PWS.docx
DOCX document 16 KB Posted
- Attached to
- STORAGE CONTAINER
- Solicitation number
- N68094-13-T-0057
About this file
PERFORMANCE WORK STATEMENT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO_POSTING.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Naval Hospital Camp Pendleton Storage Container w/Climate Control
1. SCOPE: The Contractor shall furnish all labor, tools, supervision, material, parts, equipment, and transportation necessary to deliver and install a 18x20 Metal Storage Container w/Climate Control (AC).
2. OBJECTIVES: Procure Storage Container W/Climate Control (AC) for storage of Chemical, Biological, Radiological, Nuclear and high-yield Explosives (CBRNE).
3. Tasks/Requirements:
· Provide and install one (1) 8x20 metal container to electrical source
· Provide/extend electrical source/connect to existing panel
· Spray Foam Insulation (Not of Doors)
· Spray Foam under the Container
· Door will be insulated in the inside and cover with Sheet Metal
· Wood Siding (Not on Door)
· Pitched Rood and Seal Joints
· Window Unit (Heating and Cooling)
· Provide One (1) Light and Switch
4. GOVERNEMNT FURNISHED PROPERTY/TASKS: None.
5. PLACE OF PERFORMANCE:
Marine Corps Air Station Branch Health Clinic P.O. Box 99116/Bldg #1175 Yuma, AZ 85369
6. DELIVERY/INSTALLATION COMPLETION DATE: Delivery & Installation dates and duration of installation will be co-ordinated/negotiated with the awarded contractor but shall fall within the period of September 30, 2013 through October 18, 2013.
(End of Performance Work Statement)
File details come from the government source that posted it. Updated .