FY19-16667 Sole Source Justification_Redacted.pdf
PDF 356 KB Posted
- Attached to
- FEI-Zyfer Gsync
- Solicitation number
- N63394-19-T-0199
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
s Environment (TSCE) elines is NSWC Port baselines in a
13 October 2017 (Rev 1)
OTHER THAN FULL AND OPEN COMPETITION JUSTIFICATION FOR SIMPLIFIED
ACQUISITION PROCEDURES (SAP)(UNDER $250K)
PMD ID Number:
Department:
Type of Justification:
Company Name/Brand Name:
Company Address (if sole source):
Company POC and Phone Number (if sole source):
Description of Product, Supplies or Services required to meet the Agencies needs:
The hardware reque baselines used in the
Hueneme Division (P t
PART NUMBER
ted matches the Total Ship
Fleet today. The In-Service Engineering Agent (ISEA) f
HD). NSWC PHD is procuring parts and will assemble t y lab at NSWC PHD.
DESCRIPTION
Computing or the bas he various
QTY
391012256 ASSEMBLY, GSYNC, MK V (GTF- C/A -OCXO) 2
Statutory Authority Permitting Other than Full and Open Competition: FAR 13.106-1(b)(1)
FY19-16667
L-Department
Sole Source
FEI-Zyfer, Inc.
7321 Lincoln Way
Garden Grove, CA 92841
✔ Identification of the Justification Rationale: The material or service must be compatible in all aspects (form, fit, and function) with existing systems presently installed.
A patent, copyright, proprietary data, or licensing agreement limits competition.
These are "direct replacements" parts/ components for existing equipment.
Urgency (rare)
Identification of the Justification Rationale Explained:
**If using form, fit, and function, describe the current equipment and how the new item/service must coordinate or interface.
**If using patent, copyright, proprietary data, describe the proprietary data.
**If using direct replacement, describe this below.
**If using urgency, describe when you became aware of the requirement and the impact of not having this complete by this time frame.
The hardware requested matches the TSCE baselines used in the Fleet today and is only available through the manufacturer. The In-Service Engineering Agent (ISEA) for the baselines is NSWC Port Hueneme Division
(PHD). NSWC PHD is procuring parts and will assemble the various baselines in the lab at NSWC PHD. The ISEA's design specifies the requested brand for compatibility with the
Fleet. The hardware being procured is required to match the installed shipboard configuration to properly support engineering investigations, documentation development/validation efforts, and direct fleet support efforts. All current software and documentation is built around the specific hardware. The cost to re-engineer to accept an alternate, as well as, the cost to re-write associated support documentation (e.g. technical manuals, drawings) would be cost prohibitive. Additionally, the program could not use these items as battle ready spares if they do not match the installed fleet configuration.
Specific Characteristics of the Item or Service Required that Limit the Availability to a Sole Source or Brand Name:
**This is the most important section. Explain in detail why this company or brand are the only ones that can meet the requirement.
The hardware requested is currently used on platforms and is only available through the manufacturer. The requested hardware for purchase for use in the
Lab must be the exact same equipment as defined in Allowance Parts Lists (APLs) as they may be required for use as “battle ready spares” whereupon they will be removed and re-installed in U.S. Navy LCS platforms to resolve
Casualty Reports (CASREPs) and Automated Work Numbers (AWNs). Only equipment identified on APLs may be allowed for installation on U.S. Navy ships. Similar products by any other manufacturer might not meet form, fit and function requirements and may have unknown compatibility issues.
The requested FEI-Zyfer Gsync module is an integral piece of equipment used by all networked systems aboard
Independence-Class platforms and is only available through the manufacturer as shown through market research. Synchronous network time (to the millisecond) is provided by the FEI-Zyfer Gsync module to multiple systems on the ship which ensures that all systems are synchronized to prevent timing and communication issues.
Ship systems have been programmed to work specifically with this system and using a similar product by any other manufacturer is not acceptable as the FEI-Zyfer Gsync may be required for use as a “battle ready spare.”
Procurement of the FEI-Zyfer Gsync module will ensure that testing, procedural development, and distance support can be conducted in the LWEC Lab using has the same equipment on board ships. Procurement of the shipboard representative FEI-Zyfer Gsync module will also ensure that the ISEA will be able to accurately recreate the ship’s network system environment, recreate any hardware problems or anomalies and troubleshoot these issues at the
Lab.
Market Research Conducted:
This item must be the exact item identified by the In-Service Engineering Agent (ISEAs) at NSWC Port
Hueneme Division. These items are described in current Allowance Parts Lists (APLs), and hardware not identified on the APLs cannot be installed on platforms.
The item can only be purchased from the identified sole source, FEI-Zyfer, Inc.
Our market researched was conducted using the following Government Sources: Haystack, AbilityOne, UNICOR, FedMall and GSA Advantage. None of those sources had the hardware required.
The following item was found to be available from the manufacturer, FEI-Zyfer:
PART NUMBER DESCRIPTION
391012256 ASSEMBLY, GSYNC, MK V (GTF- C/A -OCXO)
Statement of Actions, if any to Remove Barriers to Competition in the Future:
Any Other Facts Supporting Justification:
Technical Requirement Certification:
I certify that the facts and representations under my cognizance, which are included in this justification and which form a basis for this justification, are complete and accurate.
Technical/Requirements Cognizance Signature:
Signature Print Name, Title and Code Phone No. Date
For the reasons set forth in the justification rationale, NSWC PHD Contracts Office has no plans at this time to compete further contracts for the types of supplies/services covered by this document. If another potential source emerges, (contracting activity) will assess whether competition for future requirements is feasible.
Contracting Officer:
I certify that this justification is accurate and complete to the best of my knowledge and belief.
Contracting Officer Signature: SHANER.KEITH.A.12317
06379
Digitally signed by SHANER.KEITH.A.1231706379 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USN, cn=SHANER.KEITH.A.1231706379 Date: 2019.09.01 11:28:05 -07'00'
Signature Print Name, Title and Code Phone No. Date
File details come from the government source that posted it. Updated .