Errata01-018-15.pdf

PDF 70 KB Posted

Attached to
ARCO (ARDM-5); Continuous Maintenance Availability Federal contract opportunity
Solicitation number
N55236-15-Q-0131
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Errata No. One for SSSD 018-15

View the file

Other files for this federal contract opportunity

Other files attached to ARCO (ARDM-5); Continuous Maintenance Availability, newest first.
File Type Posted
N55236-15-Q-0131_ARCO_(ARDM-5)_0002.pdf PDF
N55236-15-Q-0131_ARCO_(ARDM-5)_0001.pdf PDF
Attachment_2_-_Request_for_Specification_Clarification_Form.docx DOCX document
N55236-15-Q-0131_ARCO_(ARDM-5).pdf PDF
Attachment_1_SSSD_018-15_ArcoCM-WorkPackage.pdf PDF
ArcoCM-WorkPackage.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.

SHIP: ARCO (CNRMC 5)

SSSD-018-15

ERRATA NUMBER:

SPECIFICATION NUMBER:

One

THE FOLLOWING ITEMS ARE REPLACED:

179-00-001

DATED: Page 1 of 1

SHIP: ARCO (CNRMC 5) ITEM NO: 179-00-001

COAR: 28 PCN: DA01-0935

DA01-0004

CSWT FILE NO: 130-007 CMP: NONE

REVISED: 16 Jun 2014 PLANNER: OSTI, VICTOR

GREEN, DONALD

SSP: SSSD-018-15 1 of 2 ITEM NO: 179-00-001 ERRATA NO. One

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Dock Ramp and Ramp Extension Plate Assembly; repair

1.2 Location of Work:

1.2.1 Dock Access Ramp and Onboard Ramp Extension in Dock Basin

1.3 Identification:

1.3.1 Quantity (One) each Dock Access Ramp, Sliding Plate, Screwed Plate and Extension Ramp Assembly

2. REFERENCES:

2.1 Standard Items

2.2 4802179, Rev C, Pontoon Structure

3. REQUIREMENTS:

3.1 Remove DELETEDeach ramp sliding plate, screwed down extension plate and each dock basin extension ramp using 2.2 as guidance. (E1)

3.2 Weld DELETEDbuildup and machine 8 each bolt holes to accommodate new fasteners. Four each deck tabs and four each foundation bolt holes. (E1)

3.3 Remove DELETEDexisting and install new the end of extension ramp flat bar assuring it's level to dock basin with no uplift using 2.2 as guidance.

(E1)

3.4 Accomplish DELETEDthe requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7. (E1)

3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 28, columns A through E for new non-skid on access ramp, sliding plate, screwed down plate and dock extension ramp.

3.6 DELETEDAccomplish the requirements of 009-32 of 2.1, including Table 2, Line 12, Column A through E, for drydock deck areas under the extension ramp.

(E1)

3.7 Install DELETEDeach sliding plate, screwed plate and extension dock ramp to their respective locations. (E1)

3.7.1 Install DELETEDnew 44 each CRES 304 flat head slotted hold down screws for the screwed down plate and 4 each CRES 304, Bolt, washer and nuts for the extension ramp hold down tabs using existing for dimensional requirements and using 2.2 as guidance.

(E1)

3.7.1.1 Align DELETEDramp prior to tightening.

(E1)

3.8 Accomplish DELETEDthe requirements of 009-32 of 2.1 for new and

SHIP: ARCO (CNRMC 5)

SSP: SSSD-018-15 2 of 2 ITEM NO: 179-00-001 ERRATA NO. One

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

disturbed surfaces. (E1)

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

File details come from the government source that posted it. Updated .