SOR_-_ANSYS__Final.docx
DOCX document 35 KB Posted
- Solicitation number
- N6227118Q1031
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_N6227117Q1031.docx | DOCX document | |
| Brand_Name_Justification_-_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Requirements ANSYS Academic Multiphysics Software
ITACS
Naval Postgraduate School
1.0 Background/Introduction:
ANSYS Academic engineering simulation software is used by thousands of universities globally for undergraduate students to learn physics principles, for researchers to solve complex engineering problems and for postgraduate students to produce data for their master’s theses or doctoral dissertations.
The features provided by ANSYS benefit NPS graduate education, particularly Master's Degree thesis work where there is only 5-9 months available for research.
2.0 Minimal Technical Requirements/Salient Characteristics:
The following ANSYS-brand only software:
| Item# |
| MFG Name |
| MFG Part# |
| Description |
| Qty |
| U/I |
| Unit Price |
| Ext Price |
| 1 |
| ANSYS |
| n/a |
| ANSYS Academic Multiphysics Campus Solution (50/500) |
Period of Performance: 01/05/2018 through 01/04/2019
| 1 |
| EA |
| 2 |
| ANSYS |
| n/a |
| Option One: |
ANSYS Academic Multiphysics Campus Solution (50/500)
Period of Performance: 01/05/2019 through 01/04/2020
| 1 |
| EA |
| 3 |
| ANSYS |
| n/a |
| Option Two: |
ANSYS Academic Multiphysics Campus Solution (50/500)
Period of Performance: 01/05/2020 through 01/04/2021
| 1 |
| EA |
| 4 |
| ANSYS |
| n/a |
| Option Three: |
ANSYS Academic Multiphysics Campus Solution (50/500)
Period of Performance: 01/05/2021 through 01/04/2022
| 1 |
| EA |
| 5 |
| ANSYS |
| n/a |
| Option Four: |
ANSYS Academic Multiphysics Campus Solution (50/500)
Period of Performance: 01/05/2022 through 01/04/2023
| 1 |
| EA |
POP: Base Period, 01/05/18 - 01/04/19 Option Period 1, 01/05/19 - 01/04/20 Option Period 2, 01/05/20 - 01/04/21 Option Period 3, 01/05/21 - 01/04/22 Option Period 4, 01/05/22 - 01/04/23 Office of Contracting and Logistics Management Revised 05 Mar 2015
File details come from the government source that posted it.