Statement of Work Title: Distilling Plant Number 2 Feedwater Heater/After Condenser; replace Work Spec Item 531-12-001

1.0. INTRODUCTION.

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, and Norfolk, VA 23511.

2.0. GENERAL REQUIREMENTS

2.1. The Contractor shall supply and deliver the material listed in 2.1.1 complying with the following specifications:

SOW Para no.
QTY
NAME OF PART
TECH MANUAL #
PIECE #
W/I #
W/I Para #
2.1.1
1
Heater, Fluid, Industrial (Feedwater)
S9531-BJ-MMA-010 Rev 1
7-1-3
531-12-001
3.3

2.2 All material to be in accordance with Reference 2.2 of spec item 531-12-001.

2.3 Required Date of Delivery: 11/07/2020

3.0. DELIVERY / ACCEPTANCE

3.1. Delivery shall be made to the following address:

DLA Distribution Norfolk RMC PROJ Bunker Hill Towaway Bldg. X136 Norfolk, VA 23511 M/F: Magalene McKelvey

3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at FOB Destination. Shipping cost shall be included in the quote.

4.0 Evaluation Criteria

4.1. The basis for award is Low Price Technically Acceptable.