Optical Dazzling Interdictor, Navy (ODIN) Alteration Installation Team Support Services
Solicitation number
N6339420R0031
Issued by

About this file

This document contains a request for information (RFI) and statement of work (SOW) for alteration installation team support services. The Naval Surface Warfare Center Port Hueneme Division seeks information from contractors interested in providing structural, piping, ventilation, electrical, and wiring installation and modification services aboard naval vessels for the Optical Dazzling Interdictor Navy system. Services include material management, planning, equipment pre-fabrication, installation execution aboard four Arleigh Burke-class destroyers in fiscal years 2021-2022, with an option for one additional ship. The SOW specifies requirements for program management, installation planning and coordination, material handling, and data deliverables. Responses to the RFI are requested by [date redacted] to inform potential set-aside opportunities under NAICS code 541330 for engineering services.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Alteration Installation Team (AIT) Installation Support Services

Section 1.0 Scope Section 2.0 Applicable Documents Section 3.0 General Requirements Section 4.0 Program Management and Control Section 5.0 Installation Task Planning and Coordination Section 6.0 Installation Material and Pre-Fabrication Section 7.0 Installations Execution, Reporting and AIT Close-out Section 8.0 Data Deliverables

Statement of Work Alteration Installation Team (AIT) Installation Support Services

1.0 Background

This procurement provides Alteration Installation Team (AIT) Installation Support Services to the Air Dominance Department (A-Dept.). These services include installation, modification and upgrade for various Combat Systems to include the Optical Dazzling Interdictor Navy (ODIN) for Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD), Port Hueneme, California. NSWC PHD is a field activity of Naval Sea Systems Command (NAVSEA).

1.1 SCOPE:

This Statement of Work (SOW) defines efforts required for AIT Support Services. This includes installation of structural, piping, ventilation, electrical and wire connection list removal, modification on board various naval vessels. The project is being managed by the Air Dominance Department of the Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD), Port Hueneme California. NSWC PHD is a field activity of Naval Sea Systems Command (NAVSEA) and is the In-Service Engineering Agent (ISEA) for the Temporary Alteration

(TMPALT) 93672.

1.1.1 Contractor shall provide TMPALT 93672 installation, Optical Dazzling Interdictor Navy (ODIN), aboard four ARLEIGH BURKE (DDG 51) Class Destroyers and an option for one additional installation on a ARLEIGH BURKE (DDG 51) Class Destroyer.

1.2 Location of Work

AIT installation support services shall be performed in shipyards and aboard ships in US Navy ports. The ships and sites listed below are representative of the major locations where performance of the tasking is required.

This is not a complete list; specific locations will be specified in individual Technical Instructions (TIs) when issued:

1.2.1 U.S. Naval Shipyards

1.2.2 U.S. Naval Stations

1.2.3 ARLEIGH BURKE (DDG 51) Class Destroyers

1.2.4 Shore Sites, Depots, Shipyards, and Training Facilities

2.00 Applicable Documents

The following documents are applicable to the tasks described herein and are for use by the contractor in the fulfillment of those tasks. The exact revisions of the documents are not cited in the text of this SOW for the convenience of reference. All of the documents listed herein are assumed to be the latest revision as of the date of award. The Government will provide direction by way of a Technical Instruction (TI) should there be a conflict between the required documents and guidance documents. All applicable tasking, processes, performance, execution, and documentation within this contract shall be in accordance with the most current revision of these documents.

2.1 Government Documents

Document # Title SL720-AA-MAN-030 Navy Modernization Process Management and Operational Manual NAVSEA OD32382 Rev F Grounding and Bonding Equipment Enclosures, Chassis and Cases

Design and Installation SECNAV M-5510.30 Navy Personnel Security Program Manual

Executive Order 13467 Executive Order 13467 HSPD-12 Homeland Security Presidential Directive 12 HSPD-12 United States Office of Personnel Management Memorandum, Final

Credentialing Standards for Issuing Personal Identity Verification Cards NAVSEA 605-2540769 Rev D, Label Plate Standards NAVSEA 4720.11C Shipboard Installations and Modifications Performed by Alteration

Installation Teams (AITs) NAVSEA Technical Publication

T9074-AD-GIB- 010/1688

NAVSEA Technical Publication, Requirements for Fabrication, Welding, and Inspection, T9074-AD-GIB- 010/1688

NAVSEA Technical Specification

9090.310 (Series)

Alterations to Ships Accomplished by AITs

NAVSEA Technical Specification

9090.600 (Series)

NAVSEA Technical Specification

NAVSEAINST 4790.8 (Series) Ships’ Maintenance and Material Management (3-M)

PEOIWSINST 4130.1B PEO IWS Enterprise Configuration Control Process MIL-HDBK Technical Review Manual

PEO IWS – Deputy Commander, Naval Sea Systems Command Warfare Systems Engineering Directorate (NAVSEA 05H) Technical Review Manual (TRM)

PEO IWS Program Plan Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan

PEOIWSINST 4130.1C PEO IWS Enterprise Configuration Control Process NAVSEAINST 5000.8 Naval Systems Command (SYSCOM) Risk Management Policy NAVESEAINST 4130.12B Configuration Management (CM) Policy and Guidance NAVSEAINST 4160.3 Technical Manual Management Program (TMMP) NSWC PHD Instruction 4355.3 (series)

All applicable tasking, processes, performance, execution, and documentation within this contract shall be in accordance with the most current revision of these documents.

SECNAV M-5510.30 Navy Personnel Security Program Manual (Chapter 6, Section 6-6, Paragraphs 2b and 2c

DoD Instruction 8510.01 Risk Management Framework (RMF) for Department of Defense (DoD) Information Technology (IT)

S0005-AA-PRO-010/TMMP NAVSEA Technical Manual Management Program S0300-A7-AEG-010, 020, 030 Aegis Style Guide for Development and Publication of Combat/Weapon

System Technical Manuals OSHA 1910.1200 Ship and Shore support IAW Occupational Safety and Health

Administration (OSHA), Hazardous Material Handling Industry Standard 1910.1200 specifications, standards, and guidelines to support the handling of hazardous material

NAVSEA 04 NAVSEA 04 approval letter for quality procedures to perform installations

NAVSEA (SI) NAVSEA STANDARD ITEM (SI) Current FY

53711-180-8826570 Rev A TEMPALT DDG-51-93762 ODIN FDN MODS & ML

RLAR 93762-DDG106-1188710 93762-DDG106-1188710_CompSTRUCT

53711-505-8826573 Rev A TEMPALT DDG-51-93762 ODIN PIPING MODS & ML

RLAR 93762-DDG106-1188713 93762-DDG106-1188713_Comp_Piping LAR

53711-512-8826574 Rev A TEMPALT DDG-51-93762 ODIN HVAC MODS & ML

RLAR 93762-DDG106-1188712 93762-DDG106-1188712_compHVAC

53711-450-8826571 Rev A TEMPALT DDG-51-93762 ODIN CNSLD ELEC DWG & ML

RLAR 93762-DDG106-1188711 93762-DDG106-1188711_Comp-Elec

53711-450-8826572 Rev A TEMPALT DDG-51-93762 ODIN WIRE CONNECTION LIST

53711-450-8848653 Rev A TEMPALT DDG-51-93762 ODIN CNSLD ELEC DWG and ML

RLAR 93762 DDG111 1191287 RLAR 1191287 ELEC Comp

53711-180-8848652 Rev A ODIN FDN MODS and ML

RLAR 93762/DDG111/1190677 RLAR 93762/DDG111/1190677 COMP Struct

53711-505-8848655 Rev A TEMPALT DDG-51-93762 ODIN PIPING MODS and ML

RLAR 93762 DDG111 1190676 111-93762 CW RLAR 1190676 – Pipe Shipcheck findings

53711-512-8848656 Rev A TEMPALT DDG-51-93762 ODIN HVAC MODS and ML

RLAR 93762-DDG111-1190675 RLAR 93762-DDG111-1190675 COMP HVAC

53711-450-8848654 Rev A TEMPALT DDG-51-93762 ODIN WCL

51221-3-133 Rev A Chg1 HVAC_ODIN-Volumetric Balancing Test

2.2 Joint Chiefs of Staff, Department of Defense, and DoD Services Documents Document # Title Defense Acquisition Guidebook 4.3.3.4.7, https://dag.dau.mil

Production Readiness Reviews (PRR)

DoD 5220.22M Defense Security Service (DSS) National Industrial Security Program Operating manual (NISPOM)

DoDI 4140.67 Department of Defense Instruction (DoDI) 4140.67 DoD Counterfeit Prevention Policy

2.3 Military Standards (MIL-STD)

MIL-STD-777D 802-5959353 Rev BK, , Modified for DDG 51 Class, Schedule of Piping, Valves, Fittings, and Associated Piping Components 6430-AE-TED-010 Piping Devices, Flexible Hose Assemblies 8100-2400-0062 Rev BG Pipe Hangers Rigid Type MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.4 Other Military Documents

MIL-D-23140D Drawings, Installation Control, for Shipboard Electronic Equipment MIL-DTL-31000C Technical Data Packages, Detail Specification

MIL-P-24534A Planned Maintenance System: Development Of Maintenance Requirement Cards, Maintenance Index Pages, and Associated Documentation

51221-3-133 Rev A Chg1 - HVAC_ODIN-Volumetric Balancing Test

2.5 Handbooks

Document # Title MIL-HDBK-61A CM Guidance MIL-HDBK-881A Work Breakdown Structures For Defense Materiel Items

2.6 Non-Government / Commercial Standards

ANSI/ASQC Q9001-2008 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing ASME Y14.24-2012 Types and Applications of Engineering Drawings ASTM 1166-07 (2013) Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities ASTM F1337-10 (2015) Standard Practice For Human Systems Integration Program Requirements For

Ships And Marine Systems, Equipment, And Facilities ISO 9001:2015 Quality Management Systems - Requirements ISO 10007:2003 International Organization for Standards (ISO) Quality Management Guidelines for CM IEEE/EIA-649-1998 Institute of Electrical and Electronics Engineers (IEEE) National Consensus

Standard for CM

3.0 GENERAL REQUIREMENTS

3.1 Security Clearances and Procedures

3.1.1 This document is Unclassified; however, the classification of the work to be performed may require access to secure areas and classified information up to and including Secret per the attached Contract Security Classification Specification, DD Form 254. Security requirements will be identified by order and/or TI. In the event a particular order requires revision, updates or additional security classification guidance, the DD Form 254 will either be revised, or a separate DD Form 254 issued for that order.

3.1.2 In accordance with SECNAV M-5510.30, the Navy Personnel Security Program Manual (Chapter 6, Section 6-6, Paragraphs 2b and 2c), Executive Order 13467 of 30 June 2008, as well as HSPD-12 and United States Office of Personnel Management Memorandum, Final Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-12 dated 31 July 2008, the Contractor shall ensure that all individuals performing work on behalf of the Government have a current, favorably adjudicated background investigation of the appropriate type to determine fitness to perform work on behalf of the Government as a Contractor employee, perform sensitive national security duties, or have access to classified information. A background investigation equivalent to the current Tier requirement and which is still in scope is acceptable.

3.1.3 Contractor Employees who require access to Classified Information will be processed under the terms of the National Industrial Security Program (NISP) in alignment with the work requirements of the contract and Security Requirements on the applicable DD Form 254. Those Contractor employees who do not require access to classified information in performance of this contract, but are assigned to sensitive national security duties, require access to sensitive information, or for other reasons require a fitness or trustworthiness determination, shall be processed for the appropriate background investigation through the NSWC PHD Personnel Security Office for a Non-NISP investigation. Point of contact is the Personnel Security Specialist, (805) 228-7196.

3.1.4 Contractor shall notify NSWC PHD Command Security Manager of any Contractor personnel who have an investigation with an action pending, whose eligibility has been administratively withdrawn or is pending withdrawal, whose interim clearance eligibility has been withdrawn, who have an eligibility of no determination made, or whose Security Clearance Eligibility has been denied or revoked.

3.1.5 The Contractor shall provide a list of personnel and their security clearance levels for all personnel working on this contract. Contractor shall submit Contractor Personnel Roster in accordance with Contract Data Requirements List (CDRL A001).

3.2 Cybersecurity and IT Requirements: Not Applicable

3.3 Safety

3.3.1 The Contractor shall prepare an Emergency Action Plan (EAP) associated to the services performed in this SOW. Contractors storing classified documentation and classified equipment at their facilities in accordance with tasking in this requirement shall develop and maintain an EAP and provide a report in accordance with (CDRL A001).

3.3.2 The Contractor shall prepare a muster report as directed, in accordance with (CDRL A001).

3.4 Environmental Protection and Compliance

3.4.1 The Contractor shall prepare a HAZMAT/HAZWASTE report associated to the services performed in this SOW in accordance with CDRL A010.

3.5 Travel

3.5.1 Continental United States (CONUS) and Outside Continental United States (OCONUS) travel requirements will be directed by technical instruction (TI). The Contractor shall support and may travel to the following locations at a minimum:

• San Diego, CA

• Everett, WA

• Seattle, WA

• Portland, OR

• Pearl Harbor, HI

This list is not all-inclusive. Contractor may be required to travel to other CONUS and OCONUS locations during contract performance.

3.5.2 The Contractor shall provide trip reports in support of the services performed in this SOW in accordance with

CDRL A001.

3.6 Electronic Cost Reporting and Financial Tracking (eCRAFT) System

3.6.1 The Contractor shall upload the Contractor's Funds and Man-hour Expenditure Reports in eCRAFT and submit the Contract Status Report on the same day and for the same timeframe the Contractor submits an invoice into Wide Area Workflow (WAWF). The amounts submitted to eCRAFT and WAWF shall be the same. eCRAFT acceptance/rejection will be indicated by e-mail notification from eCRAFT. Compliance with this requirement is a material requirement of this contract. Failure to comply with this requirement may result in contract termination. Contractor shall submit in accordance with CDRL A003.

3.6.2 In conjunction with the Contracting Officer’s Representative (COR) and Contracting Officer, the Contractor shall assign standard eCRAFT labor categories to each existing proposed and executed labor category on the task order/contract.

3.6.3 eCRAFT reports are uploaded through the eCRAFT System Periodic Report Utility (EPRU). The EPRU spreadsheet and user manual can be obtained at: http://www.navsea.navy.mil/Home/Warfare-Centers/NUWC- Newport/Partnerships/Commercial-Contracts/Information-eCraft-/ under eCRAFT information. The eCRAFT e-mail address for report submission is: ecraft.nuwc.npt.fct@navy.mil. If you have problems uploading reports, please see the Frequently Asked Questions at the site address above.

3.7 Enterprise-wide Contractor Manpower Reporting Application (ECMRA)

3.7.1 The Contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the NSWC PHD CMRA Tool via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications Transmission (D304) and Internet (D322) only;

(5) S, Utilities only;

(6) V, Freight and Shipping only.

3.7.2 The Contractor is required to upload, enter, and complete all required data fields using the following web address:

https://www.ecmra.mil.

3.7.3 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil.

4.0 PROGRAM MANAGEMENT AND CONTROL

The Contractor shall provide program management oversight to ensure all work conducted within this contract is planned and executed in a manner that will achieve all quality, schedule and cost objectives.

4.1 Program Administration

4.1.1 The Contractor shall designate a Program Manager. The Program Manager shall have complete responsibility and authority for the planning, execution, control and reporting of all aspects of the Contractor’s efforts including Subcontractor efforts.

4.1.2 The Contractor shall prepare and submit a Contracting Officer’s Management Report in accordance with CDRL A002.

4.1.3 The Contractor shall prepare and submit a monthly funding report in accordance with CDRL A0003.

4.1.4 The Contractor shall prepare and submit a Closeout Financial Report in accordance with CDRL A0003.

4.1.5 The Contractor shall provide an Integrated Master Schedule (IMS). Contractor shall submit Integrated Program Management Report in accordance with CDRL A009.

5.0 Installation Task Planning and Coordination

5.1 The Contractor shall assist the Government On-Site Installation Coordinator (OSIC) prepare a detailed Installation Plan of Action & Milestone (POA&M) for AIT installations based on site surveys and ship checks conducted with Government Representative, Ship Installation Drawing (SID) reviews, material lead times, and required resources. POA&M shall be delivered in Microsoft project IAW 9090.310 series. POA&M to be delivered 90 days prior to installation and must be consistent with each ships availability milestones. (CDRL A009)

5.1.1 Contractor shall prepare document packages for AIT on-site managers prior to installations and prepare and provide analysis, installation briefs, messages, and reports (CDRL A007).

5.1.2 Contractor shall maintain liaison with the Regional Maintenance and Modernization Coordination Office (RMMCO)/Naval Supervising Activity (NSA) to ensure proper processing of installation data and schedule requirements necessary for the unimpeded check-in processing of AIT.

5.1.3 Contractor shall assist in the SID development and approval process which includes ship-check, system installation plans, configurations, and by working with the Planning Yard and NAVSEA approval offices. The SID development and approval process shall be IAW NAVSEA Technical Specification 9090-600 (series)

5.1.4 Contractor shall prepare and coordinate the distribution of redlined SID packages and AIT completion reports and incorporate redlined drawing packages into final as-built SIDs IAW NAVSEA Technical Specification 9090-310 (series) (Attachment 11) and 9090-600, in accordance with CDRL A006.

5.1.5 Contractor shall determine installation requirements including material, support, and manpower elements by reviewing, updating, and maintaining files for SID, Installation Plans, Installation Requirements Manuals (IRM), AIT Workbook, and other installation and modernization related documentation IAW NAVSEA Technical Specification 9090-310 (series) and PHDNSWC Instruction 4355.3 (series).

5.1.6 Contractor shall perform installation planning and coordinate receipt/delivery of Government Furnished Equipment (GFE), Government Furnished Information (GFI), Government Furnished Material (GFM), and Installing Activity Furnished (IAF) materials to and from waterfront activities.

5.1.7 Contractor shall provide Project Management and System Technical support for Ship Installation Drawings, Installation Requirements, Integrated Master Schedules (IMS), interface control plans, interface management plans, interface requirements, problem resolution, and system/subsystems integration. Drafting of Liasion Action requests (LARs) and Condition Found reports (CFRs) Exact locations and secured space access will be identified at the individual TI specific level.

5.1.8 Contractor shall coordinate schedules for AIT installation team tasking while ensuring there is no negative impact to the ship’s mission and schedule.

6.0 Installation Material and Pre-Fabrication

6.1 Contractor shall manage and provide accountability for all ship/site installation materials.

The contractor shall provide and maintain material visibility, packaging, and shipping for all procured and GFM and/or GFE in the contractor's possession. (CDRL A004)

6.1.1 Contractor shall provide all necessary materials that are identified in the SID package as Installing Activity Furnished (IAF) and all consumable materials related to the installation.

6.1.2 Contractor shall identify item(s) that can be pre-fabricated prior to the shipboard installation timeframe based on the ship check and review of the SID package. Contractor shall perform material pre-fabrication as defined during planning meetings with Government representative to minimize on-site installation time.

6.1.3 Contractor shall prepare Master Materials List (MML) for each SID package provided by the Government.

Identify in the MML the materials that are GFM, GFE, or Installing Activity Furnished (IAF). For those that are GFM and GFE, specify the required ship installation need date so the Government can make arrangements to ship to the contractor for inventory and pre-fabrication prior to shipboard installation. Contractor shall procure installation materials identified as IAF in each developed MML. Long lead items shall be ordered within 30 days of receipt of SID package. Non-long lead items shall be purchased and available prior to required installation start date. Contractor shall inform GOVT when material lead time will not meet installation milestones. (CDRL A004)

6.1.4 Contractor shall produce pre-fabricated materials identified as IAF required by each SID package. Pre-fabricated materials include, but are not limited to: equipment foundations, sway braces, cables and various structural items. The contractor shall ensure all pre-fabricated material is compliant with the applicable SID package.

7.0 Installation Execution, Reporting and AIT Close-out

7.1 Installation Execution. Installation of TMPALT 93672, a low-power laser prototype system, for dazzling of Unmanned Aerial System (UAS) mounted Electro Optical/ Infrared (EO/IR) sensors, and the execution of structural, piping, HVAC, Electrical and Wire connection list ship installation drawings. Installation consists of a topside gimbal unit on a main foundation with majority of other work concentrated below decks in the weapons workshop requiring phased work schedules in a small working area.

7.1.1 Contractor shall perform industrial services, and project support for weapon systems and sensors, including Combat System Support Equipment (CSSE). CSSE is defined as all systems that interface (electrically and mechanically) with the shipboard and land based combat systems. These interfacing systems include communications systems, sensors, weapons, chilled water, dry air, power systems, and Local Area Networks/Wide Area Networks (LAN/WAN).

7.21 Contractor shall perform industrial services and project support for AIT installation/alteration/decommission tasking, to include all systems that interface (electrically and mechanically) with the shipboard and land based combat systems. These interfacing systems include, but are not limited to communications systems, sensors, weapons, chilled water, dry air, power systems, and LAN/WANs. All tasking shall be in accordance with Ship Alterations (SHIPALTs) and Ship Change Documents (SCDs) provided for each task. These services shall be performed IAW GFI provided with individual Technical Instructions (TI).

The ability to install per the Ship Installation Drawings (SIDS) for Electrical, HVAC, Structural, Piping. The contractor shall have journeyman level welders, pipefitters, electricians. The contractor shall have appropriate quality assurance (QA) personnel as well as program Management personnel to monitor and provide status on job progress. The contractor shall procure all installing activity furnished material in the SIDS. The contractor shall dispose of cooling water HAZMAT. The contractor shall install scaffolding as required. The contractor shall perform gas freeing of spaces prior to commencement of hot work which requires a certified Marine Chemist.

7.3 Contractor shall perform Pre-Installation Checkout (PICO) for equipment that will be disturbed.

7.3.1 Contractor shall prepare a PICO rep or t to identify equipment configuration deficiencies and equipment placement issues (CDRL A008).

7.3.2 Contractor shall prepare a Quality Deficiency Report (QDR) to identify equipment discrepancies (CDRL A005).

7.3.3 Contractor shall repair, all discrepancies except for pre-existing discrepancies identified in QDR (CDRL A005).

7.4 Contractor shall perform Naval Ship equipment alterations, modernizations, installations, repair, and technical support.

7.5 Contractor shall assist the Government On-Site Installation Coordinator (OSIC) with presenting an In-Brief to Ships Force and maintain installation coordination with cognizant government offices.

7.6 Contractor shall perform Material Condition Assessments and correct deficiencies necessary to meet ship schedules (pier-side maintenance services), and resolve equipment/system problems at land-based sites.

7.7 Contractor shall prepare an AIT workbook at completion of each task (CDRL A007).

8.0 DATA DELIVERABLES CDRL

The Contractor shall provide deliverables as described in SOW and CDRLs. Format, delivery schedule, and detailed reporting requirements for deliverables are outlined in the CDRLs and associated Data Item Descriptions (DIDs).

CDRL Title of Data Item Subtitle DID SOW

Paragraph

A001 STATUS REPORT SITREP DI-MGMT-

80368A

3.1.5, 3.3.1, 3.3.2, 3.5.2

A002 REVISIONS TO EXISTING GOVERNMENT

DOCUMENTS

NSWC PHD

CONTRACTOR

PERSONNEL

ROSTER

DI-ADMN-

80925A

4.1.2

A003 FUNDS AND MAN-HOURS EXPENDITURE

REPORT

STATUS REPORT DI-FNCL-

80331A

3.6.1

A004 OUTFITTING MATERIAL STATUS REPORT MATERIALS STATUS DI-ILSS-80948 6.1, 6.1.3

A005 QUALITY DEFICIENCY REPORT CONDITION DEFICIENCY

REPORT

DI-QCIC-80736 7.3.2, 7.3.3

A006 ENGINEERING DOCUMENTATION PRODUCT

DRAWINGS, MODIFIED

REDLINES DI-DRPR-

81681

5.1.4

A007 ALTERATION INSTALLATION TEAM QUALITY

ASSURANCE

AIT WORKBOOK DI-QCIC-81870 5.1.1, 7.7

A008 FAILURE REPORTING, ANALYSIS AND

CORRECTIVE ACTION TAKEN

PICO MIL-HDBK-

7.3.1

A009 INTEGRATED MASTER SCHEDULE MICROSOFT PROJECT DI-MGMT-

81650

4.1.6, 5.1

A010 TECHNICAL REPORT - STUDY/SERVICES HAZMAT/HAZWASTE

REPORT

DI-MISC-

80508B

3.4.1

List of Acronyms and Abbreviations The following acronyms appear in this requirement or may be encountered in this solicitation or in the performance of this requirement. This is not an exhaustive list. Acronyms that may not be defined in the body of the requirement are defined here. Not all acronyms and abbreviations shown below may be used in this

SOW.

AIT - Alteration Installation Team CDRL - Contract Data Requirement List COR - Contracting Officer Representative DoD - Department of Defense DoN - Department of the Navy GFE - Government Furnished Equipment GFI - Government Furnished Information GFM - Government Furnished Material HAZMAT - Hazardous Materials IAF - Installing Activity Furnished INCO - Installation Checkout ISEA - In-Service Engineering Agent MML - Master Material List NAVSEA - Naval Sea Systems Command NSA - Naval Supervising Activity NSSMS - NATO SEASPARROW Surface Missile System NSWC PHD - Naval Surface Warfare Center, Port Hueneme Division OJT - On the Job Training OSIC - On Site Installation Coordinator PICO - Pre-Installation Checkout PMS - Planned Maintenance System POA&M - Plan of Action & Milestone QA - Quality Assurance QMS - Quality Management System RAM - Rolling Airframe Missile RMMCO - Regional Maintenance and Modernization Coordination Office SDTS - Self Defense Test Ship SI - Standard Item SID - Ship Installation Drawing SOVT - System Operational Verification Test SSDS - Ship Self Defense System TA - Technical Advisor TI - Technical Instruction