15-R-3000_ATT_M_-_Off_hire.doc

DOC document 49 KB Posted

Attached to
U. S. Army Ammo Containership Time Charter Federal contract opportunity
Solicitation number
N62387-15-R-3000
Issued by
Department of the Navy Military Sealift Command

About this file

15-3000 Attachment M

View the file

Other files for this federal contract opportunity

Other files attached to U. S. Army Ammo Containership Time Charter, newest first.
File Type Posted
15-3000_AMEND_7.pdf PDF
15-3000_CBAs.pdf PDF
15-3000_AMEND_6.pdf PDF
15-R-3000_ATT_B-1_-_Pricing_Summary_Amend_6.xls XLS spreadsheet
15-3000_AMEND_5.pdf PDF
15-R-3000_ATT_B-1_-_Pricing_Summary_Amend_5.xls XLS spreadsheet
15-3000_Q A_Part_Two.pdf PDF
15-3000_Amend_4.pdf PDF
15-3000_Att_H.pdf PDF
15-3000_Amend_3.pdf PDF
15-3000_AMEND_2.pdf PDF
15-3000_AMEND_1.pdf PDF
15-3000_Q_ _A_Part_One.pdf PDF
15-R-3000_ATT_B_-_Basic_Pricing_Data_Amend_1.xls XLS spreadsheet
15-R-3000_ATT_G_-_FCL_DD254.docx DOCX document
15-R-3000_ATT_M_-_Off_hire.doc DOC document
15-R-3000_ATT_L_-_SSS_Requirements.doc DOC document
15-R-3000_ATT_U_-_MECS.doc DOC document
15-R-3000_ATT_I_-_SF_LLL.pdf PDF
15-3000_RFP.pdf PDF
15-R-3000_ATT_O.doc DOC document
15-R-3000_ATT_V_-_MECSP_Worksheet.doc DOC document
15-R-3000_ATT_A_-_Scheduled_GFP.xlsx XLSX spreadsheet
15-R-3000_ATT_N_-_COMSCINST_3121.9_SERIES.doc DOC document
15-R-3000_ATT_J_-_ATFP _CBRD _and_Training_Requirements.doc DOC document
15-R-3000_ATT_K_-_Specs_for_CBR-D_Decon_Station.doc DOC document
15-R-3000_ATT_G_-_FCL_DD254.docx DOCX document
15-R-3000_ATT_B_-_Basic_Pricing_Data.xls XLS spreadsheet
15-R-3000_ATT_P_-_Cargo_List.docx DOCX document
15-R-3000_ATT_E_-_Vessel_Characteristics_Fillable_sheet.docx DOCX document
15-R-3000_ATT_H_Wage_Determination.pdf PDF
15-R-3000_ATT_T_-_Decon_Station_DWG.pdf PDF
15-R-3000_ATT_C_-_Crew_Complement_Form.xls XLS spreadsheet
15-R-3000_ATT_G_-_DD254.pdf PDF
15-R-3000_ATT_B-1_-_Pricing_Summary.xls XLS spreadsheet
15-R-3000_ATT_S_-_CDRLs.doc DOC document
15-3000_SECTION_C_DRAFT.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N62387-15-R-3000 ATTACHMENT M: OFF-HIRE GUIDELINES

The following are guidelines that may be used to determine of off-hire charges against the Contractor for specific instances of failure to comply with requirements of this charter party. These standards are guidelines only and are not construed as binding and inflexible provisions of the charter party. When determining off-hire, the Government may consider difficulties encountered by the Contractor in transporting repair and spare parts, personnel, and service representatives which are attributable to the Government. The Contracting Officer at all times reserves the right to make off-hire determinations under the specific facts and circumstances of each incident at issue. If, in any particular instance, these standards operate to impose inequitable results on either the Government or the Contractor, the Contracting Officer may make appropriate adjustments to the off-hire amount suggested by the guidelines so as to comport with applicable Admiralty Law and Custom of the Trade practices.

Definitions:

OOC = Out of Commission

Mission Degrading Casualty (as applicable)
Nominal hire rate deduction
Unable to Sail for any reason, whether ordered to do so or not.
100% off hire
Inability to maintain Warranted speed whether ordered to do so or not.
Deduction equal to percent difference between actual speed and Warranted Speed (= 1-(Actual speed/Warranted Speed))
Cargo hold temp/humidity out of tolerance
Deduction equal to percentage of cargo affected (TEU or other applicable unit of measure) (= TEU in affected hold(s)/total TEU required to be under AC/DH)
USCG/Other Authority Restricts Cargo Operations whether moving cargo or not.
Deduction equal to percent difference between:

· percent of cargo holds affected (= affected holds/total holds required) or

· percent cargo gear affected (=affected cargo gear/total cargo gear required) Vessel operations during the event determine calculation used.

Stern Ramp OOC (not able to discharge cargo whether ordered to do so or not)
100% off hire
Stern Ramp OOC (able to discharge cargo via other means whether ordered to do so or not)
Deduction equal to percent difference between:

· percent of cargo holds affected (= affected holds/total holds required) or

· percent cargo gear affected (=affected cargo gear/total cargo gear required) Vessel operations during the event determine calculation used.

LASH Crane OOC whether moving cargo or not
Deduction equal to percent difference between:

· percent of cargo holds affected (= affected holds/total holds required) or

· percent cargo gear affected (=affected cargo gear/total cargo gear required) Vessel operations during the event determine calculation used.

Container Crane OOC whether moving cargo or not
Deduction equal to percent difference between:

· percent of cargo holds affected (= affected holds/total holds required) or

· percent cargo gear affected (=affected cargo gear/total cargo gear required) Vessel operations during the event determine calculation used.

General Cranes/Booms OOC whether moving cargo or not
Deduction equal to percent difference between:

· percent of cargo holds affected (= affected holds/total holds required) or

· percent cargo gear affected (=affected cargo gear/total cargo gear required) Vessel operations during the event determine calculation used.

Cargo Elevators OOC whether moving cargo or not
Deduction equal to percent difference between:

· percent of cargo holds affected (= affected holds/total holds required) or

· percent cargo gear affected (=affected cargo gear/total cargo gear required) Vessel operations during the event determine calculation used.

Note:

For actual issues of lost time (VICE readiness issues), actual time lost to be used to determine off-hire.

�We need to discuss this, as it appears to be in conflict with Section H?

�Section H is part of the Pro Forma and will not be changed at this point.

�What does this mean? Is it consistent with H-6 saying, “Failure of the parties to agree upon the extent of the proportional decrease in hire shall be a dispute under the clause entitled "Disputes" incorporated herein by reference in Section I below. Nothing in this clause shall limit the rights of the Charterer to place the Vessel off-hire pursuant to Section H-9 below.”

�Not sure what this means. Propose deleting or modifying if this has to do with warranted speed trials.

�If we keep this Attachment, we shuld clearly show the calculation for percents less than 100%. Foe example, how do you calculate “% cargo unable to work (MT)”?

N62387-15-R-3000 ATTACHMENT M