N6883618R0021_DRAFT_APES_SOW_NASCC.docx
DOCX document 38 KB Posted
- Attached to
- Aircraft protective Equipment
- Solicitation number
- N6883618R0021
About this file
N6883618R0021_DRAFT_APES_SOW_NASCC.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6883618R0021_Sources_Sought_APE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
*******DRAFT*******
Description of Requirements
Protective Shades for T-6 and T-44 Aircraft
Project Description and Location:
This project requires the design, fabrication, and installation of protective shades, designated as aircraft protective equipment (APE), to cover T-6B turboprop aircraft and T-44 multi-engine aircraft at Naval Air Station Corpus Christi in Corpus Christi, TX. The purpose is to protect aircraft from sun exposure and possible hail damage. The site plan is for the following:
· (24) Double T-6 APE’s to be built along rows Bravo through Echo surrounding hangar 55.
· (1) Single T-6 APE’s to be built along rows Bravo through Echo surrounding hangar 55.
· (35) Single T-44 APEs on rows Echo through India adjacent to hangars 56, 57 and 58.
The Contractor shall provide the most cost effective solution to meet space and clearance requirements. Design shall ensure Navy clearance requirements are achieved.
Dimensions and Clearances:
The T-6 aircraft dimensions are 33’-5” wingtip span, 33’-4” in length, and 10’-8” in height. The T-44 aircraft dimensions are 50’-3” wingspan, 35’-6” in length, and 14’-3” in height.
Minimum clearances as required by the U.S. Navy are 10’ wingtip clearance and 3’ vertical clearance between the highest point of the aircraft and the underside of the shade supporting structure. The minimum height shall be maintained for the full width and length of the shade. Shades shall conform to airfield clearance requirements determined by documented site approval.
Coverage:
Overhead coverage is the primary objective of the covers. Ends shall be open. Side coverage is not required, but, if normally provided as a standard feature of the structure, sides shall not extend below 10’. All shades shall be drive-thru configuration with no obstructions in the ends below the minimum interior height.
Performance Requirements
1. Warranted for 10 years minimum. Copy of the warranty is required with the quote. Minimum grab tensile strength shall be 650 lbs/sq. in. The desired life is 15 to 20 years. Fabric shall have chemical, fire and UV resistance properties and shall be addressed in specific terms in the proposal.
2. All tubular steel frames are to be galvanized, all structural steel painted, and other metals to be suitably coated to resist damage and corrosion in service. Contractor is to provide copy of warranty on coatings. Shades shall be certified by a Professional Engineer to conform to Uniform Building Code. The steel should meet ASTM A123/A123 due to the proximity to salt water.
3. All connections, fabrication, workmanship, erection, and details shall be in accordance with AISC Manual of Steel Construction as applicable to the proposed solution. All tabs and mounting plates to be hot-dipped galvanized before welding. All welds to be hand brushed with 97 percent zinc cold galvanizing. All connections shall be A325 structural grade minimum 5/8” bolts or better. All hardware should meet ATSM A153/A154 due to the proximity of salt water.
4. Shades and structure shall be designed to withstand sustained wind of 149 M.P.H in compliance with the UFC 3-301-01, 1 June 2013, Change 3, 12 September 2016. Design wind speed requirement for Corpus Christi are listed as; Risk Category II, 149MPH. The shades shall be designed to withstand hail up to 1.5 inches in diameter with fabric in place.
5. The parking apron where the APEs will be erected consists of asphalt and concrete. The concrete section varies in thickness from 6-12 inch Portland concrete. The Contractor shall have a Registered Professional Engineer design and certify the methods of connection between the shade and the concrete and the shade and asphalt. The Contracting Officer’s Representative (COR) will review and approve the designs prior to the beginning of installation. Additionally, the Contractor shall coordinate with the COR for inspection of shelter connections prior to continuing with the remaining shelter installation and for inspection of completed structures prior to installation of fabric.
Installation:
All shipping, handling, storage, assembly, site equipment and labor shall be included in the proposed price. The Contractor shall submit a site plan for set up not later than 30 days After Receipt of Order (ARO). The site plan shall be coordinated with the COR for site safety and facility engineers to establish an acceptable work plan which shall include a work phasing plan, CAD drawing layout of shades, and location of continuous foreign object debris (FOD) fence around the work perimeter. Work phasing shall be coordinated with the COR for the local activity to allow adequate parking for aircraft during set up of the shades. The Contractor shall complete set up and Government acceptance of one work area before proceeding to the next phase. Site clean-up shall be continuous.
Offers not including all delivery and set up shall be considered non-responsive and shall be excluded from award without notice.
Lightning protection:
Shelter solution shall include adequate lightening protection as part of installation.
Fabric Removal and Re-installation:
If proposed, the Contractor shall provide a detailed instruction for the removal and re-installation of the fabric cover by the customer. By following instructions, customer must be able to remove/re-install fabric cover without damage to the fabric or attachments, and without voiding the fabric warranty.
Maintenance manual:
The Contractor shall provide the Government with detailed, written procedures for mandatory preventative maintenance of the shades to preclude voidance of the warranty and to extend the service life of the shades.
Shipping and storage:
The Contractor shall provide all shipping. The Government will provide appropriate staging areas for materials and equipment on the facility, however Contractor is responsible for receipt of material and the safety/security of materials and equipment whether stored or installed, until accepted by the Government.
Delivery:
The Contractor shall propose a delivery schedule that supports the proposed phased installation plan. CAD drawings are required 30 days after ARO. Delivery and installation shall begin no later than 90 days ARO and completed no later than 180 days ARO. The proposed delivery and installation phasing plan shall be approved by the COR.
Delivery Phasing:
TBD
Contracting Officers Representative:
TBD
WORK RESTRICTIONS
Special Scheduling Requirements:
Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
The Contractor shall conduct operations so as to cause the least possible interference with normal operations of the activity.
Permission to interrupt any activity roads, railroads, and/or utility service shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
Flight Line Driver’s License:
Personnel driving on the flight line will be required to get a NAS Corpus Christi Field flight line driver’s license. Coordinate with the COR.
Contractor Employment Eligibility Verification:
Contractors and subcontractors are required to abide by Department of Homeland Security requirements for verification of worker employment eligibility. This is in support of detection and apprehension of illegal alien/undocumented workers. To this end, base access procedures for badge issuance include on-site verification of base sponsorship and supporting documentation. The Government has implemented DBIDS base access procedures. Under DBIDS, employee badges may be obtained either by visiting the Pass and ID Office daily or utilizing the DBIDS Program. The cost of the RAPIDGate program includes a fee for the Contractor's firm and a fee per Contractor employee for use of the program. Contractors who choose not to participate in the program will be required to obtain daily business passes at the pass office. Badges/passes are the property of the Government and must be displayed as required by the Installation Security Department. RAPIDGate badges remain the property of DBIDS, and as such must be returned within two calendar days to the employer when an employee leaves the Contractor's service. It is the sole responsibility of the Contractor to see that all badges issued to their employees are returned in accordance with these provisions. Upon expiration of the contract, all employees' passes and badges shall be deactivated and the base access privileges revoked until such time base access is again required/authorized. Due diligence on your part in screening employees is required because the Government is not responsible for work Delays or Stoppages caused by the Contractor/sub-contractor's failure to comply with registration and access requirements, nor is the Government responsible for program fees lost due to ineligible personnel. Also be aware, that the Contracting Officer is required to consider debarment proceedings where repeated or egregious violations of access control requirements are found. In addition to these provisions the Contractor shall also comply with all additional base procedures for applying to obtain commercial passes for entry to this facility. To obtain additional information regarding base access, please contact the pass and ID office at 361-961-1356.
It should be recognized that requirements for security and base access varies between bases as well as between various locations within individual bases. It is incumbent on the Contractor to ascertain the current security and base access requirements appropriate to the project location and incorporate the cost, if any, for compliance to said requirements into Contractor's proposal. Lack of knowledge of current requirements does not constitute a basis for an adjustment to the contract. Should requirements change during the construction timeframe, Contractor may be eligible, subject to documentation acceptable to the Government, for an adjustment to the contract.
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.
Subcontractors and Personnel Contacts.
Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
No Smoking Policy.
Smoking is prohibited within and outside of all buildings on installations except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The COR will identify designated smoking areas.
Working Hours:
Working hours will be coordinated with the COR at NAS Corpus Christi.
SPECIAL PROJECT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only U.S. FEDERAL AVIATION ADMINISTRATION
(FAA)
FAA AC 150/5300-13 (Basic; Changes 1 thru 8) Airport Design
FAA AC 70/7460-1 (Rev K; Change 1) Obstruction Marking and Lighting
1.2 DEFINITIONS
1.2.1 Landing Areas:
"Landing Areas" means:
a. The primary surfaces, comprising the surface of the runway, runway shoulders, and lateral safety zones. The length of each primary surface is the same as the runway length. The width of each primary surface is 1500 feet (750 feet on each side of the runway centerline).
b. The "clear zone" beyond the ends of each runway is the extension of the primary surface for a distance of 3000 feet beyond each end of each runway.
c. All taxiways, plus the lateral clearance zones along each side for the length of the taxiways (the outer edge of each lateral clearance zone is laterally 250 feet from the far or opposite edge of the taxiway (example: a 75-foot-wide taxiway shall have a combined width and lateral clearance zone of 425 feet.)
d. All aircraft parking aprons, plus the area 125 feet in width extending beyond each edge all around the aprons.
1.2.2 Safety Precaution Areas:
“Safety Precaution Areas” means those portions of approach-departure clearance zones and transitional zones where placement of objects incident to contract performance might result in vertical projections at or above the approach-departure clearance, or the transitional surface.
a. The “approach-departure clearance surface” is an extension of the primary surface and the clear zone at each end of each runway, for a distance of 50,000 feet, first along an inclined (glide angle) and then along a horizontal plane, both flaring symmetrically about the runway centerline extended.
(1) The inclined plane (glide angle) begins in the clear zone 200 feet past the end of the runway (and primary surface) at the same elevation as the end of the runway. It continues upward at a slope of 50:1 ((1) one foot vertically for each 50 feet horizontally) to an elevation of 500 feet above the established airfield elevation. At that point the plane becomes horizontal, continuing at that same uniform elevation to a point 50,000 feet longitudinally from the beginning of the inclined plane (glide angle) and ending there.
(2) The width of the surface at the beginning of the inclined plane (glide angle) is the same as the width of the clear zone. It then flares uniformly, reaching the maximum width of 16,000 feet at the end.
b. The “approach-departure clearance zone” is the ground area under the approach-departure clearance surface.
c. The “transitional surface” is a sideways extension of all primary surfaces, clear zones, and approach departure clearance surfaces along inclined planes.
(1) The inclined plane in each case begins at the edge of the surface.
(2) The slope of the incline plane is 7:1 ((1) one foot vertically for each (7) seven feet horizontally). It continues to the point of intersection with the —
(a) Inner horizontal surface (which is the horizontal plane 150 feet above the established airfield elevation); or
(b) Outer horizontal surface (which is the horizontal plane 500 feet above the established airfield elevation), whichever is applicable.
d. The “transitional zone” is the ground area under the transitional surface. (It adjoins the primary surface, clear zone, and approach-departure clearance zone.)
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
· SD-01 Preconstruction Submittals
· Heavy Equipment and Vehicle List
· Construction Operations Plan
· Safety Plan
· Schedule of Work
PART 2 PRODUCTS
2.1 AIRFIELD OBSTRUCTION LIGHTS:
Airfield obstruction lights shall conform to FAA AC 70/7460-1 and have red or white lenses when used.
PART 3 EXECUTION
3.1 HAZARDS TO AIRFIELD OPERATION
In addition to "DFARS 252.236-7005, Airfield Safety Precautions," the following paragraphs apply.
3.1.1 Work in Proximity to Runways and landing Strips:
Use of landing strips for purposes other than aircraft operation, is prohibited without permission of the TPOC, and the landing area is closed by order of the COR and marked as indicated herein.
Accomplish all construction work on the runways, taxiways, and parking aprons and in the end zones of the runways and 75 feet to each side of the runways and taxiways, the landing strip, 75 feet to each side thereof, and on the taxiways and parking aprons with extreme care regarding the operation of aircraft.
Cooperate closely, and coordinate with the Operations Officer and the COR. Park equipment in an area designated by the COR. Parking of equipment, vehicles, or any type of storage overnight or for any extended period of time in the proximity of the landing areas or taxiways is strictly prohibited. Leave no material in areas where extreme care is to be taken regarding the operation of aircraft.
During periods of active performance of work on the airfield by the Contractor, govern all operations of mobile equipment per the safety provisions.
3.1.2 Schedule of Work/Aircraft Operating Schedules:
Scheduled work shall conform to aircraft operating schedules. In the event of emergency, intense operational demands, adverse wind conditions, and other such unforeseen difficulties, the Contractor shall cease operations at the specified locations in the aircraft operational area for the safety of the Contractor and military personnel and Government property. Submit a schedule of the work to the COR for transmittal to the Operations Officer describing the work to be accomplished; the location of the work, noting distances from the ends of landing areas, taxiways, landing strips and buildings and other structures as necessary; and dates and hours during which the work is to be accomplished. Keep the approved schedule of work current, and notify the COR of any changes prior to beginning each day's work.
Prior to commencement of work, submit the following to the COR for transmittal to the Operations Officer:
· Existing Conditions Survey
· Construction Operations Plan
· Safety Plan
· Heavy Equipment and Vehicle List
Where flying is controlled, additional permission shall be obtained from the control tower operator to enter a landing area unless such area is marked as hazardous to aircraft.
3.1.3 Daytime Markings:
During daylight, mark stationary and mobile equipment with international orange and white checkered flags, mark the material, and work with yellow flags or yellow rotating flashing light.
Vehicles operating in the landing area must be identified by means of a flag on a staff attached to and flying above the vehicle. Flag size must be not less than (3) three feet square and consist of a checkered pattern of international orange and white squares not less than (1) one foot on each side. Flags varying in any dimension by not more than 10 percent of the specified dimensions are considered to comply with the stated requirements.
3.1.4 Nighttime Markings:
During nighttime, which begins (2) two hours before sundown and ends (2) two hours after sunrise, mark stationary and mobile equipment and material, and work with battery-operated, low-intensity, red flasher lights.
Where the Operations Officer, determines that the red flasher lights may confuse pilots approaching for landings, the Contracting Officer may direct that the red flasher lights be left off or that the color of the lights be changed.
Light construction and installation shall comply with FAA AC 70/7460-1.
Lights shall be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer.
No separate payments will be made for lighting and protection necessitated by the safety provisions.
3.1.5 Excavation:
Open only those trenches for which material is on hand and ready for placing therein. As soon as possible after the material has been placed and work approved, backfill and compact the trenches as specified.
Maintain landing areas at all times free from hazards, holes, material piles, or projecting shoulders that might damage tires or landing gear. Paved surfaces must be kept clean at all times and free from small stones or other objects which could cause damage to propellers, craft, and personnel.
3.1.6 Contractor Safety Precautions:
The Contractor is advised that aircraft operations will produce extremely high noise levels and will induce vibrations in pavements, structures, and equipment in the vicinity, and may result in high velocity flying debris in the area. The Contractor shall be responsible for providing all necessary protective eye and ear gear and other safety devices for his personnel, for insuring protection of his/her equipment, and for scheduling the work to eliminate hazards to his/her personnel and equipment and to prevent damage to work performed by him/her.
Boundary areas for hazardous work locations and restrictions are defined in FAA AC 150/5300-13.
Construction activity within the limits of the boundary areas without approval of the Contracting Officer is prohibited.
Provide a minimum of (2) two aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 30 meter 100 feet above ground level.
3.1.7 Foreign Object Damage (FOD):
Aircraft and aircraft engines are subject to FOD from debris and waste material lying on airfield pavements. Remove all such materials that may appear on operational aircraft pavements due to the Contractor’s operation. The Contractor shall also install a temporary barricade at the Contractor’s expense to control the spread of FOD potential debris into operational areas. Remove barricades when no longer required. Barricades shall be designed to withstand jet blast from taxing aircraft.
3.1.8 Radio Contact:
Provide necessary battery powered portable radios. During work within the airfield area, have an operator (who speaks fluent English) available for radio contact with the tower at all times. Radio frequency must be approved by the tower.
Radio may be checked out from the tower each workday for communication.
3.1.9. Equipment Operators:
All Equipment & vehicle operators must attend class and pass a written exam approved by NAS Corpus Christi for Runway Orientation Class for access (Flight Line Pass). Class schedule will be promulgated by the Contracting Officer’s Representative; length of class is approximately 2.0 hours.
-- End of Section --