Attachment 3-GFI Form_NAVSEA_4340_2.pdf

PDF 1 MB Posted

Attached to
ACRU Production Contract Solicitation Federal contract opportunity
Solicitation number
N64498-20-R-0002
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a Government Furnished Information form outlining technical requirements for an Advanced Carbon Dioxide Removal Unit production contract solicitation. The solicitation seeks proposals for the production of up to six ACRUs along with associated special tools and spare parts, as well as ACRU engineering services. A Technical Data Package will be provided to awardees. Responses are due by 16 August 2019. The Naval Sea Systems Command is seeking these ACRUs and services to support carbon dioxide removal. Key technical requirements and specifications are outlined in the ACRU Technical and Qualification Requirements Document. The pre-existing ACRU production contract and award date are also provided for reference.

View the file

Other files for this federal contract opportunity

Other files attached to ACRU Production Contract Solicitation, newest first.
File Type Posted
N6449820R0002-0005.pdf PDF
N6449820R0002-0004.pdf PDF
N6449820R0002-0003.pdf PDF
N6449820R0002-0002.pdf PDF
N6449820R0002-0001.pdf PDF
Attachment 2-List of Key Personnel.docx DOCX document
Attachment 1-DD254.pdf PDF
N6449820R0002.pdf PDF
Exhibit A_CDRLs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2

GOVERNMENT FURNISHED INFORMATION

ATTACHMENT # PR#

PROGRAM TITLE: CONTRACT NUMBER: DATE:

CODE:

(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE

NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of

GOVERNMENT FURNISHED INFORMATION

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

11.0.1.20130826.2.901444.899636

CurrentPage:
PageCount:
TextField1: 3
TextField2: TBD
TextField7: Advanced Carbon Dioxide Removal Unit (ACRU) Production
TextField8: TBD
DateField1: 16 August, 2019
TextField3: 416
DateField3: DO award
DateField3: DO award
DateField3: DO award
DateField3: DO award
DateField3: DO award
DateField2: 2019-08-30
DateField2: 2019-08-30
DateField2: 2019-08-30
DateField2: 2019-07-02
DateField2: 2017-01-26
TextField6: various
TextField6: ACRU-spares
TextField6: ACRU-software-20190830
TextField6: ACRU-TM-20190702
TextField6: ACRU-TQRD-RevA
TextField5: ACRU production-level drawings & schematics
TextField5: ACRU spares list
TextField5: ACRU software & source code
TextField5: ACRU Technical Manual
TextField5: ACRU Technical & Qualification Requirements Document
TextField4: 1
TextField4: 5
TextField4: 4
TextField4: 3
TextField4: 2

File details come from the government source that posted it. Updated .