N4215823QN043 Amendment 1.pdf

PDF 587 KB Posted

Attached to
Calibration, Certification and Warranty Renewals
Solicitation number
N4215823QN043
Issued by

View the file

Other files

File Type Posted
GFP_Attachment.xlsx XLSX spreadsheet
N4215823QN043 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N4215823RC30642

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

I. Update to the statement of w ork II. Extend the due date

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4215823QN043

X 9B. DATED (SEE ITEM 11)

17-May-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-May-2023

CODE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4215823QN043

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-May-2023 10:00 AM to 22-May-2023 03:00 PM.

The following have been modified:

STATEMENT OF WORK

“Calibration and Warranty Renewals of NNSY FARO Equipment”

1.0 INTRODUCTION

ORGANIZATION: Mid-Atlantic Regional Calibration Center (MARCC), NNSY Code 137.

1.1 Objective/Scope: The objective of this task is to have the vendor, FARO Technologies (OEM), perform B89 Calibration Services and Warranty Renewals. Equipment will be sent in stages throughout the period of performance.

FARO Technologies Inc.

250 Technology Park Lake Mary, FL 32746-7115 Phone: 407-333-9911

Return Address:

ATTEN: Calibration Lab Code 137 Norfolk Naval Shipyard (NOB/7F) Bldg. 276 Beatty Street Portsmouth, VA 23709-1031

1.2 Equipment Description/Specifications: These FARO products are used by NNSY X56 (Nuclear) to perform work on the waterfront.

1.3 Maintenance/Service Required:

MODEL SERIAL#

NOME

N

SERVICE

DESC.

QUOTE# FARO ITEM#

VANTAGE V01001304519

Laser Tracker

ASME

B89.4.19 Calibration

1721025 ACC-LT-B89

VANTAGE E6 V30003108401

Laser Tracker

ASME

B89.4.19 Calibration

1721024 960-02589

VANTAGE S6 V30001907534

Laser Tracker

ASME

B89.4.19 Calibration

1721024 960-02589

VANTAGE S6 V30001907530

Laser Tracker

ASME

B89.4.19 Calibration

1721024 960-02589

VANTAGE E V20003706648

Laser Tracker

ASME

B89.4.19 Calibration

1721024 960-02589

X X01000702238 Laser Tracker

ASME

B89.4.19 Calibration

1721032 ACC-LT-B89

X X01000702240 Laser Tracker

ASME

B89.4.19 Calibration

1721032 ACC-LT-B89

PLATINUM P08-05-05-03941

FARO

Arm

FARO ARM

Certification

1721035 ACC-ARM

EDGE E09-05-13-11058

FARO

Arm

FARO

Certification

1721035 ACC-ARM

EDGE E09-05-13-11062

FARO

Arm

FARO

Certification

1721035 ACC-ARM

EDGE E09-05-16-14040

FARO

Arm

FARO

Certification

1721035 ACC-ARM

GAGE

F04-B2-12- 10439

FARO

Arm

FARO Gage Certification

1721035 ACC-GAGE

GAGE

F04-B2-12- 10383

FARO

Arm

FARO Gage Certification

1721035 ACC-GAGE

PRIME

R12-02-16- 14293

FARO

Arm

FaroArm Certification

1721027 ACC-ARM

PRIME

R06-02-16- 14296

FARO

Arm

FaroArm Certification

1721027 ACC-ARM

LLP HD LLP001618845

Laser Line Probe

Laser Line Probe Certification

1721035 ACC-LLP

LLP LLP001308666

Laser Line Probe

Laser Line Probe Certification

1721035 ACC-LLP

GAGE

F04-B2-12- 10383

FARO

Arm

PCB Assy, Button & LED Board

20448698 10015

GAGE

F04-B2-12- 10383

FARO

Arm

Selection, Center, 4ft, SVC, KEYED

20448698 12921-001

GAGE

F04-B2-12- 10383

FARO

Arm

Service Hours 20448698 SERVICE_LABOR

EDGE E09-05-13-11058

FARO

Arm

Warranty Renewal

1721035 SV1-ARM-1Y-R

EDGE E09-05-13-11062

FARO

Arm

Warranty Renewal

1721035 SV1-ARM-1Y-R

LLP HD LLP001618845

Laser Line Probe

Warranty Renewal

1721035 SV1-LLP-1Y-R

LLP LLP001308832

Laser Line Probe

Warranty Renewal

1721035 SV1-LLP-1Y-R

GAGE

F04-B2-12- 10383

FARO

Arm

Warranty Renewal

20448698 ACC-GAGE

LLP LLP001308666

Laser Line Probe

Warranty Renewal

1721035 SV1-LLP-1Y-R

EDGE E09-05-16-14040

FARO

Arm

Warranty Renewal

1721035 SV1-ARM-1Y-R

LLP LLP001308832

Laser Line Probe

Warranty Renewal

1721035 ACC-LLP

EDGE E09-05-16-14039

FARO

Arm

Warranty Renewal

1721027 SV2-ARM-1Y-R

EDGE E09-05-16-14292

FARO

Arm

Warranty Renewal

1721027 SV2-ARM-1Y-R

PRIME

R06-02-16- 14295

FARO

Arm

Warranty Renewal

1721027 SV2-ARM-1Y-R

PRIME

R12-02-16- 14294

FARO

Arm

Warranty Renewal

1721027 SV2-ARM-1Y-R

LLP HD LLP001618497

Laser Line Probe

Warranty Renewal

1721027 SV2-LLP-1Y-R

LLP HD LLP001618500

Laser Line Probe

Warranty Renewal

1721027 SV2-LLP-1Y-R

LLP HD LLP001618843

Laser Line Probe

Warranty Renewal

1721027 SV2-LLP-1Y-R

PRIME

R12-02-16- 14293

FARO

Arm

Warranty Renewal

1721027 SV2-ARM-1Y-R

PRIME

R06-02-16- 14296

FARO

Arm

Warranty Renewal

1721027 SV2-ARM-1Y-R

VANTAGE V01001304519

Laser Tracker

Warranty Renewal

1721025 SV1-3DOF-1Y-R

VANTAGE E6 V30003108401

Laser Tracker

Warranty Renewal

1721024 SV2-6DOF-1Y-R

VANTAGE S6 V30001907534

Laser Tracker

Warranty Renewal

1721024 SV2-6DOF-1Y-R

VANTAGE S6 V30001907530

Laser Tracker

Warranty Renewal

1721024 SV2-6DOF-1Y-R

VANTAGE E V20003706648

Laser Tracker

Warranty Renewal

1721024 SV2-3DOF-1Y-R

6PROBE 6PRB0201463

Tracker Probe

Warranty Renewal

1721024 SV2-6PRB-1Y-R

This equipment is not to be altered in any manner that affects its operating characteristics, controls, or external connections (if applicable). Normal adjustments required to bring the item into specification limits are permitted.

Calibration must be traceable to the one of the following via an unbroken chain of measurements:

-The National Institute of Standards and Technology -Natural Physical Constants (Intrinsic Standards) -Consensus Standards -National Standards of other countries which are correlated with U.S. National Standards

The calibration process used must result in a Test Accuracy Ratio or Test Uncertainty Ratio of 4:1 or greater, or a False Accept Risk of 2% or less, in accordance with the applicable paragraph(s) of ANSI/NCSL Z540.1 or later.

A calibration certificate must be provided which states the source of traceability and compliance with the above paragraph. It must also state whether or not the item was in-tolerance as received.

“As found” and “as left” measurement values are required either on or with the certificate of calibration.

Any deviation from the criteria mentioned in this section must be authorized by NNSY Code 137.2, Metrology Engineering. Use of a different vendor other than FARO Technologies must also be researched and approved by NNSY Code 137.2 Metrology Engineering.

Repair Work Requirements Repairs may be necessary but the extent of repairs will be unknown prior to the maintenance and calibration work defined in the statement of work. If it is discovered that repairs are needed, the contractor shall immediately provide a cost breakdown, (e.g. materials, labor, and travel) to the KO and TPOC for evaluation. Additional price information may be requested by the KO if needed to determine the repair work’s price is fair and reasonable. Any repair work will be issued on CLIN 0003 separately funded line item. No additional repair work will be authorized until funded by way of modification. Repair work is hereby determined to be within the scope of this contract however, the KO shall make a separate scope determination based on the extent of repairs needed and determination of price fair and reasonableness.

Warranty The purchasing of warranties for the items listed above cover repairs if needed and recalibration.

NORFOLK NAVAL SHIPYARD CONTRACTS DEPARTMENT – SERVICES CONTRACTS DIVISION

No instructions, either verbal or written, deviating from the terms and conditions of this order are effective or binding upon the Government unless authorized and formalized by contractual documents issued by the Contracting Officer. On any problems concerning the order, please contact, CONTRACTING OFFICER, CODE 412

NORFOLK NAVAL SHIPYARD CONTRACTS DEPARTMENT, SERVICE CONTRACTS DIVISION, BLDG.

65, 1ST FLOOR, PORTSMOUTH, VA 23709-5000, TELEPHONE: (757) 396-9829.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .