1300780178
Project Title: Replace existing HVAC units in building 1259 rooms 102 and 103.
Project Description: The Contractor shall provide all materials equipment, labor, and supervision to replace existing HVAC units in building 1259 rooms 102 and 103 serving as a lab space at the Naval Undersea Warfare Center Division New port (NUWCDIVNPT).
The magnitude of the requirement per FAR 36.204, is betw een $25,000 and $100,000.
The proposal is due by 12 August 2019, 2:00 PM Local Time. This project is a total small business set aside. NAICS Code 236220 w ith a corresponding size standard of $36.5 M and FSC of Z2AZ.
Site visit is schedule for Tuesday 30 July 2019 @ 10:00, local time. See base requirements located in the supplemental instructions of this solicitation.
IT IS IMPERATIVE THAT YOU ALLOW SUFFICIENT TIME FOR VISIT REQUEST PROCESSING AND RECOMMEND THAT YOU BEGIN THE
PROCESS AS SOON AS PRACTICABLE UPON RECEIPT OF THIS SOLICITATION.
ALEXANDER R OLARTE 401-832-2648
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
12-Jul-2019
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________60 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVAL UNDERSEA WARFARE CENTER
ALEXANDER OLARTE, CODE 0224,
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
N66604
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 401-832-2648 TEL: FAX:
N6660419Q2012 60
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N6660419Q2012
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
B1259 AC REPLACEMENT
FFP
The Contractor shall provide all materials equipment, labor, and supervision to replace existing HVAC units in building 1259 rooms 102 and 103 serving as a lab space at the Naval Undersea Warfare Center Division New port (NUWCDIVNPT).
FOB: Destination
PURCHASE REQUEST NUMBER: 1300780178
PSC CD: K055
NET AMT
Section C - Descriptions and Specifications
SOW
STATEMENT OF WORK
PR#13007780178
1. BACKGROUND
The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) is a Naval research activity operating under the direction of the Commander, Naval Sea Systems Command (NAVSEA). We provide research, development, test and evaluation, engineering, analysis and assessment, as well as Fleet support capabilities for submarines, autonomous underwater systems, and offensive and defensive undersea weapon systems, and stewards existing and emerging technologies in support of undersea warfare.
2. SCOPE
The Contractor shall provide all materials, equipment, labor, and supervision to replace existing HVAC units in building 1259 rooms 102 and 103 serving as a lab space.
• All work to be performed at Building 1259 Room 102 and 103.
• Work to be performed in accordance with Scope of Work.
• Customer to provide area for equipment and material storage.
• Customer to provide access to area for workers and equipment.
• All Work to be in accordance with OSHA and Army Corp of Engineers Safety Manual, EM-385-1-1 Current Edition Safety requirements.
• Safety and Health Standards for Construction Industry (29 CFR PART 1929 2007).
• NUWCDIVNPT Drawings 19-003A (7 sheets) and this Statement of Work, depict the work required on this particular project.
• Contractor shall inspect all work in accordance with FAR 52.246-12 "Inspection of Construction."
• Contractor shall coordinate with the POC prior to commencement of work to ensure all scheduling and access issues have been worked out properly. Any questions will be directed to the POC and not through the customer.
.1. Submittals: The Contractor shall submit the following within 7 days after award:
The contractor shall provide 2 copies of submittals for approval purposes for all materials to be used on the project.
Submittals shall be complete with manufactures name, catalog number, specifications, and any other information necessary to approve the materials. MSDS sheets shall be submitted along with the product data for any potentially hazardous materials such as adhesives and flux materials. Use low VOC materials wherever possible. In addition, a Work Schedule and an Accident Protection Plan (APP) shall be submitted.
Submittals shall be approved by the Government Representative prior to the start of work.
2.2. Time of Completion: Work shall be prosecuted diligently and shall be completed for use within the time indicated in the award document (60 calendar days from the date to receive notice to proceed.) Contractor is required to furnish proof of any cause for delay and must request an extension of the completion date in writing through the Contracting Officer.
2.3. Clean-Up of Site. Shall be performed on a daily basis. Contractors are not permitted to use Government dumpsters or other Contractor dumpsters for disposal of debris.
2.4. Hot Work. A hot work permit is required as needed. A permit may be obtained through the Government inspector with 48 hours’ prior notice. Hot work in electrical or mechanical room space will require a gas-free test prior to the Government fire inspector granting approval. In accordance with the Government fire inspector's requirements, the Contractor must perform this test daily. The Government fire inspector shall approve the instrument used.
2.5. Dust Control. The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of th1e construction site and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.
2.6. Warranties. The contractor shall provide warranty services for all new items installed for one (1) year following acceptance by the Government. Warranty period begins at final system acceptance. If there is a failure of the system, the contractor shall respond within 48 hours of notification.
2.7. Radio Transmitter Restrictions. The contractor shall conform to the restrictions and procedures for the use of radio transmitting equipment as directed. The contractor shall not use transmitters without prior approval from the Explosive Safety Officer.
2.8 Pre Construction Conference. The contractor shall attend a pre-construction conference at the Naval Undersea Warfare Center to discuss all aspects of the project, including phasing, scheduling, safety concerns, fire department concerns, submission of submittals and the approval process, security concerns, environmental issues, customer concerns, and any concerns that the contractor may have.
2.9 Safety. The contractor is responsible for the safety of his personnel and the safety of NUWC personnel during the course of this project. The contractor shall comply with the most recent Army Corps of Engineers COE-EM- 385-1-1 Safety and Health Requirements Manual for all aspects of this project. The contractor will be responsible for any exterior work or to any work which involves the closing of a building’s entrance, the contractor shall be responsible for the provision of temporary chain link construction fencing set into moveable concrete blocks, meeting the requirements of COE-EM-385-1-1, around the complete work area to prevent NUWC personnel from entering the work zone and/or any unsafe areas. The fence shall be equipped with signage as required by COE-EM- 385-1-1. Provide gates where necessary for access by emergency personnel or to allow personnel to escape during an emergency. Sawhorses and/or construction tape is not sufficient for exterior closings or barriers.
2.10. Weather Protection. The contractor shall take necessary precautions to ensure any critical openings are monitored carefully. Take immediate actions required to seal off such openings when rain or other detrimental weather is imminent, and at the end of each workday. Ensure that the openings are completely sealed off to protect materials and equipment in the building from damage. When a warning of gale force winds is issued, take precautions to minimize danger to persons, and protect the work and nearby Government property. Precautions shall include, but are not limited to, closing openings; removing loose materials, tools and equipment from exposed locations; and removing or securing scaffolding and other temporary work. Close openings in the work when storms of lesser intensity pose a threat to the work or any nearby “Government property.
2.11. Closeout Procedures. Prior to receiving final payment, the contractor shall be responsible for the following at the completion of the project:
The provision of one full size set of marked up drawings to be used as “As Built” construction conditions.
The provision of an “As Built” Record of Materials, which will include a list of items, along with the Manufacturer’s name, Manufacturer’s model numbers, …etc.
The provision of Warranty Information including the warranty duration, the actual date of warranty expiration, warranty contact information, and any items that have an extended warranty beyond the standard one year.
2.12. Existing Work. Contractor shall be responsible for the protection of all existing structures, equipment, finishes, etc. not to be removed as part of this project from damage during construction. Any items not included in the Scope of Work that are damaged or altered during construction shall be restored to their pre-construction condition at the contractor’s expense and verified as such by the Government.
2.13. Contractor Access and Use of Premises. Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
2.14. Subcontractors and Personnel Contacts. Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
2.15. Identification Badges and Installation Access.
Naval Station requires one of the following in order to enter the base, along with your NUWC visitor badge:
(a) CAC card
(b) DBIDS card
(c) Retired Military ID
A Visit Request is mandatory for all visitors to NUWCDIVNPT, government and civilian, regardless of the duration or classification of the visit. Access to NUWCDIVNPT will not be granted under any circumstances without a valid visit authorization request on file. Due to the number of visit requests received, along with current vetting requirements, FIFTEEN (15) WORKING DAYS PROCESSING TIME is required for all visit requests whether received through the Joint Personnel Adjudication System (JPAS), or by email. All incomplete visit requests will be denied. Resubmissions will also require fifteen workings for processing. Visitors who arrive prior to the fifteen-day processing window will not be guaranteed access. For questions regarding visit requests, contact NUWCDIVNPT Visitor Control at (401) 832-2152.
To submit a visit request, either:
a. Submit through JPAS. Use SMO code 666045
b. Send an encrypted email file through the Secure Access File Exchange (SAFE) located at https://safe.amrdec.army.mil/SAFE
Send email to: nuwc_npt_access_control@navy.mil Regardless of how the request is submitted, the request MUST BE ON COMPANY LETTERHEAD. If your company does not have company letterhead, either stamp the paper with a company address stamp or attach a business card; something to demonstrate that you are a legitimate business. TYPE the Visitor Request so the information can be legible.
Include ALL of the following information on your visit request:
Company or Organization Name, Complete Address, Telephone Number, and Fax Number
Facility to be visited (Naval Undersea Warfare Center Division, Newport, RI)
Facility Sponsor (NUWC Government Employee)
Visitor(s) Full Name(s) (As it appears on government issued ID -i.e. Driver's License)
Visitor(s) Full Social Security Number Visitor(s) Date of Birth
Visitor(s) Place of Birth (City & State) If born outside the U.S., you MUST provide a Naturalization Number or Passport Number
Visitor(s) Citizenship
Level of Clearance Required (UNCLASSIFIED) Visitor(s) in possession of a CAC card Visitor(s) in possession of a Military ID Visitor(s) in possession of a DBIDS card Visitor(s) Email Address Specific Date(s) of Visit, Including Year Purpose of Visit Contract / Purchase Order Number (N/A or as appropriate) - if there is no contract number, visits will be limited to a maximum of 30 days.
Authorized Signature: Name, Title, and Signature of Requesting Company Authorizing Official (MUST be a US Citizen). Individuals MUST NOT sign their own request.
Additional Identification
In addition to a visit request, individuals not in possession of a Common Access Card or Military ID will be required to obtain a Defense Biometric Identification Data System (DBIDS) card for positive identification.
Access will NOT be granted without a valid CAC, Military ID, or DBIDS card.
Defense Biometrics Identification System (DBIDS) Application
Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html.
No fees are associated with obtaining a DBIDS credential.
Registration for DBIDS
DBIDS registration is processed at the Naval Station Newport (NAVSTA) Pass and ID Office. Procedure includes:
a. Provide completed SECNAV FORM 5512/1 to your Government Sponsor or NUWCDIVNPT Security along with your NUWC Visit Request (if visiting NUWC). This form is available for download at https://www.cnic.navy.mil/om/dbids.html and must be submitted using the Secure Access File Exchange (SAFE) located at https://safe.amrdec.army.mil/SAFE.
b. Present valid identification, such as a passport or Real ID Act- compliant state driver's license.
c. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments. Processing time is FIFTEEN (15) WORKING DAYS and is concurrent with the NUWCDIVNPT Visit Request Process.
d. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite. DBIDS credential may be obtained from the NAVSTA Pass and ID Office located in Building 1377, Cloyne Ct, Newport, RI 02840.
For more information or to check on the status of your DBIDS application contact NAVSTA Pass & ID Office at (401) 841-3126.
Notes:
(1) Each individual must be on their own SECNAV 5512/1 form.
(2) DBIDS vetting is valid up to 179 days after which a new request must be submitted.
(3) SECNAV 5512/1 must be filled out using Adobe Acrobat. Versions that have been altered (for example, converted to word and then filled out) will not be accepted.
(4) SECNAV 5512/1 must be dated and signed within 7 calendar days of submission.
DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.
DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
Contractor & Delivery Vehicle Access
Vehicles in need of access to NUWCDIVNPT are required to obtain a vehicle pass. Passenger vehicles and vehicles up to and including box trucks shall obtain their vehicle pass at the NAVSTA Pass & ID Office. Delivery vehicles and other vehicles larger than a box truck shall obtain their vehicle pass and DBIDS credentials at the Commercial Vehicle Inspection Station (CVIS) located at NAVSTA Gate 17.
Upon arrival at CVIS, the driver must physically present a work/purchase order or contract to verify the legitimacy of the visit. They must be in a commercial vehicle and will need to go through the commercial vehicle lane.
Arrival Instructions
Confirm the acceptance of a valid NUWCDIVNPT Visit Request with the NUWCDIVNPT Project Manager prior to attempting access to NUWCDIVNPT. Additionally, if DBIDS card(s) are required, confirm the status with the NAVSTA Pass & ID prior to attempting to access NUWCDIVNPT.
Upon arrival, proceed directly to NUWCDIVNPT Visitor Control located in NUWCDIVNPT Building 80 to obtain your NUWCDIVNPT Visitor Badge. If a DBIDS card is required, proceed to NAVSTA Pass & ID or CVIS as stated above. Once all badging is complete, contact the NUWCDIVNPT Project Manager to coordinate your arrival.
Facility Access Determinations (FAD): The program above allows contractors to work on the NUWC grounds outside of buildings. In order to perform work within existing buildings, a FAD must be submitted. The FAD is a process whereby commanding officers, in their responsibilities under the Internal Security Act of 1950 to protect persons and property under their command against the actions of untrustworthy persons, may request personnel scrutiny investigations and review the results to determine whether to allow the identified person(s) access to facilities under their control. The FAD program also complies with the requirements of Homeland Security Presidential Directive 12 (HSPD-12) to have a background investigation on all individuals who access federal facilities. FADs are required when: Unescorted access to the installation is required for a non-classified contract. A request for a photo ID is submitted. Photo ID’s are only given when the contractor will be on site for a minimum of 3 days per week for a period not less than 90 days. When there is no other background investigation that meets the requirement of HSPD-12 such as a prior NAC, NACI, or TWIC.
The FAD Process consists of the following:
Company submits a complete visit request for the individual. Visit request forms are available from the Security Department or NUWC Website.
The NUWC POC submits a badge card for the individual after verifying that the individual needs access for a minimum of three days per week for a period of at least 90 days.
During the badge card review process, the individual does not have a background investigation that meets the requirements of HSPD-12.
The individual, and the individual’s company, are provided the SF-85 form through the electronic Questionnaire for Investigation Processing (eQip) The eQip is reviewed and the individual is fingerprinted to verify citizenship through a valid birth certificate or US Passport.
OPM conducts the NAC or NACI. Only a determination of Favorable will result in the individual’s unescorted access to NUWCDIVNPT.
If derogatory information occurs after the badge is issued, the contractor will be advised that the issuance of a NUWC badge is the sole prerogative of the commanding officer. If the commanding officer determines, upon review of the facts, that allowing a person to perform certain duties or to access certain areas, would pose an unacceptable risk, that decision is final. No due process procedures are required.
2.16. No Smoking Policy. Smoking is prohibited within and immediately outside of all buildings on installations under the cognizance of NAVFAC, except in designated exterior smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines.
2.17. Working Hours. Regular working hours must consist of an 8 1/2-hour period between 7:00 a.m. and 4:30 p.m., Monday through Friday, excluding Government holidays.
2.18. Work Outside Regular Hours. If required, work outside regular working hours requires government approval. Make application 15 calendar days prior to such work, giving the specific dates, hours, location, type of work to be performed, contract number and project title, to allow arrangements to be made by the Government.
Based on the justification provided, the Government may approve work outside regular hours. During periods of darkness, the work must be lighted in a manner approved by the Government.
2.19. Occupied Existing Building. The Contractor will be working at an existing building and will require a government provided escort during construction. Inside the building the Contractor shall remain with the assigned escort at all times. Make accommodations to limit the disturbance to the building occupants.
3. PRODUCT AND MATERIAL SPECIFICATIONS FOR PLUMBING AND SPECIALTIES
3.1 Pipe and specialties.
Standard Products
Provide materials and equipment which are the standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Equipment shall be supported by a service organization that is, in the opinion of the Contracting Officer, reasonably convenient to the site.
Nameplates
Place a plate on each major item of equipment having the manufacturer's name, address, type or style, model or serial number, and catalog number secured to the item of equipment.
General
Piping, tubing, and fittings shall be as follows:
ASTM A53/A53M electric resistance welded or seamless Schedule 40 steel pipe or ASTM B88M ASTM B88 Type L hard drawn Copper tubing.
Steel Pipe
ASTM A106/A106M, Grade A or B, black steel, Schedule 40, unless otherwise specified. Steel pipe to be bent shall be ASTM A53/A53M, Grade A, standard, or Grade B, extra strong weight.
Malleable Iron Pipe Fittings
ASME B16.3, type required to match adjacent piping.
Steel Pipe Fittings
Fittings shall have the manufacturer's trademark affixed in accordance with MSS SP-25 so as to permanently identify the manufacturer.
Welded Fittings
ASTM A234/A234M with WPA marking. Butt welded fittings shall conform to ASME B16.9, and socket welded fittings shall conform to ASME B16.11.
Steel Flanges
Flanged fittings including flanges, bolts, nuts, bolt patterns., etc. shall be in accordance with ASME B16.5 class 150 and shall have the manufacturers trademark affixed in accordance with MSS SP-25. Flange material shall conform to ASTM A105/A105M. Flanges for high temperature water systems shall be serrated or raised-face type. Blind flange material shall conform to ASTM A516/A516M cold service and ASTM A515/A515M for hot service. Bolts shall be high strength or intermediate strength with material conforming to ASTM A193/A193M.
Pipe threads
ASME B1.20.2M ASME B1.20.1.
Nipples
ASTM A733 or ASTM B687, standard weight.
Fittings for Copper Tubing
ASME B16.18 cast bronze solder joint type or ASME B16.22 wrought copper solder joint type.
Unions
ASME B16.39, type to match adjacent piping for steel and provide CID A-A-59617, bronze unions, solder joint end for copper.
Adapters
Adapters for copper tubing shall be brass or bronze for soldered fittings
Dielectric waterways
Dielectric waterways shall conform to the tensile strength and dimensional requirements specified in ASME B16.39.
Waterways shall have metal connections on both ends to match adjacent piping. Metal parts of dielectric waterways shall be separated so that the electrical current is below 1 percent of the galvanic current which would exist upon metal-to-metal contact. shall have temperature and pressure rating equal to or greater than that specified for the connecting piping. Dielectric waterways shall be internally lined with an insulator specifically designed to prevent current flow between dissimilar metals. Dielectric flanges shall meet the performance requirements described herein for dielectric waterways.
3.2. Miscellaneous Materials. Miscellaneous materials shall conform to the following:
Gaskets for Flanges
Composition gaskets shall conform to ASME B16.21. Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21, 1/16-inch thickness, full face or self-centering flat ring type. Gaskets shall contain aramid fibers bonded with styrene butadiene rubber (SBR) or nitrile butadiene rubber (NBR). NBR binder shall be used for hydrocarbon service. Gaskets shall be suitable for pressure and temperatures of piping system.
Pipe hangers
Pipe hangers, inserts, and supports shall conform to MSS SP-58.
Air Vents
Air vents shall be provided at all piping high points in water systems, with block valve in inlet and internal check valve to allow air vent to be isolated for cleaning and inspection. Outlet connection shall be piped to nearest open site or suitable drain, or terminated 12 inches above finished grade. Pressure rating of air vent shall match pressure rating of piping system. Body and cover shall be cast iron or semi-steel with stainless steel or copper float and stainless steel or bronze internal parts. Air vents installed in piping in chase walls or other inaccessible places shall be provided with an access panel.
Drains
Install threaded drain connections with threaded cap or plug wherever required for thorough draining of the low temperature water system.
Strainers
Basket or Y-type strainer-body connections shall be the same size as the pipe lines in which the connections are installed. The bodies shall have arrows clearly cast on the sides to indicate the direction of flow. Each strainer shall be equipped with an easily removable cover and sediment basket. The body or bottom opening shall be equipped with nipple and gate valve for blowdown. The basket for steam systems shall be of not less than 0.025-inch-thick stainless steel, or Monel with small perforations of sufficient number to provide a net free area through the basket of at least 2.5 times that of the entering pipe. The flow shall be into the basket and out through the perforations. The strainer bodies for steam systems shall be of cast steel or gray cast iron with bottoms drilled and plugged.
3.3. Valves for Low Temperature Water Systems.
Ball Valves
Flanged or butt-welding ends ball valve shall conform to MSS SP-72, bronze. Threaded, socket-welding, solder joint, grooved and flared ends shall conform to MSS SP-110.d.
Check Valves
Bronze Check Valves: MSS SP-80, 2 inches and smaller, regrinding swing check type, Class 200. Steel Swing Check Valves: ASME B16.34, regrinding swing check type, Class 200.
(1) Swing check valves shall have bolted caps.
(2) Steel Lift check valves 2 inches and smaller shall have bolted caps.
Globe Valves
Bronze Globe and Angle Valves: MSS SP-80, 2 inches and smaller, Class 200, except use Class 150 with solder ends for copper tubing. Valves shall have renewable seat and discs except solder end valves which shall have integral seats.
Steel Globe and Angle Valves: ASME B16.34, provide with heat and corrosion-resistant trim.
Gate Valves
Bronze Gate Valves: MSS SP-80, 2 inches and smaller, wedge disc, inside screw type not less than Class 150. Use solder joint ends with copper tubing. Steel Gate Valves: ASME B16.34, provide with open stem and yoke type with solid wedge or flexible wedge disc and heat and corrosion-resistant steel trim.
Valves and Equipment
Valves shall be installed at the locations shown or specified, and where required for the proper functioning of the system as directed. Gate valves shall be used unless otherwise indicated, specified, or directed. Valves shall be installed with their stems horizontal to or above the main body of the valve.
Balancing Valves
Balancing valves shall have meter connections with positive shutoff valves. An integral pointer shall register degree of valve opening. Valves shall be calibrated so that flow in GPM can be determined when valve opening in degrees and pressure differential across valve is known. Each balancing valve shall be constructed with internal seals to prevent leakage and shall be supplied with preformed insulation. Valves shall be suitable for 250 degrees F temperature and working pressure of the pipe in which installed. Valve bodies shall be provided with tapped openings and pipe extensions with shutoff valves outside of pipe insulation. The pipe extensions shall be provided with quick connecting hose fittings for a portable meter to measure the pressure differential. One portable differential meter shall be furnished. The meter suitable for the operating pressure specified shall be complete with hoses, vent, and shutoff valves and carrying case. In lieu of the balancing valve with integral metering connections, a ball valve or plug valve with a separately installed orifice plate or venture tube may be used for balancing. Plug valves and ball valves 8 inches or larger shall be provided with manual gear operators with position indicators.
PIPING INSTALLATION
4.1 Welding
Submit 2 copies of qualified procedures and list of names and identification symbols of qualified welders and welding operators, prior to welding operations. Piping shall be welded in accordance with qualified procedures using performance qualified welders and welding operators. Procedures and welders shall be qualified in accordance with Submit 2 copies of qualified procedures and list of names and identification symbols of qualified welders and welding operators, prior to welding operations. Piping shall be welded in accordance with qualified procedures using performance qualified welders and welding operators. Procedures and welders shall be qualified in accordance with ASME BPVC SEC IX. Welding procedures qualified by others, and welders and welding operators qualified by another employer may be accepted as permitted by ASME B31.1.
4.2. Piping
Unless otherwise specified, pipe and fittings installation shall conform to the requirements of ASME B31.1. Pipe shall be cut accurately to measurements established at the job site and worked into place without springing or forcing, completely clearing all windows, doors, and other openings. Cuttings or other weakening of the building structure to facilitate piping installation will not be permitted without written approval. Pipe or tubing shall be cut square, shall have burrs removed by reaming, and shall be so installed as to permit free expansion and contraction without causing damage to building structure, pipe, joints, or hangers. Changes in direction shall be made with factory made fittings, except that bending of pipe up to 4 inches will be permitted, provided a pipe bender is used and wide sweep bends are formed. The center line radius of bends shall not be less than six diameters of the pipe.
Bent pipe showing kinks, wrinkles, flattening, or other malformations will not be accepted. Vent pipes shall be installed through the roof as indicated and shall be flashed as specified. Horizontal mains shall pitch up or down in the direction of flow as indicated. The grade shall be not less than 1 inch in 40 feet. Reducing fittings shall be used for changes in pipe sizes. Open ends of pipelines and equipment shall be capped or plugged during installation to keep dirt or other foreign materials out of the systems. Pipe not otherwise specified shall be uncoated. Unions and other components for copper pipe or tubing shall be brass or bronze. Connections between ferrous and copper piping shall be electrically isolated using dielectric unions.
4.3 Joints
Except as otherwise specified, joints used on steel pipe shall be threaded for fittings 1 inch and smaller; threaded or welded for 1-1/4 inches up through 2-1/2 inches; and flanged or welded for 3 inches and larger. Pipe and fittings 1- 1/4 inches and larger installed in inaccessible conduits or trenches beneath concrete floor slabs shall be welded.
Unless otherwise specified, connections to equipment shall be made with black malleable iron unions for pipe 2-1/2 inches or smaller in diameter, and with flanges for pipe 3 inches or larger in diameter.
4.4 Low Temperature Systems
Piping may have threaded, welded, flanged or grooved mechanical joints as applicable and as specified. Reducing fittings shall be used for changes in pipe sizes. In horizontal lines, reducing fittings shall be the eccentric type to maintain the top of the adjoining pipes at the same level.
4.5 Threaded Joint
Threaded joints shall be made with tapered threads properly cut, and shall be made tight with PTFE tape complying with ASTM D3308, or equivalent thread joint compound applied to the male threads only, and in no case to the fittings.
4.5 Welded Joints
Joints shall be fusion-welded unless otherwise required. Changes in direction of piping shall be made with welding fittings only. Branch connection may be made with either welding tees or branch outlet fittings. Branch outlet fittings shall be forged, flared for improvement of flow where attached to the run, and reinforced against external strains.
4.6 Flanged Joints or Unions
Flanged joints or unions shall be provided in each line immediately preceding the connection to each piece of equipment or material requiring maintenance such as coils, pumps, control valves, and similar items. Flanged joints shall be faced true, provided with gaskets, and made square and tight. Full-faced gaskets shall be used with cast iron flanges.
4.7 Joints for Copper Tubing
Solder conforming to ASTM B32 alloy grade Sb5 or Sn96. Solder and flux shall be lead free (less than 0.2 percent of lead). An extracted mechanical tee joint may be made in copper tube. Make joint with an appropriate tool by drilling a pilot hole and drawing out the tube surface to form a collar having a minimum height of three times the thickness of the tube wall. To prevent the branch tube from being inserted beyond the depth of the extracted joint, provide dimpled depth stops. Notch the branch tube for proper penetration into fitting to assure a free flow joint.
Braze extracted joints using a copper phosphorous classification brazing filler metal. Soldered joints shall not be permitted.
4.8 Connections to Equipment
Supply and return connections shall be provided by the Contractor unless otherwise indicated. Valves shall be installed in accordance with the manufacturer's recommendations. Unless otherwise indicated, the size of the supply and return pipes to each piece of equipment shall be not smaller than the connections on the equipment. No bushed connections shall be permitted. Change in sizes shall be made with reducers or increasers only.
Low Temperature Water Supply and Return Connections, unless otherwise indicated, shall be made with malleable iron unions for piping 2-1/2 inches or less in diameter and with flanges for pipe 3 inches or more in diameter.
4.9 Supports
Hangers used to support piping 2 inches and larger shall be fabricated to permit adequate adjustment after erection while supporting the load. Pipe guides and anchors shall be installed to keep pipes in accurate alignment, to direct the expansion movement, and to prevent buckling, swaying, and undue strain. All piping subjected to vertical movement when operating temperatures exceed ambient temperatures, shall be supported by variable spring hangers and supports or by constant support hangers. Where threaded rods are used for support, they shall not be formed or bent. Pipe hangers, inserts and supports shall conform to MSS SP-58.
Pipe hangers on horizontal insulated pipe shall be the size of the outside diameter of the insulation.
4.10 Valves and Equipment Accessories
Valves and Equipment
Valves on equipment shall be installed at the locations shown or specified, and where required for the proper functioning of the system as directed. Gate valves shall be used unless otherwise indicated, specified, or directed.
Valves shall be installed with their stems horizontal to or above the main body of the valve Air Vents
Air Vents shall be installed where indicated, and on all high points and piping offsets where air can collect or pocket.
4.11 Manufacturer's Services.
Provide the services of a manufacturer's representative who is experienced in the installation, adjustment, and operation of the equipment specified. The representative shall supervise the installation, adjustment, and testing of the equipment.
4.12 Testing and Cleaning
Submit performance test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, upon completion and testing of the installed system. Indicate in each test report the final position of controls.
4.13. Pressure Testing
Notify the Contracting Officer 2 days before the tests are to be conducted. The tests shall be performed in the presence of the Contracting Officer. Furnish all instruments and personnel required for the tests. All test results shall be accepted before thermal insulation is installed. The entire chilled/glycol system, including chiller and fittings, shall be hydrostatically tested and proved tight under a pressure of 45 psig for a period of four hours.
4.14. Cleaning
After the hydrostatic tests have been made and prior to the operating tests, the chiller and piping shall be thoroughly cleaned and the system thoroughly flushed out with fresh water. Equipment shall be wiped clean, with all traces of oil, dust, dirt, or paint spots removed. The Contractor will be responsible for maintaining the system in a clean condition until final acceptance. Bearings shall be lubricated with oil or grease as recommended by the manufacturer.
4.15. Field Training
Provide a field training course for designated operating and maintenance staff members. Provide training for a total period of 2 hours of normal working time starting after the system is functionally complete but prior to final acceptance tests. Field training shall cover all of the items contained in the approved Operation and Maintenance Manuals. Submit 2 copies of operation and 2 copies of maintenance manuals for the equipment furnished. One complete set, prior to performance testing and the remainder upon acceptance. Operating manuals shall detail the step-by-step procedures required for system startup, operation, and shutdown. Operating manuals shall include the manufacturer's name, model number, parts list, and brief description of all equipment and their basic operating features. Maintenance manuals shall list routine maintenance procedures, water treatment procedures, possible breakdowns and repairs, and troubleshooting guides. Maintenance manuals shall include piping and equipment layout and simplified wiring and control diagrams of the system as installed. Manuals shall be provided prior to the field training course.
4.16 Duct Systems
Provide metal ductwork construction, including all fittings and components, that complies with SMACNA 1966, as supplemented and modified by this specification.
a. Ductwork shall be constructed meeting the requirements for the duct system static pressure.
b. Provide radius type elbows with a centerline radius of 1.5 times the width or diameter of the duct where space permits. Otherwise, elbows having a minimum radius equal to the width or diameter of the duct or square elbows with factory fabricated turning vanes are allowed.
c. Provide ductwork that meets the requirements of Seal Class A.
d. Provide sealants that conform to fire hazard classification specified and are suitable for the range of air distribution and ambient temperatures to which it is exposed. Do not use pressure sensitive tape as a sealant.
e. Make spiral lock seam duct, and flat oval with duct sealant and lock with not less than 3 equally spaced drive screws or other approved methods indicated in SMACNA 1966. Apply the sealant to the exposed male part of the fitting collar so that the sealer is on the inside of the joint and fully protected by the metal of the duct fitting. Apply one brush coat of the sealant over the outside of the joint to at least 2-inch band width covering all screw heads and joint gap. Dents in the male portion of the slip fitting collar are not acceptable. Fabricate outdoor air intake ducts and plenums with watertight soldered or brazed joints and seams.
4.17 Metallic Flexible Duct
a. Provide duct that conforms to UL 181 and NFPA 90A with factory-applied insulation, vapor barrier, and end connections. Provide duct assembly that does not exceed 25 for flame spread and 50 for smoke developed. Provide ducts designed for working pressures of 2 inches’ water gauge positive and 1.5 inches’ water gauge negative.
Provide flexible round duct length that does not exceed 5 feet. Secure connections by applying adhesive for 2 inches over rigid duct, apply flexible duct 2 inches over rigid duct, apply metal clamp, and provide minimum of three No. 8 sheet metal screws through clamp and rigid duct.
b. Inner duct core: Provide interlocking spiral core constructed of zinc- coated steel, aluminum, or stainless steel inner duct core.
c. Insulation: Provide inner duct core that is insulated with mineral fiber blanket type flexible insulation, minimum of 1 inch thick. Provide insulation covered on exterior with manufacturer's standard fire retardant vapor barrier jacket for flexible round duct.
4.18 General Service Duct Connectors
Provide a flexible duct connector approximately 6 inches in width where sheet metal connections are made to fans or where ducts of dissimilar metals are connected. For round/oval ducts, secure the flexible material by stainless steel or zinc-coated, iron clinch-type draw bands. For rectangular ducts, install the flexible material locked to metal collars using normal duct construction methods. Provide a composite connector system that complies with NFPA 701 and is classified as "flame-retardant fabrics" in UL Bld Mat Dir.
4.18 Manual Balancing Dampers.
a. Furnish manual balancing dampers with accessible operating mechanisms. Use chromium plated operators (with all exposed edges rounded) in finished portions of the building. Provide manual volume control dampers that are operated by locking-type quadrant operators.
b. Unless otherwise indicated, provide opposed blade type multi-leaf dampers with maximum blade width of 12 inches. Provide access doors or panels for all concealed damper operators and locking setscrews. Provide access doors or panels in hard ceilings, partitions and walls for access to all concealed damper operators and damper locking setscrews. Coordinate location of doors or panels with other affected contractors.
c. Provide stand-off mounting brackets, bases, or adapters not less than the thickness of the insulation when the locking-type quadrant operators for dampers are installed on ducts to be thermally insulated, to provide clearance between the duct surface and the operator. Stand- off mounting items shall be integral with the operator or standard accessory of the damper manufacturer.
4.19 Diffusers, Registers, and Grilles
Provide factory-fabricated units of aluminum or steel as indicated that distribute the specified quantity of air evenly over space intended without causing noticeable drafts, air movement faster than 50 fpm in occupied zone, or dead spots anywhere in the conditioned area. Provide outlets for diffusion, spread, throw, and noise level as required for specified performance. Certify performance according to ASHRAE 70. Provide sound rated and certified inlets and outlets according to ASHRAE 70. Provide sound power level as indicated. Provide diffusers and registers with volume damper with accessible operator, unless otherwise indicated; or if standard with the manufacturer, an automatically controlled device is acceptable. Provide opposed blade type volume dampers for all diffusers and registers, except linear slot diffusers. Provide linear slot diffusers with round or elliptical balancing dampers. Where the inlet and outlet openings are located less than 7 feet above the floor, protect them by a grille or screen according to NFPA 90A.
Diffusers
Provide diffuser types indicated. Furnish ceiling mounted units with anti- smudge devices, unless the diffuser unit minimizes ceiling smudging through design features. Diffusers shall be welded construction with baked enamel finish. Provide diffusers with air diffusing vanes of the type indicated. Install ceiling mounted units with rims tight against ceiling. Provide sponge rubber gaskets between ceiling and surface mounted diffusers for air leakage control. Provide suitable trim for flush mounted diffusers. For connecting the duct to diffuser, provide duct collar that is airtight and does not interfere with volume controller. Provide return or exhaust units that are similar to supply diffusers.
Registers and Grilles
Provide units that are four-way directional-control type, except provide return and exhaust registers that are fixed horizontal or vertical louver…