N6945018R0701_Amendment_0003.pdf

PDF 147 KB Posted

Attached to
Mission Training Complex, Shaw AFB, Sumter, South Carolina Federal contract opportunity
Solicitation number
N6945018R0701
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This is an amendment to solicitation N6945018R0701 for the construction of a Mission Training Complex at Shaw Air Force Base in Sumter, South Carolina. The amendment revises the project description to clarify that the demolition of the existing Battle Command Training Center may not commence until 90 days after completion of the new Mission Training Complex. It also extends the proposal due date to September 7, 2018 at 2:00pm Eastern Time. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command for the construction of a one-story Mission Training Complex to support digital and battle staff training, organized into non-secure administration and secure training areas. Site work will include utilities, stormwater management, security fencing, parking, and landscaping.

N6945018R0701_Amendment_0003.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Mission Training Complex, Shaw AFB, Sumter, South Carolina, newest first.
File Type Posted
N6945018R0701_Amendment_0007.pdf PDF
N6945018R0701_Amendment_0006.pdf PDF
N6945018R0701_Amendment_0005.pdf PDF
N6945018R0701_Amendment_0004.pdf PDF
N6945018R0701_Amendment_0002.pdf PDF
N6945018R0701_Amd0001.pdf PDF
N69450_18_R_0701.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP N69450-18-R-0701, Mission Training Complex, Shaw AFB, Sumter, SC.

See Continuation Page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945018R0701

X 9B. DATED (SEE ITEM 11)

26-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Aug-2018

CODE

NAVFAC SOUTHEAST

SOUTH CENTRAL

BLDG 903, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6945018R0701

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

The purpose of this amendment is to:

1) Make revisions as follows:

SECTION 01 11 00, PART 1 GENERAL, 1.2.1 Project Description (Drawings & Specs)

REMOVE:

The work includes The Shaw Air Force Base (AFB) MTC Facility is a small standard design Mission Training Complex (MTC) as defined in the Mission Training Complex (MTC) Planning Guide, dated 6 September 2011. The MTC will be a one story structure designed to support individual and collective digital training and battle staff training using constructive simulations with command, control, communications, computers and intelligence (C4I) interoperability. The main components of the MTC are organized into a 'non-secure' administration area and a 'secure' training area with the entire building, exclusive of the central lobby, being designed as a "Controlled Access Area CAA". A central Lobby, adjacent to the administration area, functions as the access checkpoint for employees, students, and visitors. A separate Security Access Facility (SAF) is also included as part of the overall complex.

Site improvements will include but not be limited to clearing and grubbing, site grading, utility services, storm water management, security fencing, Tactical Operation Center (TOC) pads, concrete sidewalks, ramps, and stairs, dumpster pad, access roads, vehicular parking, landscaping, and erosion and sediment control.

A separate site housing the existing Shaw AFB Battle Command Training Center (BCTC) exists to the northwest of the MTC site. That building will be demolished following occupancy of the new MTC and its concrete paved site turned into a full-functioning TOC area in support of this project's MTC and incidental related work.

REPLACE WITH (Changes are in Bold):

The work includes The Shaw Air Force Base (AFB) MTC Facility is a small standard design Mission Training Complex (MTC) as defined in the Mission Training Complex (MTC) Planning Guide, dated 6 September 2011. The MTC will be a one story structure designed to support individual and collective digital training and battle staff training using constructive simulations with command, control, communications, computers and intelligence (C4I) interoperability. The main components of the MTC are organized into a 'non-secure' administration area and a 'secure' training area with the entire building, exclusive of the central lobby, being designed as a "Controlled Access Area CAA". A central Lobby, adjacent to the administration area, functions as the access checkpoint for employees, students, and visitors. A separate Security Access Facility (SAF) is also included as part of the overall complex.

Site improvements will include but not be limited to clearing and grubbing, site grading, utility services, storm water management, security fencing, Tactical Operation Center (TOC) pads, concrete sidewalks, ramps, and stairs, dumpster pad, access roads, vehicular parking, landscaping, and erosion and sediment control.

A separate site housing the existing Shaw AFB Battle Command Training Center (BCTC) exists to the northwest of the MTC site. That building will be demolished following occupancy of the new MTC and its concrete paved site turned into a full-functioning TOC area in support of this project's MTC and incidental related work. The

N6945018R0701 demolition of the existing Shaw AFB Battle Command Training Center may not commence until 90 days after the completion of the new Mission Training Complex, this is to allow time for operations to shift from the existing facility to the newly constructed facility.

2) Extend the proposal due date to Friday, September 7, 2018 at 2:00pm Eastern Standard Time.

All other solicitation terms and conditions remain unchanged.

ACKNOWLEDGEMENT OF THIS AMENDMENT IS REQUIRED WITH YOUR PROPOSAL

SUBMISSION.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .