Attachment 1

View the file

Other files

File Type Posted
N55236-15-Q-0083_AMENDMENT_0005.pdf PDF
N55236-15-Q-0083_AMENDMENT_0004.pdf PDF
N55236-15-Q-0083_AMENDMENT_0003.pdf PDF
N55236-15-Q-0083_AMENDMENT_0002.pdf PDF
N55236-15-Q-0083_AMENDMENT_0001.pdf PDF
N55236-15-Q-0083.pdf PDF
Section_J _Attachment_2.doc DOC document
Section_J _Attachment_3.doc.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

SWRMC (NMD)

ARCO (CNRMC 5)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SSSD-014-15

INCLUDES ALL CHANGES THROUGH 4/23/2015

INDEX

SHIP: ARCO (CNRMC 5) SSSD-014-15

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-15 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 11/07/2013

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/29/2011

009-03 Toxic and Hazardous Substances; control 01/17/2013

009-04 Quality Management System; provide 11/07/2013

009-05 Temporary Accesses; provide 01/17/2013

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

06/10/2014

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 06/10/2014

009-08 Fire Protection at Contractor's Facility; accomplish 06/10/2014

009-10 Shipboard Asbestos-Containing Material (ACM); control 07/29/2011

009-18 Magnetic Material; control 01/17/2013

009-19 Provisioning Technical Documentation (PTD); provide 07/29/2011

009-20 Government Property; control 01/17/2013

009-21 Logistics and Technical Data; provide 07/29/2011

009-23 Interferences; remove and install 01/17/2013

009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 01/17/2013

009-28 Fire Prevention Requirements; accomplish 06/10/2014

009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

06/10/2014

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide

07/19/2007

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

07/29/2011

009-59 Organotin Antifouling Material; control 07/29/2011

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

11/07/2013

009-61 Shipboard Use of Fluorocarbons; control 01/17/2013

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/29/2011

009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011

009-67 Integrated Total Ship Testing; manage 01/17/2013

009-69 Heavy Weather Plan; provide 11/07/2013

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

06/10/2014

009-72 Physical Security at Private Contractor's Facility; accomplish 01/17/2013

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 11/07/2013

ITEM_NO. TITLE DATE

009-74 Occupational, Safety and Health Requirements; accomplish 06/10/2014

009-77 Cofferdam Requirements; accomplish 01/17/2013

009-79 Government Owned Material (GOM); status reporting 07/29/2011

009-80 Ship's Facilities; provide 07/29/2011

009-81 Compartment Closeout; accomplish 01/17/2013

009-82 Data Requirements When Installing an Equal Component Vice Specified Component;

provide

07/29/2011

009-83 Wire Rope Fitting Verification; provide 01/17/2013

009-84 Accountability of Temporary Fasteners; provide 01/17/2013

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

08/01/2008

009-87 Chemical Disinfection Procedures; accomplish 01/17/2013

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

07/29/2011

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

07/29/2011

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

01/17/2013

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 01/17/2013

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/17/2013

009-99 Ship Departure Report; provide 01/17/2013

009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/30/2010

009-101 Requirements for Mooring, Entry to and Departure from Contractor's Facility;

accomplish

01/17/2013

009-102 Alteration Verification; provide 07/29/2011

009-103 Weight and Moment Change Data; provide 07/29/2011

009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014

009-108 Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor's Facility; accomplish

07/29/2011

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish

07/29/2011

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/29/2011

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

11/07/2013

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/29/2011

009-117 AEGIS Light Off (ALO) Support for AEGIS Weapons Systems Assessments (AWSA);

provide

01/06/2014

009-118 CG Deck Loading; accomplish 01/17/2013

009-120 Fact Finding and Critique of Unplanned Events; manage 01/06/2014

009-121 Ship Assessment/Inspection Requirements; provide 01/06/2014

DATETITLEITEM NO.

CATEGORY II. FY-15 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

07-Nov-13

009-32 Cleaning and Painting Requirements; accomplish 07-Nov-13

ITEM NO. TITLE

Stanchions; replace612-11-001

SHIP: ARCO (CNRMC 5) ITEM NO: 612-11-001

COAR: 28 PCN: TE01-0001

CSWT FILE NO: 612-008 CMP: NONE

REVISED: 16 Jun 2014 PLANNER: STOUT, MICHAEL

GREEN, DONALD

SSP: SSSD-011-15 1 of 2 ITEM NO: 612-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Stanchions; replace

1.2 Location of Work:

1.2.1 Main Deck, Port, Starboard and AFT

1.3 Identification:

1.3.1 Quantity (45) EA., Aluminum Stanchions and Bases,

2. REFERENCES:

2.1 Standard Items

2.2 804-5184155 Liferails, Lifelines & Awning Stanchions (AL & STL) Details and L/M

3. REQUIREMENTS:

3.1 Remove, template existing, and install new, the equipment listed in 1.3.1, in accordance with 2.2, using 2.2 as guidance.

3.1.1 Remove, template from existing and install new Kevlar

lifelines, including clevises, to suit new stanchion installation, using 2.2 as guidance.

3.1.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns C, Lines One through 7.

3.2 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 26, Column E, for each new stanchion and base.

(I)(G) "LOAD TEST"

3.3 Accomplish a static load test of the new handrails installed in 3.1 in accordance with General Note 22 of 2.2. No damage allowed.

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a completed test memo to the SUPERVISOR.

3.4 Accomplish the requirements of 009-32, of 2.1, for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

SHIP: ARCO (CNRMC 5)

SSP: SSSD-011-15 2 of 2 ITEM NO: 612-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. None.

5.3 KITTED MATERIAL:

1. None.

File details come from the government source that posted it. Updated .