Price Proposal Worksheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UF_56_&_57_Drawings.zip | ZIP file | |
| N4523A-17-R-0029_U0002.pdf | ||
| UF_56_&_57_Drawings.zip | ZIP file | |
| N4523A-17-R-0029__U0001.pdf | ||
| UF_56_&_57_Drawings.zip | ZIP file | |
| Exhibit_A_CDRLs_and_DIDs.pdf | ||
| Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx | DOCX document | |
| N4523A17R0029.pdf | ||
| Attachment_J-4_Contract_Performance_Data_Sheet.doc | DOC document | |
| Attachment_J-5_Corporate_Experience_Data_Sheet.doc | DOC document | |
| Attachment_J-1_Statement_of_Work_(SOW).docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UF 56
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | Utility Float 56 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | LABOR PRICE | MATERIAL PRICE | M/H | LABOR PRICE | MATERIAL PRICE | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0 | |||||||||
| 1.5 | Required Documents | $0 | |||||||||
| 1.6 | Progress Meetings | $0 | |||||||||
| 1.7 | Availability Requirements | $0 | |||||||||
| 1.8 | Care Of Vessel | $0 | |||||||||
| 1.16 | Preservation OQE | $0 | |||||||||
| 1.17 | Environmental/Hazwaste Managemment | $0 | |||||||||
| 1.21 | Test Plan | $0 | |||||||||
| 3.1 | Docking & Undocking | $0 | |||||||||
| 3.2.1 | Distinguishing Figures & Markings | $0 | |||||||||
| 3.2.2 | Rubber Fender | $0 | |||||||||
| 3.2.3 | Zinc Anodes | $0 | |||||||||
| 3.2.4 | Hull Blasting & Preservation | $0 | |||||||||
| 3.2.5 | Hull Visual Inspection | $0 | |||||||||
| 3.2.6 | Hull UT Inspection | $0 | |||||||||
| 3.4.1 | Tanks: Replace Pipe Plug | $0 | |||||||||
| 3.4.2 | Tanks: Air Test | $0 | |||||||||
| 3.5.1 | Main Deck Non-skid repair | $0 | |||||||||
| 3.5.2 | Main Deck Visual Inspection | $0 | |||||||||
| 3.5.3 | Main Deck UT inspection | $0 | |||||||||
| Column Totals | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.
UF 57
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | Utility Float 57 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | LABOR PRICE | MATERIAL PRICE | M/H | LABOR PRICE | MATERIAL PRICE | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0 | |||||||||
| 1.5 | Required Documents | $0 | |||||||||
| 1.6 | Progress Meetings | $0 | |||||||||
| 1.7 | Availability Requirements | $0 | |||||||||
| 1.8 | Care Of Vessel | $0 | |||||||||
| 1.16 | Preservation OQE | $0 | |||||||||
| 1.17 | Environmental/Hazwaste Managemment | $0 | |||||||||
| 1.21 | Test Plan | $0 | |||||||||
| 3.1 | Docking & Undocking | $0 | |||||||||
| 3.2.1 | Distinguishing Figures & Markings | $0 | |||||||||
| 3.2.2 | Rubber Fender | $0 | |||||||||
| 3.2.3 | Zinc Anodes | $0 | |||||||||
| 3.2.4 | Hull Blasting & Preservation | $0 | |||||||||
| 3.2.5 | Hull Visual Inspection | $0 | |||||||||
| 3.2.6 | Hull UT Inspection | $0 | |||||||||
| 3.4.1 | Tanks: Replace Pipe Plug | $0 | |||||||||
| 3.4.2 | Tanks: Air Test | $0 | |||||||||
| 3.5.1 | Main Deck Non-skid repair | $0 | |||||||||
| 3.5.2 | Main Deck Visual Inspection | $0 | |||||||||
| 3.5.3 | Main Deck UT inspection | $0 | |||||||||
| Column Totals | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.
File details come from the government source that posted it. Updated .