BID_SKED_SPS_18_COL.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Expeditionary Logistics Support Service, SPS18 COLOMBIA
Solicitation number
N6883618Q0164
Issued by

View the file

Other files

File Type Posted
N6883618Q0164_U00001.pdf PDF
BID_SKED_SOL_AMEND_r1_15JUN18.xlsx XLSX spreadsheet
N6883618Q00164.pdf PDF
N6883618Q0164_SPS_18_COL_Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Sheet

SPS-18 COLOMBIA
BID SCHEDULE SUMMARY
GRAND TOTAL$0.00

&P

SPS-18

SPS-18 Colombia
25-Apr-18
COMMENTS
PERIOD OF PERFORMANCE: 04 AUG 18 - 18 OCT 18
DAYS OF SERVICE76
PERSONNEL
MAIN PERSONNEL52
Total52
ITEMDESCRIPTION OF SUPPLIES OR SERIVESQUANTITYUNITUNIT PRICEDAYSOM&N Total
US PERSONELDAY
16 PASSENGER 4X4 ARMORED SUV, W/DRIVER,FUEL, UNLIMITED MILEAGE2EA$0.0022$0.0024 HOURS/DAY 22 DAYS
26 PASSENGER 4X4 ARMORED SUV, W/DRIVER,FUEL, UNLIMITED MILEAGE7EA$0.001$0.0024 HOURS/DAY 1 DAYS
36 PASSENGER 4X4 ARMORED SUV, W/DRIVER,FUEL, UNLIMITED MILEAGE5EA$0.0045$0.0024 HOURS/DAY 45 DAYS
46 PASSENGER 4X4 ARMORED SUV, W/DRIVER,FUEL, UNLIMITED MILEAGE7EA$0.001$0.0024 HOURS/DAY 1 DAYS
56 PASSENGER 4X4 ARMORED SUV, W/DRIVER,FUEL, UNLIMITED MILEAGE3EA$0.001$0.0024 HOURS/DAY 1 DAY
63 PAX TRUCK, 1-3 TON FLATBED W/DRIVER,FUEL, UNLIMITED MILEAGE1EA$0.001$0.0012 HOURS/DAY 1 DAY
76 PASSENGER 4X4 ARMORED SUV, W/DRIVER,FUEL, UNLIMITED MILEAGE3EA$0.0020$0.0024 HOURS/DAY 20 DAYS
83 PAX TRUCK, 1-3 TON FLATBED W/DRIVER,FUEL, UNLIMITED MILEAGE1EA$0.001$0.0022 HOURS/DAY 1 DAY
96 PASSENGER 4X4 ARMORED SUV, W/DRIVER,FUEL, UNLIMITED MILEAGE3EA$0.0020$0.0024 HOURS/DAY 20 DAYS
103 PAX TRUCK, 1-3 TON FLATBED W/DRIVER,FUEL, UNLIMITED MILEAGE1EA$0.001$0.0024 HOURS/DAY 1 DAY
11SMARTPHONE AND SIMCARD WITH UNLIMITED MINUTES AND DATA5EA$0.0022$0.005 devices 22 days total
12AIR CARD WITH UNLIMITED DATA3EA$0.0022$0.003 devices 22 days total
13SMARTPHONE AND SIMCARD WITH UNLIMITED MINUTES AND DATA2EA$0.0074$0.002 devices 74 days total
14AIR CARD WITH UNLIMITED DATA3EA$0.0074$0.003 devices 74 days total
15SMARTPHONE AND SIMCARD WITH UNLIMITED MINUTES AND DATA6EA$0.0048$0.006 devices 48 days total
16AIR CARD WITH UNLIMITED DATA3EA$0.0048$0.003 devices 48 days total
17SMARTPHONE AND SIMCARD WITH UNLIMITED MINUTES AND DATA11EA$0.0020$0.0011 devices 20 days total
18AIR CARD WITH UNLIMITED DATA5EA$0.0020$0.005 devices 20 days total
19LINE HAUL EQUIPMENT FROM PORT SITE TO MISSION SITE1EA$0.002$0.0060' flatbed truck to move 2 ISU containers (8 ft L X 9 ft W X 8 ft, approx. 5,000 lbs each), EOD equipment and gear. operator, fuel, unlimited mileage to load and offload.
20FORKLIFT FOR ONLOADING AT PORT SITE1EA$0.001$0.0010K all-terrain Forklift with fork extension
21FORKLIFT FOR OFFLOADING AT MISSION SITE1EA$0.001$0.0010K all-terrain Forklift with fork extension
22LINE HAUL EQUIPMENT FROM PORT SITE TO MISSION SITE5EA$0.003$0.005 x 60' flatbed truck to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), drilling material and additional equipment. operator, fuel, unlimited mileage to load and offload.
23LINE HAUL EQUIPMENT FROM PORT SITE TO MISSION SITE5EA$0.003$0.0015 Ton 4X4 or 6X6 off road capable truck tractor w/ semitrailer lowbed 55 Ton W vehicle ramps and associated straps/load securing gear.
24FORKLIFT FOR ONLOADING AT PORT SITE2EA$0.002$0.0010K all-terrain Forklift with fork extension
25FORKLIFT FOR OFFLOADING AT MISSION SITE2EA$0.002$0.0010K all-terrain Forklift with fork extension
26LINE HAUL EQUIPMENT FROM MISSION SITE TO STORAGE SITE1EA$0.001$0.0060' flatbed truck to move 2 ISU containers (8 ft L X 9 ft W X 8 ft, approx. 5,000 lbs each), EOD equipment and gear. operator, fuel, unlimited mileage to load and offload.
27FORKLIFT FOR ONLOAD AT MISSION SITE1EA$0.001$0.0010K all-terrain Forklift with fork extension
28FORKLIFT FOR OFFLOAD AT STORAGE SITE1EA$0.001$0.0010K all-terrain Forklift with fork extension
29LINE HAUL EQUIPMENT FROM PORT SITE TO MISSION SITE1EA$0.001$0.0060' flatbed truck to move 2 ISU containers (8 ft L X 9 ft W X 8 ft, approx. 5,000 lbs each), EOD equipment and gear. operator, fuel, unlimited mileage to load and offload.
30FORKLIFT FOR ONLOADING AT PORT SITE1EA$0.001$0.0010K all-terrain Forklift with fork extension
31FORKLIFT FOR OFFLOADING AT MISSION SITE1EA$0.001$0.0010K all-terrain Forklift with fork extension
32LINE HAUL EQUIPMENT FROM MISSION SITE TO PORT SITE1EA$0.001$0.0060' flatbed truck to move 2 ISU containers (8 ft L X 9 ft W X 8 ft, approx. 5,000 lbs each), MDSU equipment and gear. operator, fuel, unlimited mileage to load and offload.
33LINE HAUL EQUIPMENT FROM STORAGE SITE TO PORT SITE1EA$0.001$0.0060' flatbed truck to move 2 ISU containers (8 ft L X 9 ft W X 8 ft, approx. 5,000 lbs each), EOD equipment and gear. operator, fuel, unlimited mileage to load and offload.
34FORKLIFT FOR ONLOADING AT MISSION SITE1EA$0.001$0.0010K all-terrain Forklift with fork extension
35FORKLIFT FOR OFFLOADING AT STORAGE SITE1EA$0.001$0.0010K all-terrain Forklift with fork extension
36FORKLIFT FOR ONLOADING AT PORT SITE1EA$0.001$0.0010K all-terrain Forklift with fork extension
37LINE HAUL EQUIPMENT FROM MISSION SITE TO STORAGE SITE5EA$0.003$0.005 x 60' flatbed truck to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), drilling material and additional equipment. operator, fuel, unlimited mileage to load and offload.
38LINE HAUL EQUIPMENT FROM MISSION SITE TO STORAGE SITE5EA$0.003$0.0015 Ton 4X4 or 6X6 off road capable truck tractor w/ semitrailer lowbed 55 Ton W vehicle ramps and associated straps/load securing gear.
39FORKLIFT FOR ONLOADING AT MISSION SITE2EA$0.002$0.0010K all-terrain Forklift with fork extension
40FORKLIFT FOR OFFLOADING AT STORAGE SITE2EA$0.002$0.0010K all-terrain Forklift with fork extension
41LINE HAUL EQUIPMENT FROM STORAGE SITE TO PORT SITE5EA$0.001$0.005 x 60' flatbed truck to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), drilling material and additional equipment. operator, fuel, unlimited mileage to load and offload.
42LINE HAUL EQUIPMENT FROM STORAGE SITE TO PORT SITE5EA$0.001$0.0015 Ton 4X4 or 6X6 off road capable truck tractor w/ semitrailer lowbed 55 Ton W vehicle ramps and associated straps/load securing gear.
43FORKLIFT FOR ONLOADING AT STORAGE SITE2EA$0.001$0.0010K all-terrain Forklift with fork extension
44FORKLIFT FOR OFFLOADING AT PORT SITE2EA$0.001$0.0010K all-terrain Forklift with fork extension
45CASES OF WATER (us)43CS$0.002$0.0085 cases total24 Bottles/case (16oz Bottles) Rough +15%
46CASES OF WATER (us)109CS$0.007$0.00765 cases total 24 Bottles/case (16oz Bottles) Rough +15%
47CASES OF WATER (us)33CS$0.003$0.00100 cases total 24 Bottles/case (16oz Bottles) Rough +15%
48CASES OF WATER (us)7CS$0.0020$0.00140 cases total 24 Bottles/case (16oz Bottles) Rough +15%
49ICE (units in quantity are kg)50KG$0.0045$0.00cubed ice for human consumption from a certifiable potable water source. Delivery of 10kg twice daily
50DINNER25EA$0.0047$0.0025 meals a day / 47 days
51BREAKFAST25EA$0.0047$0.0025 meals a day / 47 days
52DINNER11EA$0.0019$0.0011 meals a day / 19 days
53BREAKFAST11EA$0.0019$0.0011 meals a day / 19 days
54LAUNDRY SERVICE710 LB EACH$0.006$0.0042 m10 lb eachls a day / 6 days
55BARBER ( 1 per visit; 3 visits)1LO$0.003$0.001 BARBER TO PREFORM SERVICE 3 TIMES
56LAUNDRY SERVICE2610 LB EACH$0.0014$0.00364 m10 lb eachls a day / 14 days
57BARBER (1 per visit; 6 visits)1LO$0.006$0.001 BARBER TO PREFORM SERVICE 6 TIMES
58LAUNDRY SERVICE1110 LB EACH$0.006$0.0066 m10 lb eachls a day / days
59LAUNDRY SERVICE1010 LB EACH$0.006$0.0060 m10 lb eachls a day / days
60BARBER (1 per visit; 2 visits1LO$0.002$0.001 BARBER TO PREFORM SERVICE 2 TIMES
61DUMPSTER1EA$0.0047$0.00DUMPED 2 TIMES A WEEK 47 DAYS TOTAL
62HYDROLIC POWER UNIT1EA$0.0020$0.001 Unit (see PWS for specs) 20 days
63GRASS CUTTING1EA$0.001$0.001 meals a day / days
64VECTOR CONTROL (spraying)1EA$0.004$0.004 meals a day / days
65POTTIBLE WATER240000GL$0.000$0.00240000 total required. See PWS for delivery schedule
66DIESEL (GAL)350GL$0.0045$0.0015750 mglls a day / days
67MOGAS (GAL)100GL$0.0045$0.004500 mglls a day / days
68MOGAS (GAL)50GL$0.0045$0.002250 mglls a day / days
69MOGAS (GAL)55GL$0.001$0.0055 mglls a day / days
70DIESEL (GAL)55GL$0.001$0.0055 mglls a day / days
71HYDRAULIC FLUID55GL$0.001$0.0055 mglls a day / days
72USED HAZARDOUS MATERIAL REMOVAL110GL$0.007$0.00770 mglls a day / days
73LUMBER 2"x8"x16'40EA$0.000$0.0040 meals a day / days
74PLYWOOD 3/4"x4'x8'20SH$0.000$0.0020 mshls a day / days
752" PHILLIPS HEAD DECK SCREW4BX$0.000$0.004 mbxls a day / days
763" PHILLIPS HEAD DECK SCREW4BX$0.000$0.004 mbxls a day / days
77SNOW FENCE 5ft x 1500ft15RO$0.000$0.001500ft TOTAL, 100ft PER ROLL
78SAND600BG$0.000$0.0030,000lb TOTAL, 50lb PER BAG
79GRAVEL 3/4 MINUS (CLEAN)834BG$0.000$0.0050,000lb TOTAL 60lb PER BAG
80CHAIN LINK FENCE (10ft X10ft)1EA$0.000$0.00SEE ENCLOSURE
81PLASTIC WATER TANK1EA$0.000$0.005000GL capacity
82HOTEL LODGING12EA$0.0047$0.00DOUBLE ROOM
83HOTEL LODGING3EA$0.0047$0.00SINGLE ROOM
84HOTEL LODGING5EA$0.0019$0.00DOUBLE ROOM
85HOTEL LODGING2EA$0.0019$0.00SINGLE ROOM
86CARTAGENA STORAGE1EA$0.00$0.00STORAGE SITE 100ft x 100ft total 54 days
*87EMERGENT LINE ITEM FOR ALL MISSION SITE1EA$0.00$0.001 meals a day / days
SITE TOTAL$0.00

* This IS NOT an automatic expenditure amount. Total price of materials shall not exceed $5,000.00 and any items or services shall be prior approved by the COR via the KO. ESC shall not procure miscellaneous materials without prior approval by the COR, including but not limited to; hardware, metal piping, and lumber. ESC shall provide detailed estimates / receipts for all authorized procurements to the KO and COR, and in writing prior to procurement. All fabricated material remains property of the U.S. Government.