J&A Number:

Code: 0231

P.R. Number: 17-MJF-001 SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE III JUSTIFICATION & APPROVAL FOR USE OF OTHER THAN FULL AND OPEN COMPETITION

JUSTIFICATION

1. Agency and Contracting Activity.

Department of the Navy, Naval Surface Warfare Center, Philadelphia Division (NSWCPD), Contracts Division, Code 0231, Philadelphia, PA.

2. Nature/Description of Action(s) Being Approved.

This is a justification to award a Small Business Innovation Research (SBIR) Phase III contract to Vi-Star Gear Company, Paramount, CA.

3. Description of Supplies/Services.

The ETF40B is the main engine for the Navy’s Landing Craft Air Cushion (LCAC) class of air-cushion vehicles. It is gas-turbine rated for 4,000 HP at 16,000 RPM. This engine is responsible for powering the LCAC’s propellers, lift fans, and bow thrusters, and was specifically designed for the LCAC as part of the Service Life Extension Program (SLEP.)

This procurement requires the contractor to receive and inspect Government-furnished ETF40B output shafts that were developed under the previous SBIR. The contractor will then make a determination, utilizing US Navy inspection criteria, whether to modify the existing output shafts or fabricate new output shafts in accordance with drawings and standards provided by the NSWCPD.

4. Identification of Statutory Authority.

10 U.S.C. 2304(c)(5), as implemented by FAR 6.302-5: Authorized or Required by Statute.

15 U.S.C. 638(r)(1) states:

“In the case of a small business concern that is awarded a funding agreement for Phase II of an SBIR or STTR program, a Federal agency may enter into a Phase III agreement with that business concern for additional work to be performed during or after the Phase II period.”

Furthermore, 15 U.S.C. 638(r)(4) states:

“To the greatest extent practicable, Federal agencies and Federal prime contractors shall issue Phase III awards relating to technology, including sole source awards, to the SBIR and STTR award recipients that developed the technology.”

5. Demonstration that Proposed Contractor’s Unique Qualifications or Nature of Acquisition Requires Use of Authority Cited.

The nature of the acquisition requires the use of the authority cited. The SBIR/STTR Programs are structured in three phases. Phase I (project feasibility) determines the scientific, technical and commercial merit and feasibility of the ideas submitted. Phase II (project development to prototype) is the major research and development effort, funding the prototyping and demonstration of the most promising Phase I projects. Phase III (commercialization) is the ultimate goal of the SBIR/STTR Programs. Because the Phase III work derives from, extends, or completes efforts performed under Phase I and Phase II, use of the authority cited is required.

6. Description of Efforts Made to Ensure Offerors Were Solicited From as Many Potential Sources as Practicable/ Public Notification through Government Point of Entry (GPE).

As described above, only Vi-Star Gear is being considered for Phase III award due to the nature of the acquisition. In accordance with FAR 5.202(a)(7), this proposed contract action does not require public notification to the GPE.

7. Determination of Fair and Reasonable Cost.

The Contracting Officer will determine prior to award that the negotiated price of the contract executed under this justification is fair and reasonable pursuant to FAR Subpart 15.4. This determination will be documented in the Business Clearance Memorandum, which will be included in the contract file.

8. Description of Market Research or Statement of the Reason Market Research was not Conducted.

FAR 10.001(a)(2) indicates that market research appropriate to the circumstances must be conducted. SBIR Phase III procurements are such that traditional market research to identify alternative sources is generally unnecessary. As described above, the Phase III work derives from, extends, or completes efforts performed under Phase I and Phase II.

9. Any Other Supporting Facts.

Not applicable.

10. Listing of Interested Sources.

Not applicable.

11. Actions Taken to Remove Barriers to Future Competition.

The Contracting Officer anticipates that competitors will enter the market once the product is commercialized. It is likely that future acquisitions will be competed using full and open competition and commercial item acquisition procedures. The Contracting Officer is not aware of any specific actions that would further remove barriers to competition.

12. Period of Performance.

The ordering period for the proposed action is sixty (60) months from date of award.

13. Total Estimated Dollar Value of the Acquisition Covered by this J&A, with Funding Specified by Year and Appropriation.

The total estimated value of this acquisition is $1,388,057. This procurement will be funded with OM&N funding. The funds are anticipated to be allocated as follows:

FY17
FY18
FY19
FY20
FY21
Total
$145,696
$295,763
$304,636
$313,775
$323,188
$1,383,058

14. Actions Attempted to Make Immediate Acquisition Competitive and Cost/Benefit Analysis

No actions were attempted to make the immediate acquisition competitive; no cost/benefit analysis was performed. As described above, only Vi-Star Gear is being considered for Phase III award due to the nature of the acquisition.

CERTIFICATIONS AND APPROVAL

TECHNICAL/REQUIREMENTS CERTIFICATION (FAR 6.303-2(c))

I certify that the facts and representations under my cognizance, which are included in this justification and its supporting acquisition planning data, except as noted herein, are complete and accurate to the best of my knowledge and belief.

TECHNICAL/REQUIREMENTS COGNIZANCE:

Signature VINCENT TEDESCO, CODE 425 Phone No. Date

LEGAL SUFFICIENCY REVIEW (NMCARS 5206.303(90))

I have determined this justification is legally sufficient.

Signature OFFICE OF COUNSEL (00L) Phone No. Date

CONTRACTING OFFICER CERTIFICATION (FAR 6.303-2(b)(12))

I certify that this justification is accurate and complete to the best of my knowledge and belief.

Signature KEVIN HANN, CODE 0231 Phone No. Date

COMPETITION ADVOCATE APPROVAL REQUIRED BY FAR 6.304(a)(2):

Upon the basis of the following justification, I hereby approve, as Procuring Activity Competition Advocate for NSWPCD, the use of other than full and open competition for the proposed procurement described herein, pursuant to the authority of 10 U.S.C. 2304(c)(5).

Signature KAREN GUTMAKER, CODE 02 Phone No. Date

DEPARTMENT OF THE NAVY

NAVAL SURFACE WARFARE CENTER

PHILADELPHIA DIVISION

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112-1403

� EMBED AcroExch.Document.7 ���

IN REPLY REFER TO:

_1274017415.pdf file:///C|/Documents and Settings/kathleen.holmes/Desktop/FOR INTRANET - JUNE 08/DOD 1_in Ltrhd (2).jpg file:///C|/Documents and Settings/kathleen.holmes/Desktop/FOR INTRANET - JUNE 08/DOD 1_in Ltrhd (2).jpg 6/3/2008 16:44:42

Local Disk file:///C|/Documents and Settings/kathleen.holmes/Desktop/FOR INTRANET - JUNE 08/DOD 1_in Ltrhd (2).jpg

File details come from the government source that posted it.