SERVICE ORDER REQUEST - MSC SSU GUAM
MAIN FEED PUMP SURVEY AND CALIBRATION
| VESSEL: |
| USS FRANK CABLE (AS-40) |
| Port Engineer: |
| ARSENIO QUEJADO |
| Phone |
| 671-339-5342/480-6500 |
| DATE: |
| 13AUG2019 |
| SSU JOB# |
| FCB20-008 |
VRR#
CASREP#
| 1.0 | ABSTRACT: |
| 1.1 | This item describes the requirement to provide Coffin Turbo Pump Field Technician to perform 5 YEARS inspection and Surveys. |
| 2.0 | REFERENCES: |
| 2.1 | Coffin Turbo Pump Instruction Manual |
| 3.0 | ITEM LOCATION/DESCRIPTION: |
| 3.1 | Location/Quantity: Fire Room (7-123-0-E) |
| 3.2 | Item Description/Manufacturer's Data: QTY: QTY: 2 EA Turbine-Driven Centrifugal Boiler Feed Water Pump Coffin Mode “D |
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES:
| 5.1 | The contractor and subcontractors must consult Military Sealift Command’s General Technical Requirements, (GTR’s), to determine applicability to this work item. The contractor and all subcontractors must comply with all applicable GTR requirements. |
| 5.2 | Contractor shall obtain and maintain base/pier access all throughout the duration of Period of Performance (POP). |
| 5.3 | Contractor shall submit a Ships Access List within 96 hours prior to start of POP for all contractor and sub-contractor personnel all throughout the duration of POP. |
| 5.4 | Contractor shall notify MSCREP and ABS Surveyor no later than 24 HR to witness all inspection and testing specified in this Work Item. |
| 5.5 | MSCREP consist of Port Engineer and Chief Engineer or his designated representative. |
6.0 QUALITY ASSURANCE REQUIREMENTS:
6.1 The requirements of this Work Item shall be accomplished to the satisfaction of the MSCREP.
6.2 The requirements of this Work Item shall be accomplished in accordance with current Regulatory Body rules and regulations.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Provide the services of a Qualified Coffin Turbo Pump Field Technician to accomplish 5-Year Inspections and Surveys, to include observing the pumps in full operation, disassembly, inspection and replacement of internal component of the pumps. In addition, remove and factory test and reinstall in accordance with reference 2.1.
7.1.1 Submit a type written report to the MSCREP listing the results of the test and inspection work accomplished in 7.1.1 in accordance with reference 2.1.
7.1.2 Contractor to provide the following OEM materials:
| Item # |
| Item Name |
| Part # |
| Quantity |
| 7.1.3.1 |
| Cotter Pin |
| 17318 |
| 4 |
| 7.1.3.2 |
| Thrust Bearing Lock Washer |
| 17446 |
| 2 |
| 7.1.3.3 |
| Thrust Bearing |
| 17458 |
| 2 |
| 7.1.3.4 |
| Inner Separator |
| 22474 |
| 2 |
| 7.1.3.5 |
| Outer Separator |
| 22474 |
| 2 |
| 7.1.3.6 |
| Thrust Bearing Cover Gasket |
| 18309 |
| 2 |
| 7.1.3.7 |
| Thrust Bearing Deflector |
| 17408 |
| 2 |
| 7.1.3.8 |
| Main Bearing |
| 17056 |
| 4 |
| 7.1.3.9 |
| Main Bearing Deflector |
| 17066 |
| 4 |
| 7.1.3.10 |
| Main Bearing Cover Gasket |
| 18306 |
| 4 |
| 7.1.3.11 |
| Main Bearing Retainer |
| 19311 |
| 4 |
| 7.1.3.12 |
| LO Sump Cover Gasket |
| 17299 |
| 2 |
| 7.1.3.13 |
| Turbine Stator Bolt Gasket |
| 18347 |
| 10 |
| 7.1.3.14 |
| Turbine Shaft Gland |
| 18565 |
| 2 |
| 7.1.3.15 |
| Turbine Rotor Sleeve |
| 17065 |
| 2 |
| 7.1.3.16 |
| Turbine Cover Gasket |
| 19370 |
| 2 |
| 7.3.1.17 |
| L.H Wear Ring |
| 17415 |
| 2 |
| 7.3.1.18 |
| R.H. Wear Ring |
| 17414 |
| 2 |
| 7.3.1.19 |
| L.H. Impeller Inlet |
| 17623 |
| 2 |
| 7.3.1.20 |
| R.H. Impeller Inlet |
| 17419 |
| 2 |
| 7.3.1.21 |
| Mechanical Seal |
| 19958 |
| 4 |
| 7.3.1.22 |
| Inboard Shaft Sleeve |
| 19967 |
| 2 |
| 7.3.1.23 |
| Outboard Shaft Sleeve |
| 19969 |
| 2 |
| 7.3.1.29 |
| Upper Guide |
| 21795-2 |
| 2 |
| 7.3.1.30 |
| Oil Filter Cartridge |
| 25013-6 |
| 4 |
| 7.2 | Inspection/Test: | |
| 7.2.1 | Accomplish and Operational Test of each pump in the presence of MSC Representative, Chief Engineer and ABS Surveyor. | |
| 7.3 | Manufacturer's Representative: | |
| 7.3.1 | COFFIN TURBO PUMP INC | |
| 326 South Dean Street | |
| Englewood, NJ 07631 | |
| POC: Joe Motisi | |
| | Phone: +1-201-568-4700 x257 |
Fax: +1-201-568-4716 Mobile: +1-973-296-5340 Email: jmotisi@coffinpump.com
8.0 GENERAL REQUIREMENTS:
| 8.1 | POP: 21 Oct – 27 Nov 2019. |
| 8.2 | Location: Uniform Pier, Naval Base Guam. |
| 8.3 | Shipping Address for Materials listed in 7.1.3: |
| MSC SSU Guam |
| ATTN Arsenio Quejado |
NAVY BASE GUAM
BLDG 3110, K1 WHSE
SANTA RITA GU 96915
FCB20-007-2