This statement of work outlines annual maintenance requirements for air compressors, air dryers, control panels, and carbon monoxide monitors at various Navy facilities. Services include inspection, testing, preventative maintenance, and repairs to Mako/Reavell and Kaeser air compressors, Zeks and Kaeser air dryers, Siemens and ATL control panels, NYAD and Bauer carbon monoxide monitors, and Vaisala moisture monitors. Maintenance is required for equipment located in buildings 300, 321, and 331 at the Navy Experimental Diving Unit in Panama City Beach, Florida over a five year base period and option years. The selected contractor will perform all maintenance in accordance with manufacturer specifications and provide inspection and maintenance reports.

View the file

Other files

File Type Posted
C12 - Service Clauses.docx DOCX document
B8 - NEDU APS Annual Maintenance SSJ Redacted.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

For Annual Maintenance Services of Air Compressors, Air Dryers, Control Panels, and CO monitors at

NAVY EXPERIMENTAL DIVING UNIT (NEDU)

25 July 2023

1.0 SCOPE

This Statement of Work (SOW) specifies the requirement for the maintenance services required for air compressors, air dryers, control panels, Carbon Monoxide (CO) monitors, and moisture monitors.

2.0 APPLICABLE DOCUMENTS

The following documents, of the exact issue shown, form a part of this SOW to the extent specified herein. In the event of conflict between the documents referenced and the contents of this SOW, the SOW shall take precedence. Second tier and lower references, (i.e., those referenced in the primary references) shall be used for guidance only.

2.1 Military Standards

2.1.1 In accordance with the Navy Preventative Maintenance System (PMS) Card program, all high-pressure Diver’s air compressors shall have the oil and oil filter changed annually or every 200 hours of operation.

2.2 Military Specifications

2.2.1 None.

2.3 Commercial Specifications

2.3.1 In accordance with equipment manufacturer service manuals.

3.0 REQUIREMENTS

3.1 The maintenance requirement calls for a base year plus four option years.

3.1.1 Base CLIN 0001:23 Aug 2023 through 22 Aug 2024
3.1.2 Option 1:23 Aug 2024 through 22 Aug 2025
3.1.3 Option 2:23 Aug 2025 through 22 Aug 2026
3.1.4 Option 3:23 Aug 2026 through 22 Aug 2027
3.1.5 Option 4:23 Aug 2027 through 22 Aug 2028

3.2 Annual maintenance of two (2) Mako/Reavell high pressure 5437 (HP) compressor (S/N: H22861001, S/N: H22861002) packages in Building 300. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.2.1 Inspect and replace inlet filter.

3.2.2 Inspect oil level.

3.2.3 Inspect motor and motor drive coupling.

3.2.4 Inspect all valves: 1st, 2nd, 3rd, and 4th and replace O-ring software.

3.2.5 Inspect burst disc.

3.2.6 Remove crankcase doors, replace joints, and inspect crankshaft oil seal.

3.2.7 Inspect pressure gauges.

3.2.8 Inspect safety valves.

3.2.9 Inspect pressure switch(es).

3.2.10 Inspect water flow in gallons per minute (GPM) and valve controls.

3.2.11 Inspect condensate drain and muffler/reservoir container(s).

3.2.12 Test automatic drain and load assembly.

3.2.13 Take oil samples, analyze, and report findings.

3.2.14 Inspect control panels and ensure wire and associated ancillary components are secure.

3.2.15 Test FLA of each principal driver to ensure operational parameters are adhered.

3.2.16 Perform an operational test of each unit to determine:

3.2.16.1 Interstage pressures adhere to manufacturer’s parameters.

3.2.16.2 Pressure switch shutoff limits.

3.2.16.3 Water temperature delta (ΔT) across air compressor package.

3.2.17 Additional maintenance due during Base CLIN 0001 Service:

3.2.17.1 Replace 4th Stage Valve

3.2.17.2 Inspect and Clean 4th Stage Valve

3.2.17.3 Inspect 3rd Stage Liner

3.2.17.4 Clean and Inspect Suction and Discharge Valves

3.2.18 Additional maintenance due during Option 4 Service:

3.2.18.1 Clean Sump

3.2.18.2 Replace 4th Stage Valve

3.2.18.3 Inspect 4th Stage Liner

3.2.18.4 Replace 4th Stage piston/ring assembly.

3.2.18.5 Inspect and Clean 3rd Stage Valve

3.2.18.6 Inspect 3rd Stage Liner

3.2.18.7 Clean and Inspect Suction and Discharge Valves

3.3 Annual maintenance of two (2) Siemens Soft Start Control Panels (S/N: CG391784, S/N: CG 391779) to include Programmable Logic Controls (PLCs), Building 300. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.3.1 Inspect the Siemens Soft Start Control Panel(s)/Across the Line (ATL) Start Panel. Ensure wire and associated ancillary components are secure.

3.3.2 Test full load amps (FLA) of each principal driver to ensure operational parameters are adhered.

3.3.3 Test PLCs’ logic parameters meet required compressor demands for controls and operational requirements to ensure logic limits as applied to the compressor(s) operation and duty cycle is maintained.

3.4 Annual maintenance of two (2) high pressure (HP) Zeks Refrigerated Cycling Air Dryers (SN: 332677-1, SN: 332677-2) in Building 300, and one HP Zeks Refrigerated Cycling Air Dryer (S/N: 547814) in Building 321. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.4.1 Inspect dryers’ overall condition for corrosion.

3.4.2 Inspect and operational test of dryers to determine suction pressure is operating at manufacturer’s required parameters for nominal dew point.

3.4.3 Inspect condenser coil and refrigerant level. If refrigerant is needed, the contractor shall inform the technical point of contact by providing a quote for the estimate for evaluation per paragraph 3.13.

3.4.4 Inspect electrical enclosure for corrosion.

3.4.5 Conduct an operational test for condensate drain and system condition.

3.5 Annual maintenance of NYAD Carbon Monoxide (CO) monitor (S/N: AW 136603), Building 300. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.5.1 Inspect CO readings.

3.5.2 Inspect electrical enclosure.

3.5.3 Inspect air control regulation components.

3.5.4 Inspect electrical enclosure for corrosion.

3.5.5 Conduct calibration verification.

3.6 Annual maintenance of two Kaeser SK20 LP Compressors (SN: 1259, SN: 1235), one (1) low pressure (LP) Kaeser refrigerated dryer TC-31 (S/N: 1103), two Nano and two Kaeser F26KC inline filters in Building 300. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.6.1 Inspect and replace Air Filter, Cabinet Filter and Prefilter element(s).

3.6.2 Inspect compressor lubricant in compressor package.

3.6.3 Replace Oil filter and oil.

3.6.4 Inspect main driver motor for compressors.

3.6.5 Check belt tension and condition

3.6.6 Start-up, operational run. Check proper operation of systems.

3.6.7 Inspect air/oil lines for leaks.

3.6.8 Inspect electrical panels/enclosures.

3.6.9 Inspect start/stop operation pressure.

3.6.10 Take/record main driver motor (each unit) FLA to confirm driver is operating at manufacturer’s parameters.

3.6.11 Conduct an operational test for condensate drain and system condition.

3.6.12 Inspect dryers’ overall condition for corrosion.

3.6.13 Inspect and operational test of dryer to determine suction pressure is operating at manufacturer’s required parameters for nominal dew point.

3.6.14 Inspect condenser coil and refrigerant level. If refrigerant is needed, the contractor shall inform the technical point of contact by providing a quote for the estimate for evaluation per paragraph 3.13.

3.6.15 Replace two Nano Inline Filter elements.

3.6.16 Additional maintenance due during Base CLIN 0001 and Option 4 Service:

3.6.16.1 Replace Combined Auxiliary Vent Valve (CAVV) Repair Kit.

3.6.16.2 Replace Separator.

3.6.16.3 Replace belt.

3.6.17 Additional maintenance due during Option 1 and Option 3 Service:

3.6.17.1 Replace CAVV Maintenance Kit.

3.6.17.2 Replace F26KC, SK20 and TC31 drain service modules.

3.6.17.3 Drain Service Module.

3.6.18 Additional maintenance due during Option 2 Service:

3.6.18.1 Replace CAVV Repair Kit.

3.6.18.2 Replace Separator.

3.7 Annual maintenance of one Kaeser SK20 LP compressor (SN: 1060), one Kaeser refrigerated dryer TC-31 (SN:1116), KCF100 condensate collector and F26KC inline filter in Building 331. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.7.1 Inspect and replace Air Filter, Cabinet Filter and Prefilter element(s).

3.7.2 Inspect compressor lubricant in compressor package.

3.7.3 Replace Oil filter and oil.

3.7.4 Inspect main driver motor compressor.

3.7.5 Check belt tension and condition

3.7.6 Start-up, operational run. Check proper operation of systems.

3.7.7 Inspect air/oil lines for leaks.

3.7.8 Inspect electrical panel.

3.7.9 Inspect start/stop operation pressure.

3.7.10 Take/record main driver motor (each unit) FLA to confirm driver is operating at manufacturer’s parameters.

3.7.11 Conduct an operational test for condensate drain and system condition.

3.7.12 Inspect dryers’ overall condition for corrosion.

3.7.13 Inspect and operational test of dryer to determine suction pressure is operating at manufacturer’s required parameters for nominal dew point.

3.7.14 Inspect condenser coil and refrigerant level. If refrigerant is needed, the contractor shall inform the technical point of contact by providing a quote for the estimate for evaluation under per paragraph 3.13.

3.7.15 Additional maintenance due during Base CLIN 0001 Service:

3.7.15.1 Replace F26KC drain service module.

3.7.15.2 Replace Separator.

3.7.16 Additional maintenance due during Option 1 Service:

3.7.16.1 Replace CAVV Maintenance Kit.

3.7.16.2 Replace SK and TC31 Drain Service Modules.

3.7.16.3 Replace KCF100 cartridge.

3.7.17 Additional maintenance due during Option 2 Service:

3.7.17.1 Replace CAVV Repair Kit.

3.7.17.2 Replace drive belt.

3.7.17.3 Replace F26KC drain service module.

3.7.17.4 Replace CAVV Repair Kit.

3.7.17.5 Replace Separator.

3.7.18 Additional maintenance due during Option 3 Service:

3.7.18.1 Replace CAVV Maintenance Kit.

3.7.18.2 Replace SK and TC31 Drain Service Modules.

3.7.19 Additional maintenance due during Option 4 Service:

3.7.19.1 Replace CAVV Repair Kit.

3.7.19.2 Replace F26KC drain service module.

3.7.19.3 Replace Separator.

3.7.19.4 Replace KCF100 cartridge.

3.7.19.5 Replace plastic pipes and hose lines.

3.8 Annual maintenance of one Kaeser SK20T LP air compressor (SN: 1521) in Building 321. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.8.1 Inspect and replace Air Filter, Cabinet Filter and Prefilter element(s).

3.8.2 Inspect compressor lubricant on compressor package.

3.8.3 Replace Oil filter and oil.

3.8.4 Inspect main driver motor for compressor.

3.8.5 Check belt tension and condition

3.8.6 Start-up, operational run. Check proper operation of systems.

3.8.7 Inspect air/oil lines for leaks.

3.8.8 Inspect electrical panel.

3.8.9 Inspect start/stop operation pressure.

3.8.10 Take/record main driver motor (each unit) FLA to confirm driver is operating at manufacturer’s parameters.

3.8.11 Inspect/Clean refrigerated LP air dryer and condenser coil.

3.8.12 Conduct an operational test for condensate drain and system condition.

3.8.13 Additional maintenance due during Option 1 Service:

3.8.13.1 Replace CAVV Maintenance Kit.

3.8.13.2 Replace F26KE element and drain service module.

3.8.14 Additional maintenance due during Option 2 and Option 4 Service:

3.8.14.1 Replace CAVV Repair Kit.

3.8.14.2 Replace separator.

3.8.14.3 Replace Dryer drain service module.

3.8.15 Additional maintenance due during Option 3 Service:

3.8.15.1 Replace belt.

3.8.15.2 Replace CAVV Maintenance Kit.

3.8.15.3 Replace F26KE element and drain service module.

3.9 Annual maintenance of two (2) Mako/Reavell high pressure 5437 (HP) compressor (S/N: H25835001, S/N: H25834001) packages, Building 321. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.9.1 Inspect and replace inlet filter.

3.9.2 Inspect oil level.

3.9.3 Inspect motor and motor drive coupling.

3.9.4 Inspect all valves: 1st, 2nd, 3rd, and 4th and replace O-ring software.

3.9.5 Inspect burst disc.

3.9.6 Inspect crankshaft oil seal.

3.9.7 Inspect pressure gauges.

3.9.8 Inspect safety valves.

3.9.9 Inspect pressure switch(es).

3.9.10 Inspect water flow in gallons per minute (GPM) and valve controls.

3.9.11 Inspect condensate drain and muffler/reservoir container(s).

3.9.12 Test automatic drain and load assembly.

3.9.13 Take oil samples, analyze, and report findings.

3.9.14 Inspect control panels and ensure wire and associated ancillary components are secure.

3.9.15 Test FLA of each principal driver to ensure operational parameters are adhered.

3.9.16 Perform an operational test of each unit to determine:

3.9.16.1 Interstage pressures adhere to manufacturer’s parameters.

3.9.16.2 Pressure switch shutoff limits.

3.9.16.3 Water temperature delta (ΔT) across air compressor package.

3.9.17 Additional maintenance due during Option 2 Service:

3.9.17.1 Clean and Inspect Suction and Discharge Valves (SN: H25834001)

3.9.18 Additional maintenance due during Option 4 Service:

3.9.18.1 Replace 4th Stage Valve

3.9.18.2 Inspect and Clean 4th Stage Valve

3.9.18.3 Inspect 3rd Stage Liner

3.9.18.4 Clean and Inspect Suction and Discharge Valves (SN: H25835001)

3.10 Annual maintenance of Bauer MNR-0029 CO Monitor, (S/N: 131015332), Building 321. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.10.1 Inspect CO readings.

3.10.2 Inspect electrical enclosure.

3.10.3 Inspect air control regulation components.

3.10.4 Inspect electrical enclosure for corrosion.

3.10.5 Conduct calibration verification.

3.11 Annual maintenance of Vaisala Indigo 520 moisture monitor, Building 321. The contractor shall perform all maintenance in accordance with manufacturer’s specifications, to include but is not limited to the following:

3.11.1 Inspect moisture readings.

3.11.2 Inspect electrical enclosure.

3.11.3 Inspect air control regulation components.

3.11.4 Inspect electrical enclosure for corrosion.

3.11.5 Replace probe filter as required.

3.12 Other details.

3.12.1 The Government point of contact (POC) will be provided after the contract award.

3.12.2 The POC will notify the Contractor of any issues or deficiencies and the Contractor shall correct the issues or deficiencies within one week of notification. Delays in remedying any deficiencies noted to the Contractor by the POC will not be chargeable days for transportation or labor to the Government.

3.12.3 Contractor shall provide all tools, e.g., torque wrench, “A” frame for removal of compression head, and ancillary items as required to properly perform services.

3.13 Over & Above.

Option for emergency or non-scheduled needed repairs to service any of the units included in the contract. The Contractor shall provide 24/7 365 days support to receive service repair requests. Each request shall be responded within 48 hours of receipt. The Contractor shall provide the Contracting Officer a quote for repairs if the request is determined to need on-site support, and upon acknowledgement the Contractor shall provide an estimated timeframe for service availability. The quote shall include parts, labor, and incidental expenses. The Contractor shall begin performance only after receiving notification from the Contracting Officer. The Contracting Officer will issue a contract modification to exercise this option to provide funding for the final invoice.

4.0 GOVERNMENT FURNISHED PROPERTY (GFP)

4.1 Access to Government Facilities

The Government will provide the contractor access to Government facilities to accomplish statement of work tasking. The Contractor shall provide a list of employees who require access to these areas, including standard security clearance information for each person, to the Procuring Contracting Officer (PCO) no later than three business days after the date of award. Access to Government buildings at Naval Support Activity Panama City (NSA PC) is from 0600 to 1800 Monday through Friday, except Federal holidays. Normal work hours are from 0700 to 1700, Monday through Friday. Contractor employees shall be under Government oversight at all times. Government oversight requires that a Government employee be present in the same building/facility whenever Contractor employee(s) are performing work under this task order. Contractor personnel are not allowed to access any Government buildings at NSA PC outside the hours of 0600 to 1800 without the express approval of the Procuring Contracting Officer (PCO). When a Government facility is closed or early dismissal of Federal employees is directed due to severe weather, security threat, or a facility related problem that prevents personnel from working, onsite Contractor personnel regularly assigned to work at that facility should follow the same reporting and departure directions given to Government personnel.

5.0 DELIVERABLES

The contractor shall provide a maintenance and inspection report from SOW paragraphs 3.1 through 3.13 of all services provided, inspection, and testing results within 1 month after service has been completed. This will include review with NEDU of all services provided, issues as so applicable, and remedies as appropriate. These reports shall also be submitted along with applicable invoices.

Data shall be provided in accordance with the Contract Data Requirements List (CDRL) DD Form 1423.

6.0 PERIOD OF PERFORMANCE

The period of performance is from date of award until five (5) years after date of award.

7.0 SECURITY

This task involves access to Controlled Unclassified Information (CUI). Performance under this contract shall NOT require access to nor generate CLASSIFIED information.

7.1 Release of Information

(a) Release of information shall be in accordance with Section I, Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.204-7000, Disclosure of Information.

(b) All technical data provided to the Contractor by the Government will be protected from public disclosure in accordance with the markings contained thereon. All other information relating to the items to be delivered or services to be performed under this contract may not be disclosed by any means without prior approval of the appropriate NSWC PCD authority. Dissemination or public disclosure includes, but is not limited to, permitting access to such information by foreign nationals or by any other person or entity; publication of technical or scientific papers; advertising; or any other proposed public release. The Contractor shall provide adequate physical protection to such information to preclude access by any person or entity not authorized such access by the Government.

7.2 Controlled Unclassified Information (CUI)

Controlled unclassified information (CUI) is official information that requires the application of controls and protective measures for a variety of reasons and has not been approved for public release, to include technical information, proprietary data, information requiring protection under the Privacy Act of 1974, and Government-developed privileged information involving the award of contracts. CUI is a categorical designation that refers to unclassified information that does not meet the standards for National Security Classification under Executive Order 13526, but is (a) pertinent to the national interest of the United States or to the important interests of entities outside the Federal Government, and (b) under law or policy requires protection from unauthorized disclosure, special handling safeguards, or prescribed limits on exchange or dissemination.

7.3 Minimum Requirements for Access to Controlled Unclassified Information (CUI)

Prior to access, Contractor personnel requiring access to Department of the Navy (DoN) controlled unclassified information (CUI) or "user level access to DoN or DoD networks and information systems, system security and network defense systems, or to system resources providing visual access and/or ability to input, delete or otherwise manipulate sensitive information without controls to identify and deny sensitive information" contractors must have clearance eligibility, or submit an Electronic Questionnaire for Investigation Processing (SF 86) to NSWC PCD Security for processing and subsequent adjudication by the DoN Central Adjudication Facility.

7.4 Minimum Protection Requirements for Controlled Unclassified Information

Security classification guides and unclassified limited documents (e.g., For Official Use Only (FOUO), Distribution Statement Controlled) are not authorized for public release and, therefore, cannot be posted on a publicly accessible webserver or transmitted over the Internet unless appropriately encrypted.

7.5 CUI

CUI is a document designation, not a classification. This designation is used by Department of Defense (DoD) and a number of other federal agencies to identify information or material, which although unclassified, disclosure to the public of the information would reasonably be expected to cause a foreseeable harm to an interest protected by one or more provisions of the Freedom of Information Act (FOIA). This includes information that qualifies for protection pursuant to the provisions of the Privacy Act of 1974, as amended. CUI must be marked, controlled and safeguarded in accordance with DoDM 5200.48 Controlled Unclassified Information (CUI).

7.6 Security of Unclassified DoD Information on Non-DoD Information Systems (DoDI 8582.01) DoD Policy

Adequate security shall be provided for all unclassified DoD information on non-DoD information systems. Appropriate requirements shall be incorporated into all contracts, grants, and other legal agreements with non-DoD entities.

Information Safeguards are applicable to unclassified DoD information in the possession or control of non-DoD entities on non-DoD information systems, to the extent provided by the applicable contract, grant, or other legal agreement with the DoD.

Unclassified DoD information that has not been cleared for public release may be disseminated by the Contractor, grantee, or awardee to the extent required to further the contract, grant, or agreement objectives, provided that the information is disseminated within the scope of assigned duties and with a clear expectation that confidentiality will be preserved. Examples include:

(a) Non-public information provided to a Contractor (e.g., with a request for proposal).

(b) Information developed during the course of a contract, grant, or other legal agreement (e.g., draft documents, reports, or briefings and deliverables).

(c) Privileged information contained in transactions (e.g., privileged contract information, program schedules, contract-related event tracking).

It is recognized that adequate security will vary depending on the nature and sensitivity of the information on any given non-DoD information system. However, all unclassified DoD information in the possession or control of non-DoD entities on non-DoD information systems shall minimally be safeguarded as follows:

(a) Do not process unclassified DoD information on publically available computers (e.g., those available for use by the general public in kiosks or hotel business centers).

(b) Protect unclassified DoD information by at least one physical or electronic barrier (e.g., locked container or room, logical authentication or logon procedure) when not under direct individual control of an authorized user.

(c) At a minimum, overwrite media that have been used to process unclassified DoD information before external release or disposal.

(d) Encrypt all information that has been identified as CUI when it is stored on mobile computing devices such as laptops and personal digital assistants, compact disks, or authorized removable storage media such as thumb drives and compact disks, using the best encryption technology available to the Contractor or teaming partner.

(e) Limit transfer of unclassified DoD information to subcontractors or teaming partners with a need to know and obtain a commitment from them to protect the information they receive to at least the same level of protection as that specified in the contract or other written agreement.

(f) Transmit e-mail, text messages, and similar communications containing unclassified DoD information using technology and processes that provide the best level of privacy available, given facilities, conditions, and environment. Examples of recommended technologies or processes include closed networks, virtual private networks, public key-enabled encryption, and transport layer security.

(g) Encrypt organizational wireless connections and use encrypted wireless connections where available when traveling. If encrypted wireless is not available, encrypt document files (e.g., spreadsheet and word processing files), using at least application-provided password protected level encryption.

(h) Transmit voice and fax transmissions only when there is a reasonable assurance that access is limited to authorized recipients.

(i) Do not post unclassified DoD information to website pages that are publicly available or have access limited only by domain or Internet protocol restriction. Such information may be posted to website pages that control access by user identification and password, user certificates, or other technical means and provide protection via use of transport layer security or other equivalent technologies during transmission. Access control may be provided by the intranet (vice the website itself or the application it hosts).

(j) Provide protection against computer network intrusions and data exfiltration, minimally including:

(1) Current and regularly updated malware protection services, e.g., anti-virus, anti-spyware.

(2) Monitoring and control of both inbound and outbound network traffic (e.g., at the external boundary, sub-networks, individual hosts), including blocking unauthorized ingress, egress, and exfiltration through technologies such as firewalls and router policies, intrusion prevention or detection services, and host-based security services. Prompt application of security-relevant software patches, service packs, and hot fixes.

(k) Comply with other current Federal and DoD information protection and reporting requirements for specified categories of information (e.g., medical, proprietary, Critical Program Information (CPI), personally identifiable information, export controlled) as specified in contracts, grants, and other legal agreements.

(l) Report loss or unauthorized disclosure of unclassified DoD information in accordance with contract, grant, or other legal agreement requirements and mechanisms.

(m) Do not use external IT services (e.g., e-mail, content hosting, database, document processing) unless they provide at least the same level of protection as that specified in the contract or other written agreement.

7.7 Operations Security

Operations Security (OPSEC) is concerned with the protection of critical information: facts about intentions, capabilities, operations, or activities that are needed by adversaries or competitors to bring about failure or unacceptable consequences of mission accomplishment.

Critical information includes information regarding:

· Operations, missions, and exercises, test schedules or locations;

· Location/movement of sensitive information, equipment, or facilities;

· Force structure and readiness (e.g., recall rosters);

· Capabilities, vulnerabilities, limitations, security weaknesses;

· Intrusions/attacks of DoD networks or information systems;

· Network (and system) user identifications and passwords;

· Movements of key personnel or visitors (itineraries, agendas, etc.); and

· Security classification of equipment, systems, operations, etc.

The Contractor, subcontractors and their personnel shall employ the following countermeasures to mitigate the susceptibility of critical information to exploitation, when applicable:

· Practice OPSEC and facilitate OPSEC awareness;

· Immediately retrieve documents from printers assessable by the public;

· Shred sensitive and Controlled Unclassified Information (CUI) documents when no longer needed;

· Protect information from personnel without a need-to-know;

· When promulgating information, limit details to that essential for legitimacy;

During testing and evaluation, practice OPSEC methodologies of staging out of sight, desensitization, or speed of execution, whenever possible.

8.0 DISTRIBUTION LIMITATION STATEMENT

Technical documents generated under this purchase order shall be marked with Distribution Limitation Statement D. Word processing files shall have the statements included on the cover page of any resultant hard copy. All technical data gathered under this task order shall carry the following Distribution Limitation Statement and handling caveat:

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND US DOD CONTRACTORS ONLY, ADMINISTRATIVE OR OPERATIONAL USE, (DATE). OTHER U.S. REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO COMMANDING OFFICER, NAVY EXPERIMENTAL DIVE UNIT (NEDU), 321 BULLFINCH ROAD, PANAMA CITY BEACH, FLORIDA 32407-7012.

DESTRUCTION NOTICE - FOR CLASSIFIED DOCUMENTS, FOLLOW PROCEDURES IN DOD 5220.22-M, NATIONAL INDUSTRIAL SECURITY PROGRAM OPERATING MANUAL, CHAPTER 5, SECTION 7 OR DOD 5200.1-R, INFORMATION SECURITY PROGRAM REGULATION. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OF RECONSTRUCTION OF THE DOCUMENT.

File details come from the government source that posted it. Updated .