N4523A-15-R-0007__LET_Kit-2.pdf
PDF 641 KB Posted
- Solicitation number
- N4523A-15-R-0007
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4523A-15-R-0007-0003.pdf | ||
| 15R0007_Amend_0002.pdf | ||
| L.E.T._Amend_0001.pdf | ||
| Attachment_J-3__Technical_Proposal_Breakdown.xlsx | XLSX spreadsheet | |
| Attachment_J-1_SOW.pdf | ||
| Attachment_J-2__Request_for_Clarifications_(Rev_09-2014).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local time 20 Apr 2015
X
A
X B
X C
D
EX
X
G
F 38 - 60
61 - 68
X H 69 - 72 karen.w.carter@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A3 1 72
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N4523A 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Bldg 844 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KAREN W. CARTER 360-476-4053
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 3
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
4 - 15 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
17 - 18 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 19 - 22 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 23 - 28 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
29 - 36
PART II - CO NTRACT CLAUSES
PUGET SOUND NAVAL SHIPYARD CODE 400
1400 FARRAGUT
CONTRACTING CODE 440
BREMERTON WA 98314-5001
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
21 Mar 2015
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N4523A-15-R-0007
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
Maintenance and repair of
FFP
2 Each
Logistic Escape Trunk (LET) Houses / Equipmnet 21 - Kit 2, including houses, cofferdams and ladders in accordance with Statement of Work contained in Section J, Attachment J-1.
For purposes of this procurement, the unit of issue "EACH" includes the LET House and its associated equipment (e.g. cofferdam, fwd ladder & platform, exterior vertical ladder, and aft ladder & platform).
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
Over and Above Work
FFP
Lot
Additional Repairs not specified in CLIN 0001 (e.g. within scope growth work identified during execution of the contract), per DFARS 252.217-7028, " Over and Above Work
(DEC 1991)".
Note: This line item is not priced. It is a place-holder for Over and Above Work issued via contract modifications, if required, during the performance of maintenance.
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the
Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)
This entire contract is fixed price.
Section C - Descriptions and Specifications
OVER & ABOVE WORK REQUIREMENTS
In addition to the reporting requirements outlined in DFARS Clause 252.217-7028 OVER AND ABOVE WORK, and Clause RMC C-2-0009 OVER AND ABOVE WORK, the contractor will be responsible for providing a detailed work statement and proposed price, broken out by its cost elements (prime contractor's labor and materials, subcontractor labor and materials, all indirect costs by cost category), for each contractor initiated Condition Found
Report (CFR) (same as the ―Work Request stated in the DFARS clause) that requests a change to the contract. This additional requirement applies when the contractor identifies work specification deficiencies, Government Furnished
Information deficiencies, and/or identifies additional work or material it considers necessary in order to produce a reliable or complete work item repair. See also NAVSEA 5252.217-9107 GROWTH AND NEW WORK (SEP
1990), Section H.
The work statement and the CFR will be submitted to the Government COR. In separate correspondence, the work statement, CFR, and price proposal must be submitted to the cognizant Contract Specialist. The submission shall be in such form and supported by such reasonably detailed information as the Contracting Officer may require. Costs associated with performance of the above requirements shall be incorporated into contractor's bid price.
(End of Text)
STATEMENT OF WORK
SEE SECTION J - ATTACHMENT J-1, STATEMENT OF WORK
NWRMC SECURITY REQUIREMENTS
NAVY INSTALLATIONS, BADGING, AND ACCESS REQUIREMENTS (NWRMC) (JUL 2014)
1. GENERAL:
a. Contractor personnel shall comply with all current badging and security procedures required to gain access to any Government site. Access to Naval Installations sites may only be gained by obtaining a badge (either permanent or temporary) from the security office. It is the contractor’s responsibility to check for and obtain changes and updated information at each installation on a continual basis. Further information can be found at the individual Naval Installation websites.
b. The following badging and access requirements are effective 01 Sep 2011.
c. Commander, Navy Installations Command (CNIC), has established the Navy Commercial Access
Control System (NCACS) (replaces the RAPIDGate program system) a standardized process for granting unescorted access privileges to vendors, contractors, suppliers, and service providers not otherwise entitled to the issuance of a
Common Access Card (CAC) who seek access to and can provide justification to enter Navy installations and facilities. Visiting vendors may obtain daily passes directly from the individual Navy Installations by submitting identification credentials for verification and undergoing a criminal screening/ background check.
d. Contractor employees shall require an individual identification badge, and may require additional badges, to gain access to job sites.
e Lack of proper I.D. badge(s) shall result in denial of access to the Naval Installation, and/or the ship, resulting in a delay at the Contractor's expense.
f. Contractor personnel are authorized to retain temporary badges until the badge expiration date or termination of employment. Upon badge expiration date, termination of employment, or completion of contract, the
Contractor is required to immediately notify the Contracting Officer’s Security Officer and return all badges.
g. Badges must be displayed on the outermost garment above the waist at all times. The only exception would be while the contractor personnel is engaged in work which could cause a safety hazard if the badge were worn while performing the work.
h. Lost or misplaced badges shall be reported immediately to the CONTRACTING OFFICER’S
SECURITY OFFICER or if after close of business working hours, to NESCOM 476-3393.
i. All additional badging or access requirements will be identified on a case by case basis in the individual delivery order.
2. PSNS & IMF CONTROLLED INDUSTRIAL AREA (CIA):
a. Effective 16 June 2014 PSNS & IMF will only issue NAVSEA badges to contractor employees who do possess one of the following credentials: Common Access Card (CAC), a single day pass issued by Naval Base
Kitsap (NBK) or Navy Commercial Access Control System (NCACS) credential.”
b. As a contract requirement, the contractor shall prepare a Visit Request List of all prime and subcontractor personnel required to access Naval Vessels in the CIA. The access list shall be restricted to only those employees who have a "need to access" in the execution of the contract requirements. The prime contractor shall bear full responsibility for the accuracy of the Visit Request List. With good cause, as determined by the
CONTRACTING OFFICER or appropriate SECURITY PERSONNEL, access requests may be refused or amended.
Updates to the Visit Request List shall be made on an as needed basis.
c. Submit the Visit Request List with a cover letter on Company letterhead to the Contracting Officer’s
Security Officer, Sandy Ball, voice 360-476-4245, email: sandra.ball@navy.mil. The cover letter shall be a formal request for badging and access during the contract or delivery order period of performance. The letter shall include
(1) purpose for access, (2) dates of validity (period of performance), (3) contract number, and (4) name of subcontractors to be employed. The letter shall be signed by the prime Contractor's Facility Security Officer, and shall be received by the Contracting Officer’s Security Officer no less than five (5) working days prior to access being granted.
d. The Visit Request List shall be organized ALPHABETICALLY BY LAST NAME and contain the following information in column form:
(1) NAME (Last, First, MI)
(2) DATE OF BIRTH
(3) PLACE OF BIRTH (City & State)
(4) SSN
(5) CITIZENSHIP
(6) COMPANY (Prime Contractor or Subcontractor)
e. Badges may be picked up at the PSNS & IMF Pass & ID office, and requires contractor employees to provide identification of citizenship. Valid forms of citizenship are:
(1) Certified Birth Certificate (not a copy)
(2) Current Passport
(5) Naturalization Papers
(6) Consular Report of Birth (FS-240):
mailto:sandra.ball@navy.mil
*Note: If contractor employees are providing document with no photo, they shall also be required to present government issued photo identification (i.e. Driver’s License or ID card).
f. For contractor individuals that require higher level badge requirements (access to Nuclear Work Areas
(NWA) or Controlled Nuclear Information Areas (CNIA) areas (i.e. Red or Yellow badges), the Contractor’s Facility
Security Officer shall (1) Input each individual’s information into the Joint Personnel Adjudication System (JPAS)
Security program with Security Management Office (SMO) number 002515, and (2) Submit a completed DD254 and separate Visit Request List to the Contracting Officer’s Security Officer.
g. To grant Contractor Vehicle Access to the PSNS & IMF CIA, a list of vehicles, a copy of each vehicle registration and a justification for access shall be submitted for processing via Attachment J-N/A PSNS & IMF
Form 5530/25. Contractors are required to stop at PSNS & IMF Pass & ID Office with proof of a valid, current
Driver’s License, vehicle registration, and proof of insurance, prior to receiving access.
h. All Contractor Employees shall adhere to PSNS&IMF NOTICE 5239 PORTABLE ELECTRONIC
DEVICE (PED) GUIDANCE (Attachment J-N/A).
3. NAVAL BASE KITSAP, BANGOR OPERATIONAL AREA (OA) & WATERFRONT RESTRICTED
AREAS:
Note: PSNS & IMF CIA “Green” badges shall not provide access to the NBK Bangor Operational Area. PSNS &
IMF CIA higher level badges (i.e. Red or Yellow) shall provide access to the OA, but will not provide access to the
Bangor Waterfront Restricted Areas.
a. For contractor employees that are required access to the OA & Waterfront Restricted Area, they will be required to obtain the following:
1. A CAC, NCACS card, or a single day pass per paragraph 1.a. above.
2. The contractor shall prepare and submit a Visit Request via the Badge Authorization and Visit
Request (BAVR) at https://bavr.cnrnw.navy.mil for each contractor employee. The Visit Request application must be received five (5) working days prior to the job start date. Insure that you complete all sections including PSNS
& IMF sponsor Sandra Ball and contract number into BAVR.
3. The contractor shall prepare and submit a Visit Request form, Attachment J-NA for each contractor employee to Commander, Navy Region Northwest (CNRNW), Pass &ID Office, Bangor, to receive a
CNRNW badge.
b. For Vehicle Access, contractors shall provide a valid, current Driver’s License, vehicle registration, and proof of insurance to the Pass & ID Office of the Naval Installation.
c. Cell phones equipped with cameras are PROHIBITED in the Waterfront Restricted Areas.
4. NAVAL BASE KITSAP, KEYPORT (NAVAL UNDERSEA WARFARE CENTER DIVISION,
KEYPORT):
a. If contractor employees are required access to the Keyport, they will be required to obtain a CAC, NCACS card, or a single day pass per paragraph 1.a. above.
5. NAVAL STATION EVERETT:
a. If contractor employees are required access to the Naval Station Everett, they will be required to obtain a
CAC, NCACS card, or a single day pass per paragraph 1.a. above.
https://bavr.cnrnw.navy.mil/
b. For Pier Access to vessels, the contractor shall prepare and submit a Visit Request via the BAVR as identified in paragraph 3.c. above.
HQ C-2-0023 EXCLUSION OF MERCURY (NAVSEA) (MAY 1998)
Mercury or mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.
HQ C-2-0004 ACCESS TO THE VESSEL(S) (AT) (NAVSEA) (JAN 1983)
Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.
HQ C-2-0005 ACCESS TO VESSELS BY NON U.S. CITIZENS (NAVSEA) (DEC 2005)
(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by
COMNAVSEA or his designated representative that such access should be permitted in the best interest of the
United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST
5500.3 (series) in effect on the date of this contract or agreement.
(b) If the Contractor desires to employ non U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control
Plan (ACP) which shall contain as a minimum, the following information:
(1) Badge or Pass oriented identification, access, and movement control system for non U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.
(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.
(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.
(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.
(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.
(2) Contractor’s plan for ascertaining citizenship and for screening employees for security risk.
(3) Data reflecting the number, nationality, and positions held by non U.S. citizen employees, including procedures to update data as non U.S. citizen employee data changes, and pass to cognizant CAO.
(4) Contractor’s plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.
(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.
(c) To request approval for non U.S. citizens of hostile and/or communist controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22 M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by
Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for above group. Approval of ACP's for access of non-
U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non-
U.S. citizens of hostile and/or communist-controlled countries.
(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved
ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the
CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated or default in accordance with the clause entitled "DEFAULT (FIXED-PRICE SUPPLY AND SERVICE)" (FAR
52.249-8), "DEFAULT (FIXED-PRICE RESEARCH AND DEVELOPMENT)" (FAR 52.249-9) or
"TERMINATION (COST REIMBURSEMENT)" (FAR 52.249-6), as applicable.
(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.
(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.
(g) The same restriction as in paragraph (g) above applies to other non-U.S. citizens who have access to the
Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.).
HQ C-2-0006 ADDITIONAL PROVISIONS RELATING TO GOVERNMENT PROPERTY (NAVSEA) (SEP 2009)
(a) For purposes of paragraph (h) of the clause entitled "GOVERNMENT PROPERTY" (FAR 52.245-1) in addition to those items of property defined in that clause as Government Property, the following shall also be included within the definition of Government Property:
(1) the vessel;
(2) the equipment on the vessel;
(3) movable stores;
(4) cargo; and
(5) other material on the vessel
(b) For purposes of paragraph (b) of the clause entitled "GOVERNMENT PROPERTY", notwithstanding any other requirement of this contract, the following shall not be considered Government Property:
(1) the vessel;
(2) the equipment on the vessel;
(3) movable stores; and
(4) other material on the vessel
HQ C-2-0007 APPROVAL BY THE GOVERNMENT (AT) (NAVSEA) (JAN 1983)
Approval by the Government as required under this contract and applicable specifications shall not relieve the
Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
HQ C-2-0014 CONTRACTOR'S PROPOSAL (NAVSEA) (MAR 2001)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in Proposal TO BE IDENTIFIED UPON AWARD dated TO BE
IDENTIFIED UPON AWARD in response to this PSNS&IMF solicitation.
(b) The technical volume(s) of the Contractor's proposal is incorporated by reference and hereby made subject to the provisions of the "ORDER OF PRECEDENCE" (FAR 52.215-8) clause of this contract. Under the "ORDER OF
PRECEDENCE" clause, the technical volume of the Contractor's proposal referenced herein is hereby designated as item (f) of the clause, following "the specification" in the order of precedence.
HQ C-2-0016 DEPARTMENT OF LABOR SAFETY AND HEALTH STANDARDS FOR SHIP REPAIR
(NAVSEA) (SEP 1990) (MODIFIED) (SEP 2012)
Attention of the Contractor is directed to the Occupational Safety and Health Act of 1970 (29 USC 651-678), and to the Safety and Health Regulations for Ship Repairing (29 CFR 1915), promulgated under Public Law 85-742, amending Section 41 of the Longshoremen's and Harbor Workers' Compensation Act (33 USC 941), and adopted by the Department of Labor as occupational safety or health standards under Section 6(a) of the Occupational Safety and Health Act of 1970 (See 29 CFR 1910.15). These regulations apply to all ship repair and related work, as defined in the regulations performed under this contract on the navigable waters of the United States including any dry dock and marine railway. Nothing contained in this contract shall be construed as relieving the Contractor from any obligations which it may have for compliance with the aforesaid regulations.
HQ C-2-0018 DISPOSAL OF SCRAP (NAVSEA) (JAN 2008)
(a) All Government scrap resulting from accomplishment of any job order is the property of the Contractor to be disposed as it sees fit. Scrap is defined as property that has no reasonable prospect of being sold except for the recovery value of its basic material content. The determination as to which materials are scrap and which materials are salvage, will be made, or concurred in, by the duly appointed Property Administrator for the cognizant SUPSHIP or RMC Office.
(b) As consideration for retaining the Government's scrap, the Contractor's price for the performance of the work required herein shall be a net price reflecting the value of the Government scrap.
(c) This requirement is not intended to conflict in any way with the clauses of this contract entitled
"PERFORMANCE" (DFARS 252.217-7010) or "GOVERNMENT PROPERTY" (FAR 52.245-1) under the Master
Contract in effect at the time of job order award, nor does it relieve the Contractor of any other requirement under such clauses.
HQ C-2-0028 GOVERNMENT SURPLUS PROPERTY (NAVSEA) (SEP 1990)
No former Government surplus property or residual inventory resulting from terminated Government contracts shall be furnished under this contract unless (i) such property is identified in the Special Contract Requirements or (ii) is approved in writing by the Contracting Officer. Notwithstanding any such identification in the Special Contract
Requirements or approval by the Contracting Officer, the Contractor agrees all items or components described in this requirement shall comply in all respects with the specifications contained herein.
HQ C-2-0029 HEAVY WEATHER PLAN (NAVSEA) (JUN 1999)
In order to ensure that Naval vessels and material are protected during gales, storms, hurricanes and destructive weather, the Contractor is required to have a written Heavy Weather Plan (HWP) which assigns responsibilities and prescribes actions to be taken on the approach of and during heavy weather conditions as delineated in NAVSEA
Standard Item (SI) 009-69. In accordance with SI 009-69, the Contractor shall furnish to the cognizant Shipbuilding, Conversion and Repair, U.S. Navy, a copy of such HWP, and shall make such changes in the plan as the Supervisor considers necessary and reasonable to protect and care for vessels and machinery and equipment to be installed therein.
In the event the Supervisor directs the Contractor to implement the HWP pursuant to SI 009-69 the Contractor may submit to the Contracting Officer a request for reimbursement for costs resulting from such actions together with any documentation that the Contracting Officer may reasonably require. The Government shall reimburse the Contractor for all reasonable, allowable and allocable costs resulting from the Contractor's implementation of the HWP based on such Government direction.
HQ C-2-0030 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT (FIXED-PRICE) (NAVSEA)
(SEP 2009)
(a) Contract Specifications. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications set forth in Section C.
(b) Contract Drawings and Data. The Government will furnish contract drawings, design agent drawings, ship construction drawings, and/or other design or alteration data cited or referenced in Section C or in the contract specification as mandatory for use or for contract performance.
(c) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material enumerated on NAVSEA Form 4205/19 or
Schedule A, as applicable, attached to the contract. The Government shall furnish only the GFI identified on the
NAVSEA Form 4340/2 or Schedule C, as applicable, attached to the contract. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI on the
NAVSEA Form 4340/2 or Schedule C, as applicable, as follows:
(1) The Contracting Officer may at any time by written order:
(i) delete, supersede, or revise, in whole or in part, data listed or specifically referenced in NAVSEA
Form 4340/2 or Schedule C, as applicable; or
(ii) add items of data or information to NAVSEA Form 4340/2 or Schedule C, as applicable; or
(iii) establish or revise due dates for items of data or information in NAVSEA Form 4340/2 or Schedule
C, as applicable.
(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract price and delivery schedule in accordance with the procedures provided for in the clause of this contract entitled "CHANGES--FIXED-PRICE"
(FAR 52.243-1).
(d) Except for the Government information and data specified by paragraphs (a), (b), and (c) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI listed on the
NAVSEA Form 4340/2 or Schedule C, as applicable, the clause of this contract entitled "GOVERNMENT
PROPERTY" (FAR 52.245-1) or "GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES "
(FAR 52.245-2), as applicable, or any other term or condition of this contract.
(e) Referenced Documentation. The Government will not be obligated to furnish Government specifications and standards, including Navy standard and type drawings and other technical documentation, which are referenced directly or indirectly in the contract specifications set forth in Section C and which are applicable to this contract as specifications. Such referenced documentation may be obtained:
(1) From the ASSIST database via the internet at http://assist.daps.dla.mil/; or
(2) By submitting a request to the
Department of Defense Single Stock Point (DoDSSP)
Building 4, Section D
700 Robbins Avenue
Philadelphia, Pennsylvania 19111-5094
Telephone (215) 697-6396
Facsimile (215) 697-9398.
Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.
HQ C-2-0033 LIMITATION OF LIABILITY - HIGH VALUE ITEMS (NAVSEA) (JUN 1992)
The following items are subject to the clause of this contract entitled "LIMITATION OF LIABILITY--HIGH
VALUE ITEMS" (FAR 52.246-24): ITEMS LISTED IN STATEMENT OF WORK PARAGRAPH 1.1.
HQ C-2-0044 PROTECTION OF THE VESSEL (NAVSEA) (SEP 1990)
http://assist.daps.dla.mil/
(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been off-loaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free
Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.
(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirty-five degrees
Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipe-lines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected by the
Contractor from frost damage by applied heat through the use of a salamander or other proper means.
(c) The work shall, whenever practicable, be performed in such manner as not to interfere with the work performed by military personnel attached to the vessel, and provisions shall be made so that personnel assigned shall have access to the vessel at all times, it being understood that such personnel will not unduly interfere with the work of the
Contractor's workmen.
(d) The Contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by its employees, or the work performed by the Contractor in accordance with this contract, and at the completion of such work shall remove all rubbish from and about the site of the work, and shall leave the work in its immediate vicinity "broom clean", unless more exactly specified by the Supervisor.
HQ C-2-0059 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)
If, during the performance of this or any other contract, the contractor believes that any contract contains outdated or different versions of any specifications or standards, the contractor may request that all of its contracts be updated to include the current version of the applicable specification or standard. Updating shall not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Procuring Contracting
Officer. Any approved alternate specifications or standards will be incorporated into the contract.
RMC C-2-0009 OVER AND ABOVE WORK (DEC 1991)
(1) The contractor is tasked with identifying needed repairs and recommending corrective action during contract performance for those deficiencies discovered which are not covered by the basic contract or subsequent contract modifications (supplemental agreements). Needed repairs and corrective action to be considered under this provision will be submitted to the Government in the form of an Inspection Deficiency Report (IDR); also known as a "Work Request" within the meaning of the clause of this contract entitled "over and Above Work" (DFARS
252.217-7028). It is anticipated that the estimated costs for these series of related changes will exceed $100,000.
Therefore, the provisions of FAR 52.243-6, Change Order Accounting, are hereby invoked.
(2) The following provisions apply to "Over and Above Work Orders":
(a) General. Orders for supplies or services may be issued by the ACO at any time during the contract period, including any extension thereof. Any amounts shown in Section B for over and above work are estimated amounts only and are subject to upward or downward adjustment by the ACO. It is understood and agreed that the Government has no obligation under this contract to issue any orders.
(b) Memorandum of Agreement (MOA). The mutually agreed to procedures discussed in paragraph (b) of the clause entitled "Over and Above Work" (DEC 1991) (DFARS 252.217.7028) are addressed in paragraph (d) below. In addition, the following shall also apply for that work authorized to proceed prior to negotiating a price:
(i) Within ten days after the Contractor receives notification to proceed with performance for which a price has not been negotiated and the Contractor has not submitted a price proposal for purposes of negotiation, the Contractor shall submit to the Government a proposal.
(ii) The Contracting Officer may grant an extension of this period if the Contractor requests it within the ten day period.
(iii) If the circumstances permit it, the Contracting Officer may accept and negotiate a price proposal at any later time prior to final payment under the job order, except that the Contractor may not receive profit on a payment under a late request.
(c) Limitation of Government Liability.
(i) The limitation of Government liability, which shall be the maximum amount that the
Government will be obligated to pay the Contractor for performance of the order until the order is definitized, shall be that amount identified on the authorization for the contractor to proceed with performance. The Contractor is not authorized to make expenditures or incur obligations exceeding the limitation of Government liability set forth in the authorization. If such expenditures are made, or if such obligations are incurred, they will be at the Contractor's sole risk and expense. Further, the limitation of liability shall be the maximum Government liability if the order is terminated.
(ii) If at any time the Contractor believes that its expenditure under an undefinitized Over and Above Work Order authorization will exceed the limitation of Government liability, the Contractor shall so notify the Contracting Officer, in writing, and propose an appropriate increase in the limitation of Government liability of such authorization. Within five days of such notice, the Contracting Officer will either (i) notify the
Contractor, in writing, of such an appropriate increase, or (ii) instruct the Contractor how and to what extent the work shall continue, provided however, that in no event shall the Contractor be obligated to proceed with work on an undefinitized authorization beyond the point where its costs incurred plus a reasonable profit thereon exceed the limitation of Government liability, and provided also that in no event shall the Government be obligated to pay the
Contractor any amount in excess of the limitation of Government liability specified in any such order prior to establishment of firm prices.
(d) Over and Above Work Procedures. The following administrative procedures for implementing these provisions apply.
1. The Contractor will identify needed repairs and recommend corrective action during contract performance for those deficiencies discovered which are not covered by the basic contract or subsequent contract modifications
(supplemental agreements). Needed repairs and corrective action to be considered under this provision will be submitted to the Government in the form of an Inspection Deficiency Report (IDR).
2. As a minimum, the IDR will include the following:
(a) Identify contract number;
(b) Serialized by IDR number'
(c) Identification of the applicable Work Item number;
(d) Description of the discrepancy not covered by the basic contract or subsequent contract modifications;
(e) Specific location of the discrepancy;
(f) Recommendation for corrective action'
(g) Estimate of the direct labor hours (to include any administrative time in direct support of the contract (i.e., allocable, overtime, double time, delay and disruption hours, etc.), subcontractor costs and material costs required to correct the discrepancy. This information is to be submitted as an attachment to the IDR.
h) If sufficient information is available, attach a detailed Change Order Price Analysis (COPA), in sufficient detail with which to negotiate a firm-fixed-price (FFP) contract modification, in lieu of estimates;
(i) Annotate the IDR, indicate whether the attached price information represents a
COPA (to be negotiated) or estimates; and
(j) Identify any related changes, if any, to the contract delivery schedule (to include internal milestone dates) located in Standard Work Item 042-01-001, Scheduling, Progressing, Material Status and
Associated Reports. If none, so state.
3. Required work will not be "split" into several IDRs to avoid any given dollar threshold (audit requirement, technical advisory report (TAR), etc.
4. To the maximum extent possible, all efforts will be made to negotiate a FFP contract modification prior to the start of work. Negotiations will be conducted in accordance with established procedures.
5. The Administrative Contracting Officer (ACO) will initial all IDR responses which authorize the Contractor to proceed with corrective action prior to the price being negotiated. In addition, the authorization will include a dollar amount which represents the limitation of Government liability. Written authorization to proceed, which includes the limitation of Government liability, must be received by the Contractor from the ACO before performance.
6. Upon receipt of an IDR response initialed by the ACO, but not negotiated, the Contractor shall diligently proceed with performance. The Contractor shall also prepare detailed COPA for submission to the ACO within ten working days. The Contractor further agrees that the total proposed price of the COPA will not exceed the estimate submitted with the IDR.
7. All work authorized and performed as a result of this tasking will be funded under their respective production
CLINs following negotiation of required work effort and issuance of formal contract modifications in Section B of the contract. No invoices will be submitted against CLIN 0002 and CLIN 0002 will not be incorporated into the
Work in Progress Report (WKP 500) for purpose of calculating percentage of work completed. The WKP 500 will always show zero (0) progress for the over and above work CLIN. Work request proposals will be negotiated and definitized by use of a Standard Form (SF) 30. Provisions of DFARS 252.217-7007, Payments (DEC 1991), will then apply for invoicing.
8. The COPA will be negotiated using established procedures. Failure to agree upon a reasonable price shall be considered a question of fact subject to the "DISPUTES" clause of the contact.
9. Following negotiation of the COPA and preparation of the contract modification (SF 30), the Government shall update the Work in Progress Report (WKP 500) to reflect actual work performed as of the negotiation settlement date.
10. The contractor shall segregate and track costs in accordance with the Change Order Accounting provisions of the contract. Any work authorized to proceed prior to reaching agreement on a negotiated price, or which is not negotiated prior to completion of performance, will be negotiated based on actual costs incurred ("booked costs" for the modification being negotiated). Actual incurred costs submitted by the Contractor will be subject to review and verification (as determined by the ACO) by the Defense Contract Audit Agency (DCAA).
11. At the end of the contract performance, and after all Over and Above Work has been definitized, a bilateral SF
30 will be prepared and executed deobligating unused funding on the CLINS.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-16 Responsibility For Supplies APR 1984
HQ E-2-0002 ADDITIONAL PROVISIONS RELATING TO CORRECTION OF DEFECTS (NAVSEA) (OCT
1990)
In case any work done or materials or supplies furnished by the Contractor under this contract for any vessel, or the equipment thereof, shall within sixty (60) days of delivery of the vessel to the Government, or the date of final acceptance, whichever occurs first, prove defective or deficient, such defects or deficiencies shall, as required by the
Government, be corrected or repaired by the Contractor to the satisfaction of the Contracting Officer; provided, however, that with respect to any individual work item which is incomplete or deficient at the time of delivery or acceptance, the Contractor's obligation under this requirement to correct or repair such deficiency shall extend sixty
(60) days from the date of such correction or repair, whichever occurs first. The Contractor shall be entitled to allowable costs for corrections or repairs performed in accordance with this requirement but shall not be entitled to any additional fee for such work.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 28-AUG-2015 2 N/A
0002 28-AUG-2015 N/A
52.211-17 Delivery of Excess Quantities SEP 1989
52.242-15 Stop-Work Order AUG 1989
52.247-34 F.O.B. Destination NOV 1991
RMC F-1-0002 PLACE OF PERFORMANCE (RMC)
(a) Work on the Vessel under this contract shall be performed at: CONTRACTOR’S FACILITY; TO BE
IDENTIFIED UPON AWARD
(b) Drydocking shall be accomplished at: N/A
(c) All other work shall be accomplished at: N/A
RMC-F-1-0003 DELIVERY / REDELIVERY SCHEDULE (RMC)
The Government agrees to deliver the Vessel to the Contractor at TO BE IDENTIFIED UPON AWARD no later than the following "Commencement Date". The Contractor agrees to redeliver the Vessel to the Government at:
NAVAL SUBMARINE BASE BANGOR on the following “Completion Date".
CLIN VESSEL COMMENCEMENT DATE COMPLETION DATE
0001 LET HOUSES (2 EACH) 11 JUN 2015 28 AUG 2015
Dates specified above represent the availability dates of the Vessel. The “Vessel” in this solicitation is the LET
House and all associated equipment.
Section G - Contract Administration Data
252.204-0001 Line Item Specific: Single Funding SEP 2009
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through
WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
INVOICE & RECEIVING REPORT (COMBO)
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and
“Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
DESTINATION / DESTINATION
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N68732
Issue By DoDAAC N4523A
Admin DoDAAC N4523A
Inspect By DoDAAC N4523A
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N4523A
Accept at Other DoDAAC N/A
LPO DoDAAC N4523A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .