS
OS
OS
OS
OS
OSOS
OSOS
VS
OS
OS
OS
OS
OS
OS
OS
E
E E
E
E
E
E
CORRIDOR
C1-21
PHARMACISTS
PROCESSING
AREA
1-G134A
PHASE 1 PHASE 2
EXISTING TO
REMAIN
D
E
F
161514 17
D
E
F
161514 17
PRO TECH
1-G134J
ELECTRICAL
CLOSET
G-104
DATA
G-103
VAULT
1-G134I
OUTPATIENT
FILLING/ASSEMBLY
1-G134
CORRIDOR
C1-21A
8' - 0" ACT 2x2
8' - 0"
ACT 2X2
8' - 0"
ACT 2X2
8' - 0" ACT 2x2
8' - 0" ACT 2x2
8' - 0"
MCRC
8' - 0"
MCRC
8' - 0"
MCRC
8' - 0"
MCRC
8' - 0" ACT 2x2
8' - 0"
MCRC
8' - 0"
MCRC
8' - 0"
MCRC
EXISTING TO
REMAIN
MALE
TOILET
G-108
HD PREP
C1-32
FEMALE
TOILET
G-106
HD
STORAGE
G-107
BCG
G-107B
HD
BUFFER
G-107C
IV
STORAGE
G-107KHD
ANTEROOM
G-107A
BCG
COUNTER
G-107D
HD
COUNTER
G-107E
IV PREP
G-107G
IV
ANTEROOM
G-107F
IV PREP
G-107H
IV
SET-UP
G-107I
I.P.
SUPER
1-G134F
SUPERVISOR
OFFICE
G-107J
NON-STERILE
COMPOUNDING
1-G134D
HD
STORAGE
CORRIDOR
G-107L
8' - 0" ACT 2x2
8' - 0"
MCRC
7' - 7 1/2"
GYP
7' - 7 1/2"
GYP
REFER TO SHEET A-502
FOR SOFFIT DETAILS
REFER TO SHEET A-502
FOR SOFFIT DETAILS
2' X 2' SUSPENDED
ACT CEILING SYSTEM
MODULAR CLEAN
ROOM CEILING
(MCRC)
2" PREMANUFACTURED
CLEAN ROOM WALLS
GYPSUM BOARD ON
STEEL STUDS
REFLECTED CEILING PLAN
LEGEND
DENOTES MODULAR
CLEAN ROOM
CEILING SYSTEM
CEILING HEIGHT
DESIGNATION
(WHEN HEIGHT
VARIES FROM
TYPICAL)
FLUORESCENT
LIGHT FIXTURE
4"x4' RECESSED
LED FIXTURE
EQ. A EQ. A
E Q
B
E Q
B
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
SUPPLY DIFFUSER
RETURN GRILL
PENDANT
MOUNTED LIGHT
DOWN LIGHT
FIXTURE
CEILING CONTRACTOR TO MEASURE EACH CEILING
AREA AND ESTABLISH A CEILING LAYOUT TO BALANCE
BORDER WIDTHS AT OPPOSITE EDGES OF EACH
ROOM. AVOID USE OF LESS-THAN 6" TILES.
A.F.F.10' 6"
PERIMETER
RECESSED WALL
SLOT LIGHT
FIXTURE
EXTERIOR WALL
SCONCE
FIRE ALARM
STROBE
FAA
FIRE ALARM
ANNUCIATOR
F
FIRE ALARM PULL
STATION
FIRE ALARM
STROBE LIGHT
S
H
HEAT DETECTOR
SMOKE DETECTOR
FIRE ALARM /
HORN /
STROBE LIGHT -
WALL MOUNTED
FIRE ALARM / HORN
STROBE LIGHT -
CEILING MOUNTED
SPRINKLER HEAD
SPRINKLER HEAD
2'x4' LAY-IN LED
RETURN GRILL
EXHAUST GRILL
DENOTES
PERFORATED
METAL
SOFFIT/CEILING
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
EXISTING 1 HR - SMOKE WALL
NEW 1 HR - SMOKE WALL
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:2
P
M
A-110
FIRST FLOOR REFLECTED CEILING
PLAN
11 18DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
05/14/2019
FINAL CONSTRUCTION DOCUMENTS
626-18-50118-263
0 4 8 16
NORTH
PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR REFLECTED CEILING PLAN
CEILING LEGEND
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
WALL TYPES
1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING,
TECHNOLOGY, AND FIRE PROTECTION DRAWINGS
FOR ADDITIONAL NOTES, TYPES, AND LOCATIONS
OF CEILING FIXTURES.
2. GENERAL CONTRACTOR IS RESPONSIBLE FOR
COORDINATING DESIGN AND LOCATION OF
SPRINKLER HEADS. SPRINKLER HEADS SHALL BE
CENTERED ON THE CEILING TILE, TYPICAL.
3. CONTRACTOR SHALL COORDINATE HEIGHTS OF
ALL EQUIPMENT AND PIPING IN CEILING PLENUMS
TO ACHIEVE DESIRED CEILING HEIGHTS.
4. ALL NEW CEILING INSTALLATIONS SHALL BE AT A
HEIGHT OF 8' - 0" A.F.F., TYPICAL, UNLESS
OTHERWISE NOTED.
DocuSign Envelope ID: 60A5663F-46E3-4E72-8918-25FE3C19448B
5/14/2019
File details come from the government source that posted it. Updated .