PAR_RFI_Questions_and_Answers.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Request For Information for AN/FPN-63(V) Precision Approach Radar (PAR) Replacement and Instrument Landing System (ILS) Replacement
Solicitation number
N68335-14-RFI-0160
Issued by

About this file

PAR RFI QUESTIONS AND ANSWERS

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

The following Questions were received in reference to Solicitation N68335-14-RFI-0160:
Q 1.The formula for Achieved Availability appears to be missing. Please provide it ?
Q 2.The RFI states, "FAULT ISOLATION: The PAR and ILS built-in-test shall be capable of isolatingdetected faults to 1 L"
Is this a complete statement? What is "1 L"?
Q 3.The RFI states, " PRIMARY COMMERCIAL ELECTRICAL POWER; 120/208 VAC, 60 Hz, 4 wire, three phase, 12.8 KVA"
Is 12.8 KVA the maximum power available to operate the system? In other words, the system should be able to function on a 12.8 KVA or less?

The following answers to the above questions are provided below:

A 1.PAR AND ILS ACHIEVED AVAILABILITY (Aa)
Achieved availability is measured by the following equation:
MTBM (MEAN TIME BETWEEN MAINTENANCE)
MTBM (MEAN TIME BETWEEN MAINTENANCE) + MMT (MEAN MAINTENANCE TIME)
A 2.FAULT ISOLATION:The PAR and ILS built-in-test shall be capable of isolating detected faults to 1 LRU > 95% of the time.
A 3.PRIMARY COMMERCIAL POWER IS AVAILABLE