Errata01-018-15.pdf
PDF 70 KB Posted
- Attached to
- ARCO (ARDM-5); Continuous Maintenance Availability Federal contract opportunity
- Solicitation number
- N55236-15-Q-0131
About this file
Errata No. One for SSSD 018-15
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N55236-15-Q-0131_ARCO_(ARDM-5)_0002.pdf | ||
| N55236-15-Q-0131_ARCO_(ARDM-5)_0001.pdf | ||
| Attachment_2_-_Request_for_Specification_Clarification_Form.docx | DOCX document | |
| N55236-15-Q-0131_ARCO_(ARDM-5).pdf | ||
| Attachment_1_SSSD_018-15_ArcoCM-WorkPackage.pdf | ||
| ArcoCM-WorkPackage.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: ARCO (CNRMC 5)
SSSD-018-15
ERRATA NUMBER:
SPECIFICATION NUMBER:
One
THE FOLLOWING ITEMS ARE REPLACED:
179-00-001
DATED: Page 1 of 1
SHIP: ARCO (CNRMC 5) ITEM NO: 179-00-001
COAR: 28 PCN: DA01-0935
DA01-0004
CSWT FILE NO: 130-007 CMP: NONE
REVISED: 16 Jun 2014 PLANNER: OSTI, VICTOR
GREEN, DONALD
SSP: SSSD-018-15 1 of 2 ITEM NO: 179-00-001 ERRATA NO. One
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Dock Ramp and Ramp Extension Plate Assembly; repair
1.2 Location of Work:
1.2.1 Dock Access Ramp and Onboard Ramp Extension in Dock Basin
1.3 Identification:
1.3.1 Quantity (One) each Dock Access Ramp, Sliding Plate, Screwed Plate and Extension Ramp Assembly
2. REFERENCES:
2.1 Standard Items
2.2 4802179, Rev C, Pontoon Structure
3. REQUIREMENTS:
3.1 Remove DELETEDeach ramp sliding plate, screwed down extension plate and each dock basin extension ramp using 2.2 as guidance. (E1)
3.2 Weld DELETEDbuildup and machine 8 each bolt holes to accommodate new fasteners. Four each deck tabs and four each foundation bolt holes. (E1)
3.3 Remove DELETEDexisting and install new the end of extension ramp flat bar assuring it's level to dock basin with no uplift using 2.2 as guidance.
(E1)
3.4 Accomplish DELETEDthe requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7. (E1)
3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 28, columns A through E for new non-skid on access ramp, sliding plate, screwed down plate and dock extension ramp.
3.6 DELETEDAccomplish the requirements of 009-32 of 2.1, including Table 2, Line 12, Column A through E, for drydock deck areas under the extension ramp.
(E1)
3.7 Install DELETEDeach sliding plate, screwed plate and extension dock ramp to their respective locations. (E1)
3.7.1 Install DELETEDnew 44 each CRES 304 flat head slotted hold down screws for the screwed down plate and 4 each CRES 304, Bolt, washer and nuts for the extension ramp hold down tabs using existing for dimensional requirements and using 2.2 as guidance.
(E1)
3.7.1.1 Align DELETEDramp prior to tightening.
(E1)
3.8 Accomplish DELETEDthe requirements of 009-32 of 2.1 for new and
SHIP: ARCO (CNRMC 5)
SSP: SSSD-018-15 2 of 2 ITEM NO: 179-00-001 ERRATA NO. One
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
disturbed surfaces. (E1)
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.