1.0 ABSTRACT

1.1 Perform corrective maintenance on the Electronic Chart Display Information System (ECIDS) system.

2.0 REFERENCES

2.1 References

2.1.1 ECDIS Operation Manuals

3.0 LIST OF EQUIPMENT/LOCATION/QUANTITY

3.1 Location/Quantity

3.1.1 Location: Port ECDIS BCC7 & ECDIS Navigation Station 2

3.2 Manufacturers data:

QTY DESCRIPTION

1 ECDIS Processor located in BCC7

1 ECDIS Navigation Station 2

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES - None

5.0 NOTES

5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR’s) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 24, 28 and 29.

5.2 The contractor and all subcontractors, regardless of tier, must consult the General

Technical Requirements to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR's including but not limited to GTR's 1 through 7, 25, 28, and 29.

5.2 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item.

5.3 This ship contains High Voltage (HV) electrical systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area without proper authorization.

6.0 QUALITY ASSURANCE REQUIREMENTS

6.1 None additional

7.0 STATEMENT OF WORK REQUIRED

7.1 Arrangements/outfitting: None

7.2 Structural: None

7.3 Electrical: None

7.4 Electronic

7.4.1 Test/Diagnosis the Electronic Chart Display Information System (ECIDS) system in accordance with reference 2.1.1. Inspect for loose, missing, worn, damaged, burned, hardware, wiring, PCB, modules, and subassemblies. Crew reports Conning ECDIS is intermittently rebooting itself without any operator input. Crew also reports ECDIS Navigation 2 station is not displaying charts.

The drop down chart list for C-MAP only lists the small scale charts. Report findings to Chief Engineer prior to performing corrective maintenance action associated with faulty ECDIS system components.

7.5 Drawings: Not used

7.6 Inspection/Testing

7.6.1 The MFR REP shall perform 2 tests/inspections on the systems. Upon completion of work demonstrate satisfactory operation to the Chief Engineer Representative onboard. Provide 24 hours notice and submit a call out report to the Chief Engineer for final test and demo of the ECDIS operations. Provide a written report to the MSC REP delineating the work performed, discrepancies noted and corrective actions taken. Include equipment MAKE, MODEL, SERIAL NUMBERS/PART NUMBERS, SOFTWARE VERSION, and OPERATION MODES where applicable.

7.7 Painting: None.

7.8 Marking: None.

7.9 Manufacturer's Representative

7.9.1 The contractor shall engage the services of a manufacture’s representative (MFR

REP) to perform the work in this spec item on the ECDIS System. The following is a suggested source to perform this work. Other sources may be accepted if they provide the MSC REP in writing a certificate of successful completion of an OEM maintenance course for this equipment.

8.0 ADDITIONAL REQUIREMENTS: None Additional

9.0 PERIOD OF PERFORMANCE: July 15-18, 2018

10.0 PERFORMANCE LOCATION: Guam.