SOW,_T-AKE2,_SO-18-002;_MDE_NO.__3,_12000_Hr._Servicing_and_Overhaul,_16....doc

DOC document 94 KB Posted

Attached to
USNS SACAGAWEA No. 3 MDE 12K SERVICING
Solicitation number
N4044618Q0006
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
COMBO_18Q0006.docx DOCX document
WD_15-5693_REV_4.docx DOCX document
MEMO_TO_LIMIT_SOURCES_REDACTED.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SACAGAWEA

(T-AKE 2)

MACHINERY, PROPULSION

Service Order SO-18-002

16 Oct 2017

ITEM NO. SO-18-002

Category “A”

MSC/N756/ADT

NO. 3 Main diesel engine 12,000 hr. ServicING and Overhaul

1.0 ABSTRACT

1.1 This item describes providing technical services for the No. 3 Main Diesel Engine (MDE) 12,000 hr. overhaul and turbocharger servicing.

2.0 REFERENCES:

2.1 T/M T9233-CF-IMC-010; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume B1, Engine Operating Instructions. (Available Onboard)

2.2 T/M T9233-CF-IMC-020; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume B2, Engine Working Instructions. (Available Onboard)

2.3 T/M T9233-CF-IMC-040; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume B3, Spare Parts. (Available Onboard)

2.4 T/M T9233-CF-IMC-070; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume E1-E4, Engine Operating Instructions. (Available Onboard)

2.5 T/M T9233-CF-IMC-030; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volumes C1, C2, C3, Turbocharger Operating and Working Instructions/Spare Parts Catalog (Available Onboard)

2.6 T/M T9233-CF-IMC-060; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volumes B6, C6, Engine and Turbocharger Spare Parts and Tools(Available Onboard)

2.7 T-AKE Class Pre-underway Testing Requirements

3.0 ITEM LOCATION AND DESCRIPTION:

3.1 Location/Quantity/Contractor Supplied Material.

3.1.1 Location: Main Machinery Room 5-66-0

3.1.2 Quantity: One (1) MDE No. 3

3.2 Item Description/Manufacturer's Data:

-MAN B&W 9L 48/60 Diesel Engines (9 cylinder)

-Serial No. 939870R9L2 - MDE No. 3

3.2.1 Bill of Materials:

3.2.1.1 Contractor is to review this statement of work and provide any additional tooling, rigging and parts not provided as GFM.

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIALS/ SERVICES:

4.1 Complete 12,000 Hour Overhaul and Maintenance Kit for 9 cylinder MDE.

5.0 NOTES:

5.1 Contractor to provide a new 12K overhaul kit (p/n: M12701660) and ship to the following:

N32205 MSC W143 WAREHOUSE

1960 GILBERT ST., DWY 10

NORFOLK, VA 23511

(757) 897-2538

ATTN: TONY THOMPSON

FOR USNS SACAGAWEA -SHORE BASED SPARES

5.2 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.

5.3 The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.

5.4 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

5.5 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

5.6 Performance Period: 27 Nov through 23 Dec 2017

5.7 Performance Location: Saipan, Northern Mariana Islands

5.8 Port Engineer Contact information:

Tony Thompson

Port Engineer

USNS SACAGAWEA (T-AKE 2)

757.443.0878 Office

757.439.6353 Cell

anthony.d.thompson2@navy.mil

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK:

7.1 Provide the service of authorized MAN OEM reps and support personnel needed to perform the engine maintenance identified in the Statement of Work. The OEM Reps shall be Sr. Service Tech Reps experienced with MAN B&W 48/68 engines. All work shall be performed/overseen by authorized MAN OEM Reps.

7.2 Ship’s Force will provide special tools as required. OEM reps should provide additional tools to perform overhauls concurrently as required. OEM reps to provide a cylinder honing tool.

7.3 All maintenance shall be performed in accordance with OEM recommended practices and procedures.

7.4 Contractor will provide support to perform the following MDE maintenance items taken from reference 2.1 Chapter 4.7 maintenance schedule (12,000 hrs.) listed in Table 1:

Table 1

Ref 2.1 Maintenance Schedule Serial Number
Category
Job Description
Work Card
Scope of Work
009
Fuel Oil System
Check overhaul buffer pistons
434
Main Diesel Engine No. 3
017
Lube Oil System
Check oil drainage of piston big-end and main bearings on the gear box and the turbocharger (visually)
none
Main Diesel Engine No. 3
018
Lube Oil System
Check oil drainage of camshaft bearings, injection pumps and valve gear in the rocker are casing (visually)
none
Main Diesel Engine No. 3
045
Compressed Air and Control air System
Control air system: Clean the water separator and air filter.
125
Main Diesel Engine No. 3
076
Measurement and Control Systems
Check measuring system for exhaust gas temperatures
none
Main Diesel Engine No. 3
082
Engine Foundations/Pipe Connections
Foundations: Check tension of bolts. Check stoppers, brackets and resilient elements for tight fit
012
Main Diesel Engine No. 3
083
Engine Foundations/Pipe Connections
Resilient Mount: Check amount of settling of resilient elements.
012
Main Diesel Engine No. 3
086
Engine Foundations/Pipe Connections
Bolted connections: Check for tight fit/proper preload.
000
Main Diesel Engine No. 3
092
Flexible Coupling/Turning Gear
Flexible Coupling: Check alignment and rubber elements
000
Main Diesel Engine No. 3
093
Flexible Coupling/Turning Gear
Coupling Bolts: Check for tight fit/proper preload
020
Main Diesel Engine No. 3
112
Running Gear/Crankshaft
Check the running gear (visually)
none
Main Diesel Engine No. 3
113
Running Gear/Crankshaft
Crankshaft: measure crankweb deflection
000
Main Diesel Engine No. 3
122
Main Bearing
Locating bearing: Check axial clearance
021
Main Diesel Engine No. 3
123
Main Bearing
Lower one bearing cap and inspect bearing shell. Check bolt loosening pressure
000, 012, 021
Main Diesel Engine No. 3
142
Big-end bearing
Remove and check one bearing shell. Check bolt loosening pressure
000, 030
Main Diesel Engine No. 3
152
Piston/Piston Pin
Remove, clean and check one piston. Check bolt loosening pressure
030, 034
Main Diesel Engine No. 3
162
Cylinder liner
Measure one cylinder liner
050
Main Diesel Engine No. 3
172
Cylinder Head
Remove, clean and check one cylinder head
055
Main Diesel Engine No. 3
202
Camshaft Drive
Check gearwheels, measure the backlash
100
Main Diesel Engine No. 3
216
Camshaft/Camshaft bearing/Cam Follower
Check Cams, rollers and cam follower (visually)
112, 209
Main Diesel Engine No. 3
217
Camshaft/Camshaft bearing/Cam Follower
Check bushes of cam follower on one cylinder
112
Main Diesel Engine No. 3
234
Inlet and Exhaust Valves
Remove two inlet valves. Check valve seats, Check valve rotators, replace worn parts
113

Main Diesel Engine No. 3

245
Inlet and Exhaust Valves
Remove two exhaust valves. Check valve seats.
114
Main Diesel Engine No. 3
263
Speed Governor
Mechanical governor and booster servo-motor: Replace oil and oil filter
140
Main Diesel Engine No. 3
264
Speed Governor
Mechanical governor: Check governor drive (drive shaft and gears)
140
Main Diesel Engine No. 3
266
Speed Governor
Electronic governor: Check pulse transmitter for dirt and verify that spacing is correct
none
Main Diesel Engine No. 3
273
Starting Air Pilot Valve/Starting Valve/Main Starting Valve
Check staring valves for tightness
161
Main Diesel Engine No. 3
303
Fuel Injection Pump
Detach, disassemble and check one injection pump together with drive and cam follower
112, 200, 201
Main Diesel Engine No. 3
305
Fuel Injection Pump
Remove and replace all baffle screws
112, 200, 201
Main Diesel Engine No. 3
322
Fuel Injection Valve
Remove injection valves, check nozzle elements and replace if required
221
Main Diesel Engine No. 3
941
Turbocharger
Check locating bearing
500
Main Diesel Engine No. 3
951
Turbocharger
Major Overhaul-

Remove, clean and check all components of the turbocharger. Check gaps and clearances on reassembly

500
Main Diesel Engine No. 3

7.4.1 Contractor shall facilitate the procurement of any additional parts required. Contractor will be compensated, via condition report for additional parts.

7.5 Cylinder Head:

7.5.1 Cylinder head to be refurbished in accordance with the OEM recommended practices and procedures. If cylinder head cannot be overhauled onsite, OEM will fabricate the shipping container for the cylinder head, crate cylinder head for shipping, and ship to a facility for overhaul, hydrostatic testing, ABS survey and return to vessel for reinstallation.

7.6 Turbocharger:

7.6.1 If turbocharger cannot be overhauled onsite, OEM will fabricate the shipping container for the turbocharger rotor assembly, crate turbocharger for shipping, and ship to a facility for overhaul and return to vessel for reinstallation.

7.6.2 All parts that are required to be IMO certified for IAPP shall be procured directly from the OEM to meet IMO requirements. These parts shall be noted and included in the service report.

7.7 Reports: Provide service report in pdf format. One copy of the report shall be turned over to the Chief Engineer. One copy of the report shall be turned over to the Port Engineer. The report shall contain the following as minimum:

· Engine operating hours and Serial No.

· Photographs of the engine condition at disassembly and any unusual conditions.

· Description of any abnormal or usual conditions found during maintenance.

· A positive statement indicating that each of the Table 1 maintenance items has been completed.

· Measurements taken and recorded for items in Table 1 shall be included in the report and compared with specified values listed in Reference 2.1 Operating Instructions. Both the specified value and the recorded value shall be listed in the report.

· Include comments on any defects found in arrangements for removals and lifting of engine components.

· Include a listing of any additional special tools found to be needed for successful maintenance on engine.

· Include a listing of all parts used during maintenance. The parts list shall include the Sub-Assembly Drawing No. and Part No.

· Include a listing of all parts included in the parts kit or ordered and not used. Items turned over to ship’s Force.

· Flexible coupling alignment measurements per the applicable work card and reference 2.4 Appendix C Alignment Log Sheet.

· Crankshaft Deflection readings per the applicable work card and reference 2.4 Appendix D Crankshaft Deflection Record Sheet.

· Main Bearing axial clearance.

· Main bearing lower cap condition on the one bearing per engine removed. Include photos.

· Big-End bearing shell condition on the one bearing per engine removed. Include photos

· Piston condition, piston removed and the disassembled piston. Include photos. Include axial clearance of the piston rings in the grooves.

· Cylinder liner dimensions per the applicable work card. One liner of the engine shall be recorded.

· Cylinder head conditions. One cylinder head.

· Inlet valve condition including valve rotators, and valve seats. Two inlet valves per cylinder.

· Exhaust valve condition including valve rotators, and valve seats. Two exhaust valves per cylinder.

· Include all start air valve tightness check results.

· Include injection pump and cam follower condition. One per engine is removed and disassembled. Measure and make note of the radial and axial play of the fuel pump drive cam follower rollers and compare against permitted value.

· Fuel injection valve condition, per check sheet.

7.7.1 ABS:

7.7.1.1 MSCREP will coordinate ABS support.

7.7.1.2 Upon completion of MDE reassembly, Contractor will demonstrate engine safeties for ABS with ship’s force.

7.7.2 Testing: Perform MDE testing IAW Reference 2.7; T-AKE Class Pre-underway Testing Requirements.

7.8 Preparation of Drawings: None additional.

7.9 Manufactures Rep:

7.9.1 Provide MAN OEM Technical Representative to perform this work item.

Point of Contacts For OEM Technical Services:

Adel Mousa

Applications & Project Manager

Motor Service Hugo Stamp, Inc.

954-763-3660 Off 954-648-6189 Cell 954-763-2872 Fax adel.mousa@mshs.com or Eric Ericson Fairbanks Morse Engine (FME)

630 Tidewater Drive

Norfolk, VA 23504

757-623-2711

800-322-7241

FAX 757-627-4570

Gregg Bellows Fairbanks Morse Engine (FME)

1545 Tidelands Ave

Suite J

National City, CA 91950 619-477-3218, Ext. 104 619-414-6996, Cell

619-477-3021, Fax Gregg.Bellows@FairbanksMorse.com

8.0 GENERAL REQUIREMENTS: None additional.

SO-18-002-1