N64498-19-R-4001_0001.pdf

PDF 142 KB Posted

Attached to
LCAC Bleed Air Anti Ice System (BAAS) Kits
Solicitation number
N64498-19-R-4001
Issued by

About this file

Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

-This amendment is being issued in order to answ er questions received for the subject solicitation.

-See “Summary of Changes” for additional details.

-Attached to this amendment is the updated CDRL A002 First Article Test Plan - Exhibit A.

-The required response date/time has changed from November 5, 2018 03:00 PM to November 15, 2018 03:00 PM.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6449819R4001

X 9B. DATED (SEE ITEM 11)

04-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Nov-2018

CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 0231, ANTHONY PICCARI

215-897-1390, ANTHONY.PICCARI@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

N64498 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X 1

N6449819R4001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

Below are the questions and answers:

Q1: Page 46, (2) c. references a Cost Summary Format: “The Cost/Price Summary shall be submitted using

Microsoft Excel (2010 or prior) in the Cost Summary Format provided as Attachment 4 to this solicitation.”, however, this Attachment is not listed in Section J, was not provided, and is not referenced further down in Section L Volume IV price proposal instructions. Please advise.

A1: The Attachment 4 reference has been removed and Section L.2.3 has been modified for clarification.

Q2: Section H, page 25, includes Clause 5252.247.9110 Tug and Pilot Services (Sep 1990). Request removal of the clause; first Article Testing (fit checks) will not require tug boat support.

A2: This clause has been removed.

Q3: NAVSEA Drawing No. 251-7616055 REV – D

Welding, Fabrication, and Inspection Requirements

Dwg 251-7616055 (D) is unclear on welding, and inspection requirements. Specifically, joint designs and NDT requirements. Request joint designs and NDT requirements for pipe welding be provided.

A3: The Statement of Work within Section C states “Welding shall be in accordance with NAVSEA Technical

Publication S9074-AR-GIB-010A/278, with welders and procedures qualified IAW NAVSEA Technical Publication T9074-AQ-GIB-010/248.”. Joint designs shall be 100 percent efficient welds in accordance with Section 9 of NAVSEA Technical Publication S9074-AR-GIB-010A/278 for Class P-2 service classification. Welds shall be inspected in accordance with requirements for Class P-2 welds in Section 10 of NAVSEA Technical Publication S9074-AR-GIB-010A/278.

Q4: NAVSEA Drawing No. 251-7616055 REV – D

Para 3.6 Insulation Treatment

Para 3.6 of Dwg 251-7616055 (D) does not include a source of supply for insulation treatment. Request a source of supply to quote insulation treatment per Para 3.6 of Dwg 251-7616055 (D).

A4: It is the Contractor’s responsibility to find a source of supply of insulation per Para 3.6 of Dwg 251-

7616055 (D).

Q5: NAVSEA Drawing No. 251-7616055 REV – D

Flange Part Numbers

Request equivalent part numbers for male flange R52GF4-0300M0 and female flange P/N R52GF4- 0300F0. These pieces are no longer manufactured by the original manufacturer/source of supply.

A5: If an original manufacturer/source of supply cannot be found, sufficient information is given to manufacture the flanges is given in Sheets 1 and 3 of NAVSEA Drawing No. 251-7616056 REV – F and NAVSEA Drawing No. 251-7616055 REV – D.

Q6: NAVSEA Drawing No. 251-7616055 REV – D

Temperature Testing

Request additional information regarding Temperature Testing, Ambient to 650 degrees, Paragraph 3.5 of 251-7616055 (D). The drawing is unclear regarding what type of test it is (i.e. ambient surface temperature with a heated medium, ambient surface temperature during a heat treatment, etc.).

A6: The test shall ensure the piping system is qualified to perform in an ambient temperature of 650F.

Q7: RFP Section F and CDRLs

Delivery CLIN 0001 and 0002

Section F CLIN 0001 and CLIN 0002 delivery dates are inconsistent with CDRL due dates. Request Updating Section F CLIN 0001’s delivery date for the Test Plan to match the CDRL A002: No later than 60 days after contract. Request updating Section F CLIN 0002’s delivery date for the Test Report to match CDRL A001: No later than 30 days after test is complete.

A7: Section F has been updated. CLIN 0001 delivery has been changed to “Due 60 Days after date of Delivery

Order.” CLIN 0002 delivery has been changed to “Due 30 Days after first article test is complete.” CDRL A002 language for BLK 8 and BLK 10, 11, 12, &13 have been updated.

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 05-Nov-2018 03:00 PM to 15-Nov-2018 03:00 PM.

SECTION F - DELIVERIES OR PERFORMANCE

The following have been modified:

DELIVERY

CLIN Ordering Period MAX

QUANTITY

Delivery Ship to Address DODAAC

0001 From date of contract award through 12 months thereafter

1 Each Due 60 Days after date of Delivery Order ryan.quinzan-singer@navy.mil

N/A

0002 From date of contract award through 12 months thereafter

1 Each Due 30 Days after first article test is complete.

ryan.quinzan-singer@navy.mil

N/A

0003 From date of contract award through 12 months thereafter

1 Kit Due 180 Days after date of Delivery Order

To be cited on Delivery Order.

To be cited on Delivery Order.

0004 From date of contract award through 12 months thereafter

3 Kits Due 180 Days after date of Delivery Order

To be cited on Delivery Order.

To be cited on Delivery Order.

0005 From 13 months after award through 24 months thereafter

4 Kits Due 180 Days after date of Delivery Order

To be cited on Delivery Order.

To be cited on Delivery Order.

0006 From 25 months after award through 36 months thereafter

4 Kits Due 180 Days after date of Delivery Order

To be cited on Delivery Order.

To be cited on Delivery Order.

0007 From contract award through 36 months thereafter

1 Lot N/A N/A N/A

SECTION H - SPECIAL CONTRACT REQUIREMENTS

The following have been deleted:

5252.247-9110 TUG AND PILOT SERVICES SEP 1990

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

CONTENT OF PROPOSALS

L.1 GENERAL INSTRUCTIONS

The Offeror shall submit all information required by this RFP and in the same format as outlined herein. Failure to comply with the requirements of the RFP may result in the Offeror being removed from consideration for award.

The Government does not assume the duty to search for data to cure problems it finds in proposals. Proposals shall be sufficiently detailed to enable Government evaluation board members to make a thorough evaluation and to arrive at a sound determination as to whether or not the prospective Offeror has a thorough understanding of the requirements and associated risks and is able, willing, and competent to devote the resources necessary to meet the requirements.

Cost/pricing information should only be present in the Cost Volume.

No classified information shall be provided in any volume.

A “major subcontractor” is considered to be any entity proposed to perform 30% or more of the total proposed contract value for the purposes of this solicitation.

The projected award date/ start date for the contract(s) resulting from this solicitation is March 27, 2019.

L.1.2. SUBMISSION OF QUESTIONS AND COMMENTS

Offerors may submit questions, concerns, or request clarification of any aspect of this solicitation electronically as follows:

TO: Anthony.Piccari@navy.mil CC: Michael.Ford@navy.mil;

SUBJECT LINE: Question (insert name of Offeror) LCAC BAAS Kits RFP: N64498-18-R-4030

The questions should include the page number and paragraph number or identifier which pertains to the Offeror’s question. Questions received without this information may not be answered. The deadline for receipt of questions is two weeks after date of solicitation issuance. Although every effort will be made, the Government makes no guarantee that questions received after this deadline will be answered. Acknowledgement of receipt of questions will not be made.

L.1.3. SOLICITATION CHANGES

Any changes or additional information (responses to questions, amendments, etc.) related to the solicitation will be made available only through the following website: http://www.fbo.gov. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall provide proposals in response to any and all amendments to this solicitation by the date and time specified in the amendment(s). The cover letter /transmittal letter shall acknowledge receipt /response to the amendment version).

L.2. PROPOSAL FORMAT

Proposals shall be prepared on standard 8-1/2” by 11” paper, single-spaced at 1 with spacing before and after paragraphs set at –0– and left aligned paragraphs. Pages shall have a one-inch margin. The font shall be Times New Roman with a font size of 12 throughout the document.

The Offeror’s company name, the solicitation number and the date of the proposal shall appear at the top of each page. Each page shall contain a footer that includes, at a minimum, the volume number, page number and, if applicable, restrictive legend (see FAR 52.215-1(e) (2)).

The Non-Cost/Price Volumes of a Proposal shall not contain any reference to cost. They should be written so that government personnel evaluating the proposal can arrive at a sound determination as to whether the proposal meets the requirements of this solicitation. To this end, the proposal shall be specific, detailed and complete as to clearly and fully demonstrate that the prospective Contractor has a clear understanding of the technical requirements contained in Section C of this solicitation. Statements such as "the Offeror understands", "will comply with the Performance Work Statement," "standard procedures will be employed"; "well known techniques will be used" and general paraphrasing of the Performance Work Statement are considered inadequate.

L.2.1. PAGE NUMBERS AND LIMITS

A page is defined as one sheet of paper with typing on one side. When information is contained on both sides of a single sheet of paper it will be counted as two pages and shall be numbered accordingly. Partial pages count as a full page. Foldouts may be used for diagrams, charts, or graphic material only that could not be depicted otherwise on standard 8-1/2” by 11” paper. Foldouts shall fold from left to right (sideways), shall not exceed 11” by 17” and shall count as two pages.

Specific page limitations are provided below in Table L.3. Pages that exceed the page count limit will not be evaluated by the Government. If the proposal exceeds the identified page limit, the Government will remove all pages exceeding the specified page count. Blank pages must contain only material pertinent to the page heading and marked "Intentionally Left Blank." Index pages and Tabs are required and shall be cross-referenced to the TOC.

All pages within a page limited volume shall be consecutively numbered, starting at page one, and shall not exceed the page limitation.

The following are not included in the page limitations:

a. Title/Cover pages

b. Tables of Contents

c. Glossaries of abbreviations and acronyms

d. Past Performance References

L.2.2 DELIVERY AND PACKAGING INSTRUCTIONS FOR HARD COPY PROPOSALS

http://www.fbo.gov/

Responses shall be submitted in sealed envelopes or boxes clearly marked:

• Offeror’s name and return address

• Government address; and

• The solicitation number

• Proposals are to be delivered by mail to the recipient in Block 7 of the front page of the solicitation.

L.2.3 INSTRUCTIONS FOR HARD COPY PROPOSALS CONTAINING CD-ROM’S

• Emailed proposals are not permitted.

• CD-ROM/DVDs submitted to accompany hard copy proposals shall be in accordance with the following requirements:

The electronic media and hard copy proposals shall be identical in content. Any discrepancies between the electronic and hard copy proposals will result in the hard copy taking precedence.

(1) All electronic/soft files shall be submitted on CD-ROM or DVD.

(2) The disks shall be labeled to indicate the Offeror’s name, the solicitation number, date of submission, appropriate security classification markings, format, and associated volume number.

• The electronic/soft copy proposal on the CD-ROM/DVD shall meet the following format requirements:

a. All file names shall include the Offeror's company name and title/subject of file content; all files shall be named with the file extension .doc/.docx, .xls/.xlsx, .ppt, or .pdf.

b. All supporting Cost Data shall be provided in Microsoft Excel software, with all files named with the file extension xls/.xlsx.

c. When printed, the length and width of each spreadsheet shall not exceed one 8.5 x 11-inch paper in landscape orientation. The font shall be in 10-point Times New Roman Font. Spreadsheets shall not contain hidden cells, formulas, or tabs. No scaling reductions will be allowed. Files or spreadsheets that exceed these parameters will not be evaluated.

d. Compression tools are limited to PKZip or WinZip.

e. No graphics or pictures other than necessary or specifically requested graphs/tables/charts are allowable in any volume of the proposal.

f. The font size for text contained in embedded graphics (tables and illustrations) shall be no smaller than 8-point font.

L.3. PROPOSAL CONTENT AND ORGANIZATION

The proposal shall contain four (4) separate volumes with page limits identified as follows:

Volume Contents Original Copies Page

Limits I. PROPOSAL DOCUMENTS 1 1 None

II. FACTOR 1 TECHNICAL 1 3 30

Subfactor A – Technical Capabilities Subfactor B – Corporate Experience III. FACTOR 2 PAST PERFORMANCE 1 3 None IV. FACTOR 3 COST/PRICE 1 1 None

L.3.1. VOLUME I: PROPOSAL DOCUMENTS

This volume is the Offeror’s contractual commitment and ready for acceptance by the Government.

L.3.1.1 TRANSMITTAL/COVER LETTER

The Offeror’s proposal shall include a transmittal letter on the Offeror’s letterhead signed by an executive of the company who possesses authority to contractually bind the Offeror. The letter should provide the name, title, phone number and e-mail address of the Offeror’s principal point of contact for the solicitation and identify those individuals authorized to negotiate with the Government and contractually bind the Offeror. The letter should include the following information:

1. Reference the RFP number and acknowledge that it transmits an offer in response to the requirements as stated in the solicitation,

2. Identify all attachments and enclosures being transmitted as part of the response to the RFP,

3. List all subcontractors identified in the Offeror’s proposal and identify the type of subcontract proposed by each subcontractor (e.g., cost-type, fixed-price, etc.) with rationale for the selection of subcontract type.

4. Shall state that the proposal is made without qualification or exception to any terms and conditions appearing in the solicitation; or if the Offeror takes any exceptions to solicitation, provide a full explanation. Each exception shall be referenced to the applicable paragraph or contract line item number.

Any exceptions made, and not clearly delineated here will not be considered or accepted. Any material exceptions to the RFP may render the proposal unacceptable and ineligible for award.

5. Statement that the proposal is valid for at least 180 calendar days after the date established for receipt of offers.

6. Provide the following information pertaining to the Offeror:

a. Commercial and Government Entity (CAGE) number,

b. Data Universal Numbering System (DUNs) Number,

c. Taxpayer Identification Number (TIN),

d. Address(es) of the location(s) at which the Offeror intends to perform the proposed effort,

e. Name, address and telephone number of the cognizant Defense Contract Audit Agency (DCAA), audit office,

f. Name, address and telephone number of the cognizant Defense Contract Management Agency

(DCMA) office,

g. If no Organizational Conflict of Interest exists, then the Offeror shall clearly state this in its cover letter

h. Names, titles, phone numbers and electronic addresses of persons authorized to negotiate on the

Offeror’s behalf with the Government in connection with this solicitation.

7. If the proposal contains a “contractor team arrangement” as defined in FAR 9.601, provide information that describes the contractor team arrangement to include any information that will help the Government understand the contractor team arrangement purpose and benefit.

L.3.2 VOLUME II: FACTOR 1 – TECHNICAL

L.3.2.1 SUBFACTOR A

Technical Capabilities: Offerors shall describe their intended manufacturing and production processes, facilities, equipment, and other company resources that are applicable to the production of this requirement. Offerors shall demonstrate capability to weld in accordance with NAVSEA Technical Publication S9074-AR-GIB-010A/278, with welders and procedures qualified IAW NAVSEA Technical Publication T9074-AQ-GIB-010/248.

L.3.2.2 SUBFACTOR B

Corporate Experience: Offerors shall clearly demonstrate their corporate experience in providing equipment that is the same or similar to the requirement cited in Section C of the Solicitation.

L.3.3 VOLUME III: FACTOR 2 – PAST PERFORMANCE

The Government will evaluate the Past Performance of the Prime Offeror and major subcontractors proposed. The past performance evaluation factor assesses the degree of confidence the Government has in an Offeror’s ability to supply products and services that meet users’ needs, based on a demonstrated record of performance.

List all relevant contracts performed within the last 3 years, whether completed or not, including Federal, State and Local Government and private sector contracts.

For evaluation of Past Performance the Government may use information from any sources available to it including, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), and Electronic Subcontract Reporting System (eSRS). The Government may review relevant past performance information from other sources. Offerors should provide relevant past performance information for similar or related work that has taken place during the last three years. Each Offeror has the opportunity to provide in its proposal any information regarding its past performance of contracts similar to the Government's requirement that it would like the Government to consider. This includes information that the Offeror considers essential to the Government's evaluation or explanatory information of poor performance.

Offerors should provide the following information:

1. Contract Number

2. Customer/Agency

3. Contracting Officer /Technical Point of Contact/POC (names and telephone numbers)

4. Brief description of the scope of work

5. Contract type

6. Award Price

7. Total Labor-Hours of Effort

8. Period of Performance

9. Contract Deliverables

To obtain information, the Government may contact the points of contact listed, however, the Government is not required to do so. The Government may contact references other than those provided by the Offeror to evaluate past performance.

L.3.4 VOLUME IV: FACTOR 3 - COST/PRICE PROPOSAL

L.3.4.1 COMPLETED STANDARD FORM (SF) 33 SOLICITATION OFFER AND AWARD DOCUMENT

Offerors shall submit the Standard Form 33, “Solicitation, Offer and Award,” for the solicitation and each amendment, as applicable with blocks 12 through 18 completed/signed by the Offeror and signed by or an authorized party in Block 17. Any signatures required under this section shall be pen and ink.

L.3.4.2 COMPLETED RFP

This document shall be fully executed. The document shall not be embellished with any cover or binding. If the Offeror makes any qualifications to any provisions in the RFP, all such qualifications shall be listed in the transmittal letter to the proposal.

Offerors must fill in all areas of the RFP listed as Offeror fill-ins, including proposed costs including unit price and fees for each CLIN/SLIN in Section B. (Note - This information is exempt from the font and spacing requirements identified under paragraph L.2.1). Special attention should be taken to accurately enter the prices required in Section B.

Offerors shall submit signed Section K signed Representations, Certifications and Acknowledgements and System for Award Management (SAM). Offerors shall ensure that Representations and Certifications in SAM are current in the Online Representations and Certifications (ORCA) database at www.SAM.gov.

http://www.sam.gov/

Each Offeror is required to submit a Cost/Price Volume for all priced CLINs. NO COST/PRICE INFORMATION SHALL BE SUBMITTED IN ANY VOLUME OTHER THAN THIS COST VOLUME. Electronic copies, if authorized, shall be submitted on separate media, using MS Word/MS Excel as applicable and shall be in accordance with Section. L.2.4 Instructions for Electronic Files.

Total quantities amounts are estimates only to establish ceiling amounts, and do not necessarily reflect the total amount of BAAS kits that the Government will actually order. The Government may order less than the total quantities or may order up to the maximum quantities listed in Section B.

(End of Summary of Changes)

File details come from the government source that posted it.