March 15, 2018
MEMORANDUM
Subj.: SOLE SOURCE JUSTIFICATION FOR LCAC CABLE
ASSEMBLIES (PURCHASE REQUEST 1300702492)
1. Identification of the agency and the contracting activity, and specific identification of the document as a “Limited Source Justification.”
This is a specification for the fabrication of metal assemblies. Contracting activity is the Naval Sea Systems Command, Naval Surface Warfare Center, Panama City Division (NSWC PCD), 110 Vernon Avenue, Panama City, FL 32407-7001 (Contracts Department Code 02).
2. Nature and/or description of the action being approved.
This action will award a firm fixed price purchase order to fabricate cable assemblies for the Landing Craft Air Cushion (LCAC). These assemblies will be used in the assembly of the System Baseline Configuration 4 (SBC4) installation kits to be installed on the LCAC fleet.
3. A description of the supplies or services required to meet the agency’s needs (including the estimated value).
The contract effort is to acquire:
Item
Item P/N
TOTA
L
QTY
1 CABLE ASSEMBLY, CAMS A IO 1-2 TO CAMS
414-8430598-001
2 CABLE ASSEMBLY, CAMS B IO 1-2 TO CAMS
414-8430598-002
3 CABLE ASSEMBLY, CAMS A IO 3-4 TO CAMS
414-8430599-001
4 CABLE ASSEMBLY, CAMS B IO 3-4 TO CAMS
414-8430599-002
5 CABLE ASSEMBLY, CAMS A IO 5-6 TO CAMS
414-8430600-001
6 CABLE ASSEMBLY, CAMS B IO 5-6 TO CAMS
414-8430600-002
7 CABLE ASSEMBLY, CAMS A IO 7-8 TO CAMS
414-8430601-001
8 CABLE ASSEMBLY, CAMS B IO 7-8 TO CAMS
414-8430601-002
9 CABLE ASSEMBLY, CAMS A IO 9-10 TO CAMS
414-8430602-001
10 CABLE ASSEMBLY, CAMS B IO 9-10 TO CAMS 414-8430602-002 4
11 CABLE ASSEMBLY, CAMS A IO 11-12 TO MIL-
414-8430603-001
12 CABLE ASSEMBLY, CAMS B IO 11-12 TO MIL-
414-8430603-002
13 CABLE ASSEMBLY, CAMS A LAN/COM TO
414-8430605-001
14 CABLE ASSEMBLY, CAMS B LAN/COM TO
414-8430605-002
15 CABLE ASSEMBLY, CCIU A J3 TO CAMS JBOX
414-8430607-001
16 CABLE ASSEMBLY, CCIU B J3 TO CAMS JBOX
414-8430607-002
17 CABLE ASSEMBLY, CCIU A J4 TO CAMS JBOX
414-8430608-001
18 CABLE ASSEMBLY, CCIU B J4 TO CAMS JBOX
414-8430608-002
19 CABLE ASSEMBLY, CAMS JBOX A J19 TO
414-8430609-001
20 CABLE ASSEMBLY, CAMS JBOX A J12 TO
414-8430610-001
21 CABLE ASSEMBLY, CAMS JBOX B J18 TO RPU
414-8430611-001
22 CABLE ASSEMBLY, KVN 1 J2 TO VDU J3
414-8430612-001
23 CABLE ASSEMBLY, KVN 2 J2 TO VDU J4
414-8430612-002
CABLE ASSEMBLY, KVN 1 J4 TO ESU A&B
J3 AND ENET-1553 J4
414-8430613-001
CABLE ASSEMBLY, KVN 2 J4 TO ESU A&B
J3 AND ENET-1553 J3
414-8430613-002
26 CABLE ASSEMBLY, DTD AND TRACKBALL,
414-8430614-001
27 CABLE ASSEMBLY, ENET-1553 UNIT J2 TO
414-8430616-001
28 CABLE ASSEMBLY, MIL-STD-1553B, ENET-
414-8430620-001
29 CABLE ASSEMBLY, MIL-STD-1553B, ENET-
414-8430620-002
30 CABLE ASSEMBLY, MIL-STD-1553B, ENET-
414-8430620-003
31 CABLE ASSEMBLY, MIL-STD-1553B, ENET-
414-8430620-004
32 CABLE ASSEMBLY, VIDEO OUTPUT, VDU J5
414-8430622-001
33 CABLE ASSEMBLY, VIDEO OUTPUT, VDU J6
414-8430622-002
34 CABLE ASSEMBLY, VIDEO OUTPUT, VDU J7
414-8430622-003
35 CABLE ASSEMBLY, RPU 1 P2 TO ESU A J8
414-8430623-001
36 CABLE ASSEMBLY, RPU 2 P2 TO ESU B J8
414-8430623-002
37 CABLE ASSEMBLY, ESU A J10 TO ESU B J10
414-8430624-001
38 CABLE ASSEMBLY, ESU A J9 TO AADSIU J8
414-8430625-001
The Government’s minimum needs have been verified by the certifying technical and requirements personnel. This memo does not authorize acquisition for other requirements.
This acquisition will be conducted using simplified acquisition procedures with a total dollar value above micro-purchase levels, but not exceeding the simplified acquisition threshold of $150,000.00. All material will be delivered no later than eight (8) weeks after award of the order. The contract action will be funded with FY18 Operation & Maintenance, Navy (O&MN) funds.
4. Identification of the justification rationale (see FAR 8.405-6(a) and (b)) and, if applicable, a demonstration of the proposed contractor’s unique qualifications to provide the required supply or service.
10 U.S.C. 2304(c) (1) - Only one responsible source and no other supplies or services will satisfy agency requirements, FAR 6.302-1. The items being purchased were specifically tested and evaluated against the Naval Sea Systems Command (NAVSEA) technical requirements as provided on the LCAC C4N System Baseline Configuration 4 (SBC4) product specification during the product’s initial prototyping and evaluation phase. These components are used in a Build-to-Print drawing package and if another vendor’s product is chosen at this point, there will be a redesign of the printed circuit board, chassis, and cable assemblies. No other source for these components currently exists. Developing another source for these items would be cost and schedule prohibitive.
Developing another source would be expensive as there would be significant reoccurring engineering and testing costs (environmental) and time associated with the effort estimated at $150,000 adding an additional twelve month lead time.
5. A determination by the ordering activity contracting officer that the order represents the best value consistent with FAR 8.404(d).
The Contracting Officer has determined that the order represents the best value and results in the lowest overall cost alternative (considering price, reoccurring cost, administrative costs, engineering and redesign costs, etc.) to meet the Government’s needs.
6. A description of the market research conducted among schedule holders and the results or a statement of the reason market research was not conducted.
This requirement is less than $25,000 and does not require synopsis on the Federal Business Opportunities (FEDBIZOPPS) website per FAR 5.2. The synopsis expressed the Government’s intent to contract on a sole source basis. The synopsis provided instructions for offeror(s), wishing to qualify items for future procurements.
7. Any other facts supporting the justification: None.
8. A statement of the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services is made.
As stated in paragraph 4 above, BTC is the only company that can meet the requirement.
TECHNICAL AND REQUIREMENTS REQUESTING OFFICIAL
I certify that the facts and representations under my cognizance, which are included in this justification and its supporting acquisition planning data, except as noted herein, are complete and accurate to the best of my knowledge and belief.
CONTRACTING OFFICER REVIEW AND APPROVAL
I, as contracting officer for the contracting activity, have reviewed this justification and certify that the justification is accurate and complete to the best of my knowledge and belief. I hereby approve this justification
File details come from the government source that posted it.