SB B-5 Water Intrusion Investigation Service

1. INTRODUCTION

The purpose of this project is to thoroughly inspect the whole interior and exterior of the facility in order to determine root cause and provide a report which indicates water intrusion locations and any architectural upgrades or repair work necessary to address any vulnerabilities in the structure that subject the structure to water intrusion.

2. BACKGROUND

SB Building 5 (B5) is a masonry building built in 2015. It has had water intrusion problems over the years.

3. SCOPE

The Contractor shall provide all material, equipment, labor and supervision required to perform a comprehensive investigation for water intrusion into B5 at NSWC, Seal Beach.

The duties of the Superintendent and Quality Control (QC) Manager may be performed by the same person, so long as requirements and expectations are met. The position of the Site Safety and Health Officer (SSHO) shall be independent and only perform the requirements pertaining to site safety and health.

The Contractor shall visit the job site and investigate entire building for vulnerabilities in the structure, both known and unknown, that has allowed water intrusion into the building indicated by this Scope of Work. Contractor shall visually inspect, measure, photograph, and otherwise document all spaces as required to accurately document the existing conditions. All investigative work shall conform to ASTM guidelines (i.e. ASTM E2128 – Standard Guide for Evaluating Water Leakage of Building Walls, ASTM ASTM D7053/D7053M-17 – Standard Guide for Determining and Evaluating Causes of Water Leakage of Low-Sloped Roofs, etc.). The Contractor shall carefully examine concealed spaces and document potential vulnerabilities. Non-destructive testing (i.e. thermal imaging) shall be performed whenever possible to reduce the amount of destructive testing necessary.

Floor plans, maps and other drawings if provided in this SOW are for general information and project orientation only and should be field verified before beginning investigative work. Enclosed drawings of existing conditions should be considered to be incomplete or inaccurate and are provided for reference purposes only. Drawings provided by the Government may not be up to date and should not be considered to be as-built drawings.

Contractor personnel should confirm all conditions on site. The following work is required:

STATEMENT OF WORK

3.1 BASE: ROOF INVESTIGATION

3.1.1 The Contractor shall inspect the roof in its entirety from both, outside and inside for any vulnerabilities in the material and structure, both known and unknown, that has allowed water intrusion into the building.

3.1.2 The Contractor shall simulate rain events on the roof exterior using contractor equipment and hoses hooked up to the building’s water system.

3.1.3 Contractor shall inspect parapet wall for any water intrusion or vulnerabilities that has allowed water intrusion into the building.

3.1.4 Contractor must address any risks associated with the work.

3.1.5 The Contractor must coordinate with Lead Radiographer prior to accessing roof.

3.1.6 At the end of the investigation, the contractor shall prepare and submit a detailed Water Intrusion Investigation and Mitigation report to include, but not limited to, diagrams showing location of leaks, photos, markups, and recommendations for repairs.

3.2 OPTION 1: BUILDING INTERIOR AND EXTERIOR INVESTIGATION

3.2.1 The Contractor shall simulate rainfall along the walls and windows using contractor equipment and hoses hooked up to the building’s water system.

3.2.2 Determine the route that the water is migrating from and if there is any potential for contamination along its path.

3.2.3 Identify potential dangers, including electrical shorts, chemical reactions, and soggy fallen ceiling tiles.

3.2.4 If there are any high hazards areas such as attic spaces that can become a confined space, the Contractor must plan accordingly and submit confined space permits.

3.2.5 The contractor shall coordinate with Code 102 and MS40 personnel to conduct destructive testing as deemed necessary to search for water intrusion routes based upon where evidence of water intrusion is seen or has been reported. This may include cutting sections of drywall. Any drywall damaged as a result of destructive testing will be repaired to match existing wall (paint and texture).

3.2.6 The Contractor must be escorted while in laboratory spaces.

3.2.7 At the end of the investigation, the contractor shall prepare and submit a detailed Water Intrusion Investigation and Mitigation report to include, but not limited to, diagrams showing location of leaks,

3.3 OPTION 2: EXTERIOR TOPOGRAPHY INVESTIGATION

3.3.1 The Contractor shall investigate the topography around the building to ensure water drainage and runoff are flowing away from the building and not pooling or percolating underneath the slab and foundation.

3.3.2 At the end of the investigation, the contractor shall prepare and submit a detailed Water Intrusion Investigation and Mitigation report to include, but not limited to, diagrams showing location of leaks,

4. APPLICABLE DOCUMENTS

Work, materials, and equipment shall comply with the most stringent of local, state, and federal authorities’ codes and ordinances of those plans and specifications. The Contractor is required to adhere to all applicable standards and guidelines specified in the contract. In the absence of named standards, broadly accepted professional standards shall prevail as related to the associated industries within tasks identified.

Document Type/No.

Title Date

29 CFR 1910

Occupational Safety and Health Standards for General Industry https://www.osha.gov/laws-regs/regulations/standardnumber/1910

Current

29 CFR 1926

Safety and Health Regulations for Construction https://www.osha.gov/laws-regs/regulations/standardnumber/1926

Current

EM 385-1-1

United States Army Corps of Engineers Safety & Health Requirements Manual https://www.publications.usace.army.mil/portals/76/publications/engineermanual s/em_385-1-1.pdf

FC 1-300-09N Facility Criteria Navy and Marine Corps Design Procedures Current

ICC IBC-2021

International Building Code https://shop.iccsafe.org/codes/2021-international-codes-and-references/2021-international-building-coder.html

UFC

Department of Defense Unified Facilities Criteria https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc Current

ASTM

American Society for Testing and Materials https://www.astm.org/ Current

AAMA

American Architectural Manufacturers Association https://fgiaonline.org/ Current

Attachment 1 Drawings – B5 Floor Plan with Markups, Site Map 21-Oct-2022 Attachment 2 Specifications 05-Apr-2022 Attachment 3 Physical Security Plan 28-Jan-2022 Attachment 4 Environmental Management Procedures Manual 2018 Attachment 5 Navy Safety & Occupational Health Manual 05-Jun-2020 Attachment 6 Project Sign Details – Plate 1USN Current Exhibit A Submittal Register Current

5. GENERAL REQUIREMENTS

5.1 SECURITY

5.1.1 Contractor must undergo government vetting before access can be granted.

5.1.2 Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration and transition for employees currently under Navy Commercial Access Control System (NCACS) are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential. For detailed process, see Attachment 2, Section 01 14 00.

5.1.3 Contractor must comply with Seal Beach Physical Security Plan requirements and policies, see Attachment 3.

5.1.4 Contractor must be escorted while in laboratory spaces.

5.2 SAFETY

5.2.1 Contractor shall perform all work in accordance with the United States Army Corps of Engineers Safety and Health Requirements Manual (EM-385-1-1). The Contractor is required to keep the work site neat and in presentable conditions at all times. Contractor shall continuously maintain a safe working area. All debris shall be removed from the work site on a continual and daily basis, and at project completion. The Contractor shall take special care to protect Government property. Any damage by Contractor shall be returned to original condition.

5.2.2 The Contractor is responsible for ensuring that all work under contract meets Federal Occupational Safety and Health Administration (OSHA) standards. The Contractor is responsible for ensuring safe work performance of employees and bears sole responsibility for the safety of its employees. The Contractor is expected to take all steps necessary to establish, administer, and enforce safety rules that will meet the current requirements of Federal OSHA.

5.2.3 The Contractor is responsible for ensuring that all work under contract meets state OSHA standards and local requirements such as the state of California OSHA (Cal/OSHA). These standards will apply for the Contractor activity on federal property within the respected state.

5.2.4 For detailed process, see Attachment 2, Section 01 35 36—Governmental Safety Requirements.

5.2.5 The Contractor must coordinate with the Lead Radiographer prior to accessing the roof.

5.2.6 Proper safety gear is required when on roof in areas where parapets are not sufficient - See Safety Representative

5.2.7 The Contractor shall stay clear of posted areas during operations involving explosives or classified material.

Areas will be clearly marked by building occupants.

5.3 ENVIRONMENTAL

5.3.1 The Contractor shall perform work under this contract consistent with the policy and objectives identified in the installation’s Environmental Management System (EMS), Attachment 4. The Contractor shall perform work in a manner that conforms to objectives and targets, environmental programs and operational controls identified by the EMS. The Contractor will provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, the Contractor shall take corrective and/or preventative actions. In addition, the Contractor shall ensure that its employees are aware of their roles and responsibilities under the EMS and how these EMS roles and responsibilities affect work performed under the contract.

5.3.2 The Contractor is responsible for ensuring that their employees receive applicable environmental and occupational health and safety training, and keep up to date on regulatory required specific training for the type of work to be conducted onsite. All on-site Contractor personnel, and their subcontractor personnel (if applicable), performing tasks that have the potential to cause a significant environmental impact shall be competent on the basis of appropriate education, training or experience.

5.4 WORK HOURS

5.4.1 Hours of operation are Monday through Friday, 0700-1600 (not including all Federal or State Holidays).

Noise shall be kept to a minimum since the facility will continue to be occupied during investigation.

5.4.2 All work that secures HVAC, electrical, voice and data shall be coordinated with B5 Building representative or Site Director.

5.4.3 In the event investigation work interferes with onsite-scheduled work, the Contractor may be required to work evenings and/or weekends to complete the investigation.

5.5 EXECUTION

5.5.1 All work shall be executed in compliance with Attachment 2 – UFGS Specifications. The Contractor is responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specification, and other services furnished by the Contractor under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its designs, drawings, specifications, and other services. Furthermore, neither the Government’s review, approval or acceptance of, nor payment for, the services required under this contract shall be construed to operate as a waiver of any rights under this contract or of any cause of action arising out of the performance of this contract.

5.5.2 The Contractor is responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specification, and other services furnished by the Contractor under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its designs, drawings, specifications, and other services. Furthermore, neither the Government’s review, approval or acceptance of, nor payment for, the services required under this contract shall be construed to operate as a waiver of any rights under this contract or of any cause of action arising out of the performance of this contract.

5.6 AS-BUILT DRAWINGS

5.6.1 For detailed process, see Attachment 2, Section 01 78 00—Closeout Submittals.

5.7 OPERATION AND MAINTENANCE (O&M)

5.7.1 For detailed process, See Attachment 2, Section 01 78 00—Closeout Submittals.

5.8 ADMINISTRATIVE REQUIREMENTS

5.8.1 Administrative Requirements shall be provided in accordance with Division 01 30 00— Administrative Requirements.

5.8.2 Submittals shall be in accordance with Attachment 2, Section 01 33 00—Submittal Procedures.

5.8.3 Supervision requirements shall comply with Attachment 2, Section 01 45 00.10 20—Quality Control for Minor Construction.

6. GOVERNMENT FURNISHED PROPERTY

6.1 Government Furnished Material

N/A

6.2 Government Furnished Equipment

N/A

6.3 Government Furnished Information

N/A

7. DELIVERABLES

Exhibit A – Submittal Register

ADDITIONAL INFORMATION

A. PERIOD OF PERFORMANCE / REQUIRED DELIVERY DATES

All work shall be completed 180 calendar days after award.

B. PLACE OF PERFORMANCE AND SHIPPING ADDRESS

NSWC Seal Beach 800 Seal Beach Blvd. Seal Beach, CA 90740

C. INSPECTION AND ACCEPTANCE/ TECHNICAL POINT OF CONTACT

TBD