A17.0 Solicitation Q & A answered.pdf
PDF 43 KB Posted
- Attached to
- 150-Ton Chiller Lease Federal contract opportunity
- Solicitation number
- N4523A23Q1333
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A17.0 Solicitation Q A's_2_answered.pdf | ||
| A17.0 Solicitation Q A's_2_answered.pdf | ||
| A17.0 Solicitation Q & A answered.pdf | ||
| C08.0 N4523A23Q1333 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: Please clarify: in PWS 5.1.1 asks for 40 psi – which normally translates into 92 ft/hd, but 5.2.2 asks for 115 ft/hd (50 psi). Would a 100 ft./hd (45 psi) pump be acceptable?
A: I believe this is talking about requirements in 2.1.1 and 2.2.2, 2.1.1 is saying the system needs to be able to flow 300gpm at a pressure drop of 40psi through the system, where as 2.2.2 is talking about the minimum requirement for the pump is to 300gpm with a TDH of 115 feet, a 100ft/hd pump does not meet the minimum requirement for the pump.
Q: Please clarify the requirement of 90 dBA. At what distance?
A: Sound testing for equipment is measured at 3ft.
File details come from the government source that posted it. Updated .