USNS LARAMIE

T-A0 203

HULL & ELECTRICAL

RFP NO: N21857-0220-5032

Aug 2010

ITEM NO. 122

CATEGORY "A"

MSFSC/ ADC

TITLE: DJC2 STAFF MODULES LOCATION 07 LEVEL

1.0

ABSTRACT

1.1 This work item requires contractor to modify existing deployment joint command and control (DJC2) electrical and structural drawings to be used for New DJC2 Installation. The three staff modules will be located on the 07-Level.

2.0

REFERENCES/ENCLOSURES

2.1 References:

2.1.1 Existing: MSC DWG; 302-8389982 DJ2C Power System Installation.

2.1.2 Existing: MSC DWG; 302-8389983 DJ2C Structural Modification.

2.1.3 Existing: Finite element analysis (FEA)

2.1.4 MSC DWG NR. 07 Level Potential Location, Bill Robblee, MSC N752 08/05/2010 Bill Robblee.

Enclosure;

2.2.1 None .

3.0

ITEM LOCATION/DESCRIPTION

3.1 Location/Quantity:

3.1.1 Location: Contractor Facility

CDI Marine Company

415 Port Centre Parkway

Portsmouth. VA 23704

(757) 397-8000 Steve Murphy

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES

4.1 None

5.0

NOTES

5.1 Performance Period: Aug 23 thru Nov 30, 2010. Includes, ABS Approval.

5.2 Point of Contact: Derek Chatterpaul; Tel (757) 443-0981 / 434-2700

Bill Robblee, Senior Naval Architect, Military Sealift Command, N75 In-Service Engineering Branch, Bldg: 238 Camp Pendleton, 471 East C Street, Norfolk, VA 23511-2914

Ph: (757) 417-4548

Cell: (757) 943-7950

Fax: (757) 417-4498

6.0 Not Used

7.0 STATEMENT OF WORK REQUIRED

Note: DJC2 Structural Installation shows qty 3 -20 ft containers and qty 3-10 ft containers on the bow of the ship.

New DJC2 installation shows qty 3 -20 ft containers on the 07-level and qty 3 -10 ft containers remain on the bow. Electrical and break wall on the bow will remain the same.

BACKGROUND

Deployable, Modular & Scalable Joint C2 Afloat

Prototype Modular DJC2 Core re-hosted in ISO containers Employs LCS Mission Module concept

DJC2 Program of Record Networks, C2 and communication architecture

Requires only space (“footprint”) and ship’s power (440V/60HZ)

Re-hosted Core DJC2 capabilities SIPR/NIPR/CENTRIXS/NGO networksDJC2 CORE T-SCIF (CJWICS) & GBS NOT included in prototype

VoIP telephony

Video Distribution Suite with VTC

IP Communications Suite —Cipher Text/Black Core

Supports up 120 operators in Modules and in ship’s available interior spaces.

OBJECTIVE

1. To provide electrical power, structure support to three (3) staff modules.

Modules:

a. Tech Control Module (TCM 1, 2, 3) Weight: 10,500 LBS 10 ft x 8 ft x 10 ft

b. Staff Module 1, 2 and 3, Weight: 9,300 LBS, 20x8x10 ft

2. Location: TCM Modules: Location: Bow (same as existing) Location: Staff Modules: 07 Level reference 2.1.4.

STATEMENT OF WORK

7.1 Using previously ABS approved drawings reference 2.1.1 and 2.1.2 and FEA reference 2.1.3 to accomplish following:

7.2 Conduct a ship check the week onboard USNS Kanawha (T-AO 196). All information for development of work item shall be collected during this ship check. All design work should be based on ship check results and actual verification of available reference drawings. Work to accomplished in accordance with ABS and USCG requirements.

7.3 Perform engineer design work to accomplish following: Staff Module -07 Level

a. Develop electrical drawings to support module.

b. Develop structural drawings for mounting module, under deck support.

c. Develop breakwater bulwark to protect modules if required.

d. Fiber-optic cables between TCM Modules and Staff Modules.

d. New installations drawings.

e. Bill of Materials

f. Modify ship’s electrical and structural drawings.

g. Develop work Item.

h. Prepare complete work package for ABS submittal and approval.

1. The contractor shall use the previously provided guidelines:

1) General Technical Requirements (GTRs)

2) Guidance from MSC POC

3) Minimize the need for large relocations of structure and electrical systems such as wireways, manholes, breaker panels, etc…

2. The design shall be in accordance with all ABS Rules, USCG Regulations, MSC General Technical Requirements and IEEE standards.

DELIVERABLES

Task Status – Contractor POC shall provide the MSC POC a weekly task status report, either verbally or via email. Status report shall include task progress, estimated completion dates, and problem areas.

Group 1 Deliverables – Group 1 preliminary deliverables are initial drawings for MSC review and comment. Group 1 deliverables shall include three (3) hard copies and one (1) electronic copy of the drawings and summary.

Group 2 Deliverables – Group 2 preliminary deliverables are a revised submission of Group 1 items incorporating MSC comments. Group 2 deliverables shall include three (3) hard copies and one (1) electronic copy of the drawings and summary. Group 2 deliverables are due 1 week following receipt of MSC comments.

Note: Each page of each preliminary deliverable is to be stamped either “Draft” or “Preliminary”. Electronic copies are to be provided in AutoCad 2000 format.

GOVERNMENT FURNISHED INFORMATION

(previously provided)

1. Deployable Joint Command & Control (DJC2) Basic Technical Package.

2. Deployable Joint Command and Control Maritime Variant T-AO Installation DRAFT.

3. SEATEL Antenna pdf.

3. T-AO layout –PPT file

4. Ships Plan Index

5.Ship structural and electrical one line drawings.

5. GTRs

6. MSC Title block