STATEMENT_OF_WORK.DOC
DOC document 31 KB Posted
- Attached to
- MRI ROOM DOOR REPLACEMENT
- Solicitation number
- N6809419R6002
About this file
SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MRI_DOOR_PICTURE.pdf | ||
| STATEMENT_OF_WORK.DOC | DOC document | |
| AMENDED_N6809419R6002.pdf | ||
| N6809419R6002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
GENERAL REQUIREMENTS:
The effort required hereunder shall be performed in accordance with this Statement of Work and in accordance with all other terms and conditions set forth herein.
The contractor shall provide all services, materials and equipment necessary for the replacement of the MRI DOOR Services located in Naval Hospital Camp Pendleton: RADIOLOGY DEPARTMENT to ensure dependable and reliable operation. The scope of work performed under these specifications includes the furnishing of all labor, and parts to perform the replacement, to assure continued operation at designed efficiency and capacity.
SCOPE OF WORK REQUIRED:
· Baseline RFI Testing of existing RF shield integrity.
· Removal of existing Nelco RFI door and hinges from the jamb Assembly.
· Removal of existing Nelco door controls and actuators.
· Fabricate a new DMCA pneumatic door assembly and install within the existing Nelco door jamb.
· Prep door jamb as required to accept new DMCA door assembly.
· Installation of new DMCA door assembly into existing Nelco jamb.
· Provide and install DMCA door controls.
· Final RFI Testing shield integrity at new door installation.
The contractor shall not assume possession or control of any part of the door. The Government retains ownership to title thereof.
LIABILITY: The contractor shall not be liable for any loss, damage, or delay due to any cause beyond his reasonable control including but not limited to, acts of government, strikes, lockouts, fire, explosion, theft, floods, riot, civil commotion, war, malicious mischief or acts of God.
UTILITIES: The contractor may use Government utilities, (e.g., electrical power, compressed air, and water) that are available and required for any service performed under this contract. The building engineer, to ensure compatibility with the Naval Hospital Camp Pendleton electrical wiring and equipment, must approve contractor electrical equipment.
ACCESS TO LOCATION: The contractor shall be provided reasonable access to the location where door replacement is needed.
CONTRACTOR CHECK-IN/CHECK-OUT: CONTRACTOR CHECK-IN/CHECK-OUT: The Contractor, or his representative, is required to check-in and out at the Naval Hospital Camp Pendleton Quarterdeck VIA Biomedical Engineering Division BLDG H200 during the hours of 0730 - 1600 hours, Monday through Friday, prior to and upon completion of the repair performed.
FIELD SERVICE REPORTS: The contractor, or his representative shall furnish to;
Biomedical Engineering Division
Naval Hospital Camp Pendleton
Building H-200
Phone: (760) 719-3726
E-mail: NHCPEN-BIOMEDTechs@med.navy.mil.
A legible copy of the Field Service Report upon completion of work performed. The contractor, or his representative, shall complete the Government copy of this Field Service Report to include the following:
Date and Time Notified
· Date and Time Arrival
ECN (Equipment Control Number), Type, serial # and model #
Time expended repairing/servicing
Description of malfunction
General Description of replaced parts and service performed
· Comments as to cause of malfunction
FIELD SERVICE REPORTS ARE REQUIRED PRIOR TO APPROVAL OF ALL INVOICES
-End of Statement of Work-