Attachment_2_-_Laydown_Area.pdf
PDF 387 KB Posted
- Attached to
- Dry Dock flooding equipment Federal contract opportunity
- Solicitation number
- N4215819Q0011
About this file
Attachment 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4215819Q0011_AMEND_0001.pdf | ||
| Attachment_1_-_Equipment_Specifications.pdf | ||
| N4215819Q0011.pdf | ||
| Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C A
P S
T A
N
Light Pole
Transformer
B u i l d i n g
Bollard
E x i s t i n g
U t i l i t y
M a n i f o l d
E x i s t i n g
C o n c r e e
P d
E l e c t r i c l
U i l i t y
E l i z a b e h
R i v e r
Drydock 8
E q u i p m e n t
L a y d o w n
A r e a
Discharge Pipeline Route
Concrete Block
Concrete Block
Existing 18" Piping
P l a c e
P u m p s
H e r e
Flanged Connection Here to
Allow for Removal of Pipe Section
14'-6"
49°
21'-10"
Norfolk Naval Shipyard
Dry Dock No. 8 Temporary Flooding System
Attachment 2
38'
30'
115'
14'-6"
60'
20'
This hatched area shows the preferred pipeline route to minimize interference with ship overhaul operations
Laydown Area with
Physical
Obstructions
Dimensions of Discharge Pipeline Route
(obstructions removed for clarity)
This is the space available to place pump motor(s) / drive unit(s)
River
This is the optimum location to place the pumps. The pumps must be adjacent to the river and out of the way of ship overhaul operations. Submersible pumps can be placed directly into the river at this location.
This section of pipeline will be temporarily removed while a ship enters the dock.
This is where the pipeline(s) will discharge into the dock
Pier Edge
AutoCAD SHX Text Guard shack
AutoCAD SHX Text Guard shack
| Sheets and Views |
| Flood Pumps CAD-Layout2 |
File details come from the government source that posted it.