RFP_and_TOC_Cover-MG_Final.pdf
PDF 144 KB Posted
- Attached to
- Repair MG1 and DC Switchboard Substation 3 Federal contract opportunity
- Solicitation number
- N4008519B3614
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4008519B3614_0004.pdf | ||
| Part_1_Proposal_Forms_and_Documents_Rev1.pdf | ||
| N4008519B3614_0003.pdf | ||
| RFIS_-_Repair_MG1_and_DC_SB_SUB3.pdf | ||
| Sign_In_Sheet_-_Rpr_MG1_and_DC_SB3_Signed.pdf | ||
| N4008519B3614_0002.pdf | ||
| N4008519B3614_0001.pdf | ||
| Part_1_Proposal_Forms_and_Documents.pdf | ||
| N4008519B3614.pdf | ||
| Part_2_Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eProject # 1595595
DESIGN-BUILD SERVICES
REQUEST FOR PROPOSAL
UEM RM Repair MG1 and DC Switchboard
Substation 3, Building 175 at the
Portsmouth Naval Shipyard, Kittery, Maine
12 DEC 2018
PREPARED BY:
PWD Maine-FEAD Portsmouth
Building 59, Kittery, ME
MIDLANT, PWD-MAINE
Table of Contents – Request for Proposal, Parts 1‐6
Design Build RFP UEM Repair MG#1 & DC Switchboard at Substation 3
Portsmouth Naval Shipyard, Kittery, ME Dec 12, 2018
PART 1 – PROPOSAL FORMS AND DOCUMENTS 1
1 00 22 13.00 20 Supplementary Instructions to Offerors 2 General Requirements Attachment A Project Specific General Requirements
PART 2 – REQUIREMENTS 2
DIVISION 01 ‐ GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK PNSY PROJECTS
01 14 00.00 22 WORK RESTRICTIONS (PWD ME) [PNSY PROJECTS]
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES (PWD ME) DB PROJECTS
01 30 00.00 22 ADMINISTRATIVE REQUIREMENTS (PWD ME)
01 31 23.13 22 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 22 QUALITY CONTROL FOR MINOR CONSTRUCTION [PWD ME]
01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (PWD ME)
01 57 19.00 22 TEMPORARY ENVIRONMENTAL CONTROLS – PNSY (PWD ME)
01 74 19.00 22 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT (PWD ME)
01 78 00.00 22 CLOSEOUT SUBMITTALS (PWD ME)
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 22 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
DIVISION 02 ‐ EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 16.00 22 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
(PWD ME)
02 83 13.00 22 LEAD IN CONSTRUCTION (PWD ME)
Table of Contents – Request for Proposal, Parts 1‐6
Design Build RFP UEM Repair MG#1 & DC Switchboard at Substation 3
Portsmouth Naval Shipyard, Kittery, ME Dec 12, 2018
DIVISION 26 – ELECTRICAL
26 23 00 LOW‐VOLTAGE SWITCHGEAR
26 24 16.00 40 PANELBOARDS
DIVISION 31 – EARTHWORK
31 23 00.00 22 EXCAVATION AND FILL
DIVISION 33 – UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
PART 3 – PROJECT PROGRAM 3
Chapter 1 Project Description Chapter 2 Project Objectives Chapter 3 Site / Building Analysis Chapter 4 Building Requirements Chapter 5 Room Requirements Chapter 6 Engineering Systems Requirements
PART 4 – PERFORMANCE TECHNICAL SPECIFICATIONS 4
1. General Requirements
PART 5 – PRESCRIPTIVE SPECIFICATIONS 5
1. Requirements and RFP Drawings
PART 6 – ATTACHMENTS 6
A – Request for Proposal Drawings
B – Building Drawings
C – Reference Drawings
D – Other Standards
File details come from the government source that posted it.