Statement of Work Updated.pdf

PDF 114 KB Posted

Attached to
USS ARLINGTON (SSDG Exhaust Expansion Joint)
Solicitation number
N5005421Q0067
Issued by

View the file

Other files

File Type Posted
DD2345 Presentation.pdf PDF
SOW.docx DOCX document
DD2345 Form (002).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Statement of Work

USS ARLINGTON (LPD-24)

SSP: TPPC-LPD24-MARMC21-E002

Title: SSDG EXHAUST EXPANSION JOINT Work Spec Item 311-11-001, 311-12-001, 311-14-001, 311-15-001

1.0. INTRODUCTION.

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 be delivered to DLA Distribution Norfolk RMC

PROJ, Bunker Hill Towaway Bldg. X136, and Norfolk, VA 23511.

2.0. GENERAL REQUIREMENTS

2.1. The Contractor shall supply and deliver the material listed in 2.1.1- 2.1.5 complying with the following specifications:

SOW

Para no.

QTY NAME OF PART DRAWING #

TECH MANUAL

PIECE # W/I # W/I

Para

2.1.1 4 EXPANSION JOINT 259-7319901 207 311-11-001

311-12-001

311-14-001

311-15-001

5.1.1

2.1.2 4 GASKET 259-7318371 17 311-11-001

311-12-001

311-14-001

311-15-001

5.1.2

2.1.3 24 BOLT 259-7318371 9 311-11-001

311-12-001

311-14-001

311-15-001

5.1.3

2.1.4 24 NUT 259-7318371 13 311-11-001

311-12-001

311-14-001

311-15-001

5.1.3

2.1.5 24 LOCK TAB 259-7318371 25 311-11-001

311-12-001

311-14-001

311-15-001

5.1.4

2.2 All material to be in accordance with Reference 259-7319901, 259-7318371 of work spec item

2.3 Required Date of Delivery: 06/13/2021 or best possible.

2 | P a g e

3.0. DELIVERY / ACCEPTANCE

3.1. Delivery shall be made to the following address:

DLA Distribution Norfolk RMC PROJ Bunker Hill Towaway Bldg. X136 Norfolk, VA 23511

Primary: Mr. Hubbeard Ervin

Phone: (757) 373-8698 or (757) 278-8134

Secondary: Mr. Cunningham Phone: (757) 278-8148 RIC 17H

3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at

FOB Destination. Shipping cost shall be included in the quote.

4.0 MATERIAL SHIPMENT NOTIFICATION

4.1 Notification of date and tracking information to be provided to the following upon shipment of material:

4.1.1 Allison Blair, allison.blair@navy.mil 757-967-6077

4.1.2 Shepard Whitfield, shepard.whitfield@navy.mil 757-967-6076

4.1.3 Dante Ferrer, dante.ferrer@navy.mil 757-396-0040

File details come from the government source that posted it. Updated .